FAST TRACK SEWER ENGINEERING CERTIFICATION
RECEIVED/NCDENR/DWR
PERMITTEE: Town of Beaufort
PERMIT#: WQ0040181
PROJECT: Orange Street Sewer Replacement SEP 0 3 2024
ISSUE DATE: August 7, 2018
Water Quality Regional
COUNTY: Carteret Operations Section
Wilmington Regional Office
This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of
this permit until the Division has received this Certification and all required supporting documentation.
Consequently, it should be submitted in a manner that documents the Division's receipt. Send the
required documentation to the Wilmington Regional Supervisor, Water Quality Section at the address at
the bottom.
Any wastewater flow made tributary to the wastewater collection system extension prior to completion
of this Certification shall be considered a violation of the permit and shall subject the Permittee to
appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up
until a final certification is received. A Final Certification shall be a complete set of record drawings and
design calculations regardless of whether partials have been submitted.
PERMITTEE'S CERTIFICATION
I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant
to the applicable standards & requirements, the Professional Engineer below has provided applicable
design/construction information to the Permittee, and the Permittee is prepared to operate & maintain
the wastewater collection system permitted herein or portions thereof.
11111,2,
E. Todd Clark, Town Manager
Printed Name,Title gSiig�n_4(ure Pa/to
i
ENGINEERS CERTIFICATION
I, .sft(A 0 I:LL as a duly registered Professional En fneer in the State of North Carolina,
having been authorized to observe ([N periodically, ❑ weekly, [] full time) the construction of the
project name and location as referenced above for the above Permittee hereby state that, to the best of
my abilities, due care and diligence was used in the observation of the construction such that the
construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T; the
Division of Water Resources'(Division)Gravity Sewer Minimum Design Criteria adopted February 12,1996
as applicable; the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and
Force Mains adopted June 1, 2000 as applicable; and other supporting materials.
North Carolina Professional Engineer's Seal w/signature & date 0�LOF
(-"'
® Final ❑ Partial
Certification Comments/Qualifiers: '•• �
,��`.............
/�
NC DWR—Water Quality Regional Operations Section 127 Cardinal Drive Extension Wilmington, NC 28405
Wilmington Regional Office Phone: 910-796-7215 FAX:910-350-2004
SEWER ENGINEERING CERTIFICATION CHECKLIST
To be completed by the certifying engineer prior to operation of the permitted sewers, per 15A NCAC 02T.0116.
Certifying Engineer: Sam Bell, PE
Certification Review Date: 09/04/2024
Project Name: Orange Street Sewer Replacement
WQoo 40181 Project County: Carteret
I
i
1) Has permittee information changed since the permit was issued (or last modified): change of mailing address, I
change of ownership, transfer from developer to HOA/POA, etc. ❑Yes ® No
• If yes, please provide either a change of ownership form or new contact information. Note that transfer of
permits from the developer to the HOA/POA must occur with the first certification.
2) Have the as-built drawings have been signed,sealed,and dated by an N.C, PE? ® Yes ❑ No
3) Final Engineering certification? ® Yes ❑ No
• If Partial Engineering certification, provide detailed narrative including what is being certified in the current
phase,what was previously certified(if applicable),and what is left to be certified. '
4) Adequate information related to sewer lines: ® Yes ❑ No ❑ N/A
• Three feet minimum cover has been provided for all sewers unless ferrous pipe was installed.
• Minimum diameters for gravity sewers are 8-inches for public lines and 6-inches for private lines.
• Manholes have been installed:At the end of each line, at all changes in grade,size,or alignment,at all
intersections, and at distances not greater than 425 feet; minimum diameter shall be 4 feet(48-inches).
5) Adequate information related to pump stations: ❑ Yes ❑ No ® N/A
• Ensure power reliability option was selected per 15A NCAC 02T.0305(h).
6) Was project construction completed in accordance with all of the following: ® Yes ❑ No ❑ N/A
• 15A NCAC 02T, Minimum Design Criteria (MDC)for the permitting of Gravity Sewers (latest version), and MDC
for the Permitting of Pump Stations and Force Mains (latest version)?
If not, a variance approval is required in accordance with 15A NCAC 02T.0105(b), prior to certification and operation.
• Contact the Central Office to discuss the variance to determine a course of action.
• Applicant must submit two copies of the variance request form, plans,specifications,calculations, and any other
pertinent information to the Central Office (one hard copy, one digital copy).
• The central office will review the variance request, and if approvable,specific language regarding the variance
will be incorporated into the permit, either via a special condition or a supplementary letter. A copy of the
reissued permit with variance language or the variance letter must be maintained with the original documents.
7) Does the project contains high priority lines (15A NCAC 02T.0402(2))? ❑ Yes ® No
If yes,ensure that the permit already contains the necessary condition related to high priority lines 15A NCAC
02T.0403 (a)(5). If the permit does not include this language,the Fast Track reviewer will reissue the permit with
the appropriate language,
8) Are Permit modifications are required for any changes resulting in non-compliance with this permit(including pipe
length difference of 10%or greater,change in flow,pump station design capacity design change of 5%or greater,and
change in the number/type of connections)? ❑ Yes ® No
• If yes, a permit modification request must be submitted to the appropriate Regional Office, and a modified
permit with revised certification must be issued prior to certification and operation.