HomeMy WebLinkAboutWQCS00056_SP-2024-0018_20240904 Docusign Envelope ID:8104E169-B473-49FF-923A-D45EC046088C
M Y b.ufs
ROY COOPER _
Governor 1
ELIZABETH S.BISER t,,I,. .
Secretary "p`"
RICHARD E.ROGERS,JR. NORTH CAROLINA
Director Environmental Quality
Certified Mail # 7017 2680 0000 2236 6392
Return Receipt Reauested 9/4/2024
Jack Meadows, Interim Town Manager
Town of Siler City
PO Box 769
Siler City, NC 27344-0769
SUBJECT: SOC Stipulated Penalty—FINAL NOTICE
Tracking Number: SP-2024-0018
Special Order by Consent: WQ S22-003
Town of Siler City
Chatham County
Dear Mr. Meadows:
This letter transmits a FINAL NOTICE of a stipulated penalty assessed against the Town of Siler City in the
amount of $141,000.00. This assessment is based upon the violation of condition(s) stated in the existing
Special Order by Consent (SOC) WQ S22-003.
Section 2 (a) of the SOC requires the permittee to have completed the following scheduled activity by December
30, 2023: Award Construction Contract for Main Interceptor Replacement Project. At the request of the
permittee, the due date was extended to March 29, 2024.
You were notified of the violation, the Division of Water Resources' (DWR's) intent to assess stipulated penalties,
and of your right to justify the failure to meet the scheduled activity date in Notice of Violation (NOV) letter NOV-
2024-SP-0006, dated April 10, 2024. DWR did not receive a response to NOV-2024-SP-0006.
DWR was informed via email correspondence on July 17, 2024, that a construction contract for the Main
Interceptor Replacement Project was awarded on June 11, 2024.
Pursuant to Section 5 (c) of the subject SOC, the stipulated penalty for failure to complete a scheduled activity by
the date specified in Section 2 is equal to $1,000.00 per day for the first seven (7) calendar days and $2,000.00
per day thereafter. The scheduled activity Award Construction Contract for Main Interceptor Replacement Project
was completed 74 days late, therefore the stipulated penalty of $141,000.00 is now due.
D EQ�� North Carolina Department of Environmental Quality I Division of Water Resources
Raleigh Regional Office 13800 Barrett Drive I Raleigh,North Carolina 27609
opart`"I of � 919.791.4200
eoanmem of eo.�.00meo�i u.au�
Docusign Envelope ID:8104E169-B473-49FF-923A-D45EC046088C
Payment should be made directly to the order of the Department of Environmental Quality. Payment of the
penalty will not foreclose further enforcement action for any continuing or new violation(s). Please submit
payment to the attention of:
Wren Thedford
NC DEQ/DWR/Water Quality Permitting Section
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
The total amount due for stipulated penalties is $141,000.00. Pursuant to 15A NCAC 021 .0110, to avoid legal
action by the Attorney General's Office (AGO), you must pay the full amount listed above within thirty (30)
days of receipt of this letter. Make checks payable to NC DEQ and include the SOC number on the check(s)
submitted.
If you have any questions about this letter, please contact Jesse Barnes of the Raleigh Regional Office at (919)
791-4254.
Sincerely,
Docu/Signed by:
8328B44CE9EB4A1...
John Hennessy, Section Chief
Water Quality Regional Operations Section
Division of Water Resources, NC DEQ
Cc: Chris McCorquodale, Town of Siler City Public Utilities Director (cmccorquodale@silercity.gov)
Laserfiche Files
D E Q�� North Carolina Department of Environmental Quality I Division of Water Resources
Raleigh Regional Office 13800 Barrett Drive I Raleigh,North Carolina 27609
oeoanmem of ioo-o.m..�i oan� 919.791.4200