Loading...
HomeMy WebLinkAboutGW1--05152_Well Construction - GW1_20240830 WELL CONSTRUCTION RECORD For Internal Use ONLY: I This form can be used for single or multiple wells I.Well Contractor information: John W. Huneycutt 14.WATER ZONES FROM TO DESCRIPTION Well Contractor Name 50 ft. 54 ft. 1 gpm (165-170'=1 gpm) 2465-A 350 rt. 389 ft. 1 gpm NC Well Contractor Certification Number 15.OUTER CASING(for multi-cased wells)OR LINER(if ap cable) FROM TO DIAMETER THICKNESS MATERIAL Derry's Well Drilling, Inc. o ft. 45 ft- 61/8 1n' SDR-21 PVC Company Name 16.INNER CASING OR TUBING(geothermal closed-loop) 371959 FROM TO DIAMETER THICKNESS MATERIAL 2.Well Construction Permit#: ft. ft. in. List all applicable well permits(i.e.County,State,Variance,Injection,etc.) ft. ft. in. - 3.Well Use(check well use): 17.SCREEN Water Supply Well: FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL DAgricultural ❑Municipal/Public ft. ft. in. ft' ft. 1O'❑Geothermal(Heating/Cooling Supply) iDRcsidential Water Supply(single) ❑Industrial/Commercial ❑Residential Water Supply(shared) 18.GROUT FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT ❑Irrigation 0 ft. 3 ft• Bent.Chips Gravity Non-Water Supply Well: ❑Monitoring ❑Recovery 3 ft. 20 ft Bentonite Pumped injection Well: ft. ft. ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK(if applicable) FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Storage and Recovery ❑Salinity Barrier ft. ft. ❑Aquifer Test ❑Stormwater Drainage ft. ft. ❑Experimental Technology ❑Subsidence Control 20.DRILLING LOG(attach additional sheets if necessary) OGeothermal(Closed Loop) ❑Tracer FROM TO DESCRIPTION(color,hardness,sod/rock type,grain size,etc.) ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) 0 ft• 25 ft. Brown Dirt 4.Date Well(s)Completed: 5/18/24 Well ID# 25 ft' 400 ft. Slate ft. ft. 5a.Well Location: ft. ft. Venture 8 Property Experts LLC ft. ft. Seams:47', 50-54'=1g, 147', 165'=1g, Facility/Owner Name Facility iD#(if applicable) ft. ft. 200',248',292',350-389'=1g Coyle Rd., Stanfield 28104 (Lot 3) ft. ft. -__ - Physical Address,City,and Zip 21.REMARKS ,y s. f," Stanly 137646 '+ °� County Parcel Identification No.(PIN) AU G e► 0 [G24 5b.Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22.Certification: If,.r;,: _ - ,. -• (if well field,one lat/long is sufficient) / • N W Si ure of Certified Well Contractor Date 6.Is(are)the well(s): ElPermanent or ❑Temporary By signing this form,I hereby certify that the well(s)was(were)constructed in accordance with 15A NCAC 02C.0100 or ISA NCAC 02C.0200 Well Construction Standards and that a 7.Is this a repair to an existing well: ❑Yes or EINo copy of this record has been provided to the well owner. If this is a repair,fill out known well construction information and explain the nature of the repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8.Number of wells constructed: 1 construction details. You may also attach additional pages if necessary. For multiple injection or non-water supply wells ONLY with the some construction,you can submit one form. SUBMITTAL INSTUCTIONS 9.Total well depth below land surface: 400 (ft.) 24a. For All Wells: Submit this form within 30 days of completion of well For multiple wells list all depths if different(example-3@200'and 2@i00') construction to the following: 10.Static water level below top of casing: 30 (ft.) Division of Water Resources,Information Processing Unit, If water level is above casing,use"-" 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: 6 (in.) 24b. For injection Wells ONLY: In addition to sending the form to the address in Rota 24a above, also submit a copy of this form within 30 days of completion of well 12.Well construction method: ry construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Resources,Underground injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield(gpm) 3 Method of test Air 24c.For Water Supply&Injection Wells: Also submit one copy of this form within 30 days of completion of 13b.Disinfection type: Granular Amount: 1/2 lb. well construction to the county health department of the county where constructed. Form GW-1 North Carolina Department of Environment and Natural Resources—Division of Water Resources Revised August 2013