HomeMy WebLinkAboutWQ0000484_Monitoring - 09-2022_20221003t I� FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page 1 of 1
Did the mass loading rates exceed the limits in Attachment B of your permit? Compliant ❑ Non -Compliant
If the facility is non -compliant,, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken- Attach nrirlitinnni chaptc if naraccon,
Operator in Responsible Charge (ORC) Certification
ORC: Robert Jackson
Certification Number: 1008145
Grade: IV OIT Phone Number: 910-359-5275
Has the ORC changed since the previous NDMLR? ❑ Yes 0 No
J Signature
By this signature, I certify that this report is accurrale and complete to the best of my knowledge.
Permittee Certification
Permittee:
Mountaire Farms Inc
Signing Official:
David White
Signing Officials Title: Director of Processing
Phone No.: 910-359-5275 Permit Exp.: 2/28/23
10/3/22 10/3/2e
Date Signature Date
I certify, under penalty of law, that this document and all attachments were prepared under my dire;. ,n or supervi IS on in
accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the
information submitted. Based on my inquiry of the person or persons who manage the system, or those persons,directly
responsible for gathering the information, the information submitted is, to the best of my knowledge and belief; true,
accurate, and complete. I am aware that there are significant penalties for submilting false information, including the,
possibility of fines and Imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Resources (i
Information Processing Unitr
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page )=- of rt
Permit No.: WQ 0000484
Facility Name: Mountaire Farms Inc
County: Robeson
Month: September
Year: 2022
Field Name:
Y Field Name: Z Field Name:
Field Name:
Field Name:
Area (acres):
3.65
Area (acres):
7.1
Area (acres):
Area (acres):
Area (acres):
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Field Loaded?
0 YES 2140
Field Loaded?
❑,YES Q NO
Field Loaded?
❑ YES 0 NO
Field Loaded?
❑ YES Q No
Field Loaded?
❑ YES Q NO
°
a°f
a,
>°
o
�
06
0
zQ°o
z
v
z
<oz
�
zo
z
za
a
a
CL
EL
CL
IL
Q
IL
aa
C
JE
J
zE
Q
��
z
N
J
d
NJ.
Jo
E
a
°
E
U
E �
ai
z
ao
QU
°
i°
>
Q�
Month
,al
mg/L
16.12
Ibs/ac
15.7
Ibs/ac
15.7
gal
mg/L
16.12
Ibs/ac
ibs/ac
gal
mg/L
16.12
Ibs/ac
Ibslac
gal
mg/L
16.12
lbs/ac
lbsiac
gal
mg/L
16.12
Ibs/ac
lbs/ac
October
'%,a00
November
495,000
18.66
21.1
36.9
18.66
18.66
18.66
18.66
December
408,750
16.31
15.2
52.1
16.31
16.31
16.31
16.31
January
367,500 .
11.05
9.3
61.4
11.05
11.05
11.05
11.05
February
311,250
15.48 1
11.0
1 72.4
__ -
15.48
_-_ _�
_ _----__-- -
-15.48_
-_--__.
-- - __
-•__-�
15.48
---
_ - --
--15A8-
-
-
March
228,750
10.89
5.7
78.1
10.89
10.89
1 1
10.89
10.89
April
326,250
12.18
9.1
87.1
12.18
12.18
12.18
12.18
May
401,250
14.11
12.9
100.1
14.11
14.11
14.11
14.11
June
378,750
8.26
7.1
107.2
8.26
8.26
8.26
8.26
July
315,000
16.85
12.1
119.4
16.85
16.85
16.85
16.85
August
285,000
14.21
9.3
128.6
14.21
14.21
1
14.21
14.21
September
423,750
16.43
15.9
144.5
16.431
16.43
16.43
16.43
12 Month Floating PAN Load
-
(ibslaclyr):
144.5
' ��.
0.0
.>
0.0
0.0
350.00
\
0.0
350.00
Annual PAN Load Limit
(Ibs/a Limit
350
350.00Lr
-
350.00
FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page J of�
Permit No.: WQ 0000484
5apility Name: Mountaire Farms Inc
County: Robeson
Month: September
Year: 2022
Field Name:
U Field Name: V Field Name:
W Field Name:
X1 Field Name:
X2
Area (acres):
3.65
Area (acres):
14.7
Area (acres):
11.08
Area (acres):
25.83
Area (acres):
11.55
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Field Loaded?
❑ YES I] No
Field Loaded?
❑ YES Q No
Field Loaded?
❑ YES 0 No
Field Loaded?
❑ YES [D No
Field Loaded?
❑ YES ❑ NO
a
°C
v
aQ
Q
zfaR
z
Z oQ
Q
IL
o
Q
N
0
9
as
O
o
a
a
4
d
G
Q'
O.
Q
0
a)
>a °0
cc
❑
M
°7
J
E Z
d
O
7-3
Q
d
0)
°7
M
0J
Q
C
Q
d
O
N
OE
0
J
a
a
E
E Q
Q
E
zCD
Eo
o
j
°
a
a
°
Q
U
oQ
°UQ
a
>
>
Qy U
Month
gal
mg/L
Ibs/ac
Ibs/ac
gal
mg/L
Ibslac
Ibslac
gal
mg1L
Ibslac
Ibs/ac
gal
mg/L
Ibs/ac
lbslac
gal
mg/L
Ibs/ac
Ibslac
October
225,000
16.12
8.3
8.3
16.12
19.4
19.4
1,710,000
16.12
20.7
20.7
3,762,000
16.12
19.6
19.6
1,653,000
16.12
19.2
19.2
November
265,500
18.66
11.3
19.6
18.66
21.2
40.7
1,725,000
18.66
24.2
45.0
3,993,000
18.66
24.1
43.6
1,754,500
18.66
23.6
42.9
December
258,750
16.31
9.6
29.3
E2.176,000
16.31
24.7
65.4
213,000
16.31
2.6
47.6
3,630,000
16.31
19.1
62.II
1,595,000
16.31
18.8
61.7
January
220,500
11.05
5.6
34.8
11.05
12.3
77.6
1,725,000
11.05
14.3
61.9
4,026.000
11.05
14.4
77.1'
1,769,000
11.05
14.1
75.8
February
297,000
15.48
10.5
45.3
_,___ _
__19.1
__96,7
___1,920,00D_ _ _ _
_15.48_
_ 22.4 -
--84.3-
-2;73%000-
16.48
-4a7-
90:8-
--1,783,500
-15:48-
19:9
95.7--
March
342,0 00
10.89
8.5
53.8
1,802,000
10.89
11.1
107.9
2,025,000
10.89
16.6
100.9
4,290,000
10.89
15.1
1 105.9
1,580,500
10.89
12.4
1 108.1
April
274,500
12.18
7.6
61.5
2,142,000
12.18
14.8
122.7
1,110,000
12.18
10.2
111.1
3,729.000
12.18
14.7
120.6
1,667,500
12.18
14.7
122.8
May
240,750
14.11
7.8
69.2
2,363,000
14.11
18.9
141.6
0
14.11
0.0
111.1
3,531,000
14.11
16.1
136.6
1,551,500
14.11
15.8
138.6
June
290,250
8.26
5.5
74.7
646,000
8.26
3.0
144.6
300,000
8.26
1.9
113.0
3,333,000
8.26
8.9
145.5
1,464,500
8.26
8.7
147.4
July
481,500
16.85
18.5
93.3
1,700,000
16.85
16.3
160.9
1,500,000
16.85
19.0
132.0
2,772,000
16.85
15.1
160.6
1,218,000
16.85
14.8
162.2
August
310,500
14.21
10.1
103.3
2,142,000
14.21
17.3
178.1
1,890,000
14.21
20.2
152.2
2,508,000
14.21
11.5
172.1
1,102,000
14.21
11.3
173.5
September
319,500
16.43
12.0
115.3
2,142,000
16.43
20.0
198.1
1,890,000
16.43
23.4
175.6
3,729,000 1
16.43
19.8
191.9 111,638,500
16.43 1
19.4
192.9
12 Month
Floating PAN
Load
°
(Ibs/ac/yr):
1153
198.1
175.6
191.9
192.9
Annual
PAN Load
Limit
(Ibs/ac/yr):
350
350.00
350.00
350.00`,
,
- FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page 4 of Q
Permit No.: WQ 0000484
Facility Name: Mountaire Farms Inc
County: Robeson
Month: September
Year: 2022
Field Name:
P Field (dame: Q Field Name:
R Field Name:
S Field Name:
T
Area (acres):
28.64
Area (acres):
23.8
Area (acres):
19.16
Area (acres):
12.74
Area (acres):
6.25
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Field Loaded?
❑ YES NO
Field Loaded?
❑ YES No
Field Loaded?
❑ YES EINO
Field 'Loaded?
❑ YES NO
Field Loaded?
❑ YES ❑✓ NO
m
z o
z
z o
Z
d
z°
m
z°
z
z co
z
Q
a
C
;z
EL
'
.
°
O.p
a'
°.
Cl
a `
Cc
a
-
E z
CA
Lo
z
a)
�
0
J
7
z
C
m
L O
J
Q
m
C
,0
ho
Jl
_
> o
o
o
a
f
= a
a)r
J=Q
>
j
j
a
U
a U
aa
U
Month
gal
mg/L
Ibs/ac
Ibs/ac
gal
mg/L
lbs/ac
Ibs/ac
gal
mg/L
Ibs/ac
Ibs/ac
gal
mg/L
Ibsi-
10 '
Ibslac
gal
mg/L
Ibs/ac
Ibs/ac
October
828,000
16.12
3.9
3.9
1,950,000
16.12
11.0
11.0
3,372,000
16.12
23.7
23.7
1,007,500
16.12
i 10.6
652,500
16.12
14.0
14.0
November
3,816,000
18.66
20.7
24.6
3,285,000
18.66
21.5
32.5
2,604,000
18.66
21.2
44.8
403,000
18.66
4.9
15.6
517,500
18.66
12.9
26.9
December
3,798,000
16.31
18.0
42.7
2,790,000
16.31
15.9
48.4
2,220,000
16.31
15.8
60.6
1,472,500
16.31
15.7
31.3
868.500
16.31
18.9
45.8
January
3,024,000
11.05
9.7
52.4
2,985,000
11.05
11.6
60.0
2,064,000
11.05
9.9
70.5
1,147,500
11.05
8.3
39.6
675,000
11.05
10.0
55.8
February 1
4,680,000
15.48
21.1
73.5
3,735,000
15.48_
20.3
1 80.3
1,980,00.0______
.1.5.48_
.-13.3 _
_83.8--
1,62-7,500_.
15.48
16:6---561---
-585,000
15.48
-12.1
-67.9-
March
3,312,000
10.89
10.5
84.0
3.870,000
10.89
14.8
95.0
2,784,000
10.89
13.2
97.0
1,720,500
10.89
12.3
68.3
679,500
10.89
9.9
77.7
April
3,924,000
12.18
13.9
97.9
4.560,000
12.18
19.5
114.5
3,504,000
12.18
18.6
115.6
1,767,000
12.18
14.1
82.4
774,000
12.18
12.6
90.3
May
3,582,000
14.11
14.7
112.6
3,525,000
14.11
17.4
131.9
2,796,000
14.11
17.2
132.8
1,720,500
14.11
15.9
98.3
666,000
14.11
12.5
102.9
June
3,816,000
8.26
9.2
121.8
3,270,000
8.26
9.5
141.4
2,364,000
8.26
8.5
141.3
1,968,500
8.26
10.6
109.0
630,000
8.26
6.9
109.8
July
4,626,000
16.85
22.7
144.5
14,150,000
16.85
24.5
165.9
2,724,000
16.85
20.0
161.3
1,999,500
16.85
22.1
131.0
891,000
16.85
20.0
129.8
August
3,636,000
14.21
15.0
159.5
3,285,000
14.21
16.4
182.2
2,268,000
14.21
14.0
175.3 11
1,767,000
14.21
16.4
147.5
697,500
14.21
13.2
143.1
September.
3,420,0001
16.43
16.4
175.9
3,120,000
16.43 1
18.0
200.2
2,232,000
16.43
16.0
191.3
2,170,000
16.43
23.3
170.8
828,000
16.43
18.2
161.2
12 Month Floating PAN Load
(Ibs/aclyr):
175.9
200.2
191.3
v
170.8
161.2
Annual PAN Load Limit
(Ibs/ac/yr):
350
350.00
350.00
350.00
350.00
.,`
FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page -_z, of 1
Permit No.: WQ 0000484
Facility Name: Mountaire Farms Inc
County: Robeson
Month: September
Year: 2022
Field Name:
K
Field Name:
L
Field Name:
M
Field Name:
N
Field Name:
O
Area (acres):
9.86
Area (acres):
24.94
Area (acres):
23.07
Area (acres):
78.87
Area (acres):
19.9
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Field Loaded?
[I YES NO
Field Loaded?
❑ YES R] 140
Field Loaded?
❑ YES 0 NO
Field Loaded?
❑ YES NO
Field Loaded?
❑ YES EINo
d
z o
z
°
v
Z o
z
zo
z
z
°
c
-
��
an
�
�
a
CL
a.Q
>
Qd
c9
O
Q
N
l0
J
QJ
�Qaam
J
o
J
E Z
Q
E
d
°°
Q
E
(Q
.°
0
E
v
0
°.
E
O
0,
0
°>o
z
2
U a
°
Q
°
>
°
QO
a.
>
°>
°
U a°.
>
>d
U
2
Month
gal
mg/L
Ibs/ac
Ibs/ac
gal
mg/L
Ibs/ac
Ibs/ac
gal
mg/L
Ibs/ac
Ibs/ac
gal
mg/L
Ibs/ac
Ibs/ac
gal
mg/L
Ibs/ac
Ibs/ac
October
1,717,000
16.12
23.4
23.4
3,965,000
16.12
21.4
21.4
2,007,500
16.12
11.7
11.7
9,834,000
16.12
16.8
16.8
2,916,000
16.12
19.7
19.7
November
1,878,500
18.66
29.6
53.1
3,471,000
18.66
21.7
43.0
2,750,000
18.66
18.6
30.2
8,217,000
18.66
16.2
33.0
2,784,000
18.66
21.8
41.5
December
1,173,000
16.31
16.2
69.2
2.600,000
16.31
14.2
57.2
1,512,500
16.31
8.9
39.2
8,052,000
16.31
13.9
46.9
2,472,000
16.31
16.9
58.4
January
1,946,500
11.05
18.2
87.4
3,107,000
11.05
11.5
68.7
3,602,500
11.05
14.4
53.6
7,260,000
11.05
8.5
55.3
2,304,000
11.05
10.7
69.0
February
425,000
15.48
5.6
93.0
2,496,000
15.48_
12.9
81.6
605,0.00_ __ __
_15.48
3.4
56.9
-8,1-18,000_
15.48
-•13.-3-
- 68:6-
2,988,000
15.48
19.4
88.4
March
0
10.89
0.0
93.0
2,756,000
10.89
10.0
91.7
1,430,000
10.89
5.6
62.6
11,385,000
10.89
13.1
1 81.7
2,832,000
10.89
12.9
101.3
April
1,521,500
12.18
15.7
108.7
3,575,000
12.18
14.6
106.2
0
12.18
0.0
62.6
10,494,000
12.18
13.5
95.3
2,664,000
12.18
13.6
114.9
May
1,088,000
14.11
13.0
121.7
2,652,000
14.11
12.5
118.7
2,860,000
14.11
14.6
77.2
7,392,000
14.11
11.0
106.3
2,304,000
14.11
13.6
128.6
June
1,751,000
8.26
12.2
133.9
3,354,000
8.26
9.3
128.0
3,300,000
8.26
9.9
87.0
9,075,00D
8.26
7.9
114.2
2,208,000
8.26
7.6
136.2
July
2,023,000
16.85
28.8
162.7
2,795,000
16.85
15.7
143.7
2,200,000
16.85
13.4
100.4
12,111,000
16.85
21.6
135.8
2,436,000
16.85
17.2
153.4
August
1,292,000
14.21
15.5
178.3
3,094,000
14.21
14.7
158A
1,980,000
14.21
10.2
110.6
9,141,000
14.21
13.7
149.5
2,436,000
14.21
14.5
167.9
September 1,564,000 16.43
21.7
200.0
3,068,000 16.43
16.9
175.3
2,585,000
16.43
15.4
125.9
6,666,000
16.43
11.6
161.1
2,256,000
16.43
15.5
183.5
12 Month Floating PAN Load
(Ibs/aclyr):H350:
175.3
125.9
161.1
183.5
Annual PAN Load Limit
(Ibs/ac/yr):
, .
350.00
350.00
350.0D
350.00
FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page )_ of
Permit No.: WQ 0000484
Facility Name: Mountaire Farms Inc
County: Robeson
Month: September
Year: 2022
Field Name:
F
Field Name:
G
Field Name:
H
Field Name:
.1
Field Name:
J
Area (acres):
26.53
Area (acres):
47.489
Area (acres):
14.19
Area (acres):
13.58
Area (acres):
58.22
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Field
Loaded?
❑ YES
[21 NO
Field
Loaded?
❑ YEs
QQ NO
Field
Loaded?
❑ YES
0 NO
Field
Loaded?
❑ YES
Q No
Field
Loaded?
[I YES
0 NO
Q
a
B.
Q2,
z
dv
zzQ
o
v
_
z
z�
zQ
z
°
°
°
o
a
>
o
Q
Q
a
QT
Q
> aa
mLO
�Q
7Z
Q
QCA
W
�
G
a
°-3
zE
Q
y�
s o
J°a
Ua
O
°
ja
a_
a
>
0
t
°Q
°
a U
U
Month
gal
mglL
Ibs/ac
Ibs/ac
gal_
Trig/L
Ibs/ac
lbslac
gal
mg/L
Ibs/ac
Ibs/ac
gal
mg/L
Ibs/ac'
Ibslac
gal
'mg/L
Ibs/ac
Ibs/ac
October
4,577,000
16.12
23.2
23.2
9,126,000
16.12
25.8'
25.8
1,080,000
16.12
10.2
10.2
625,000
16.12
6.2
6.2 _
9,824,500
16.12
22.7
22.7
November
4,301,000
18.66
25.2
48.4
9,090,000
18.66
-29.8
55.6
858,000
18.66
9.4
19.6
1,525,000
18.66
.17.5.
23.7
7,325,000
18.66
19.6
42.3
December
4,646,000
•16.31
23.8
72.2
948,000
16.31
2.7
58.3
930,000
"16.31
8.9
28.6
2,037,500
16.31
20.4
44.1
6,541,000
16.31
15.31
57.5
January
4,669,000
11.05
16.2
88.5
8,760.000
11.05
17.0
75.3
768,000
11.05
5.0
33.5
1550;000
11.05
7.8
51,9'
7,962,500
11.05
12.6
1 70.2
February
3,059,000
15.48
14:9
103.3
7,140,D00
_ 15.48
.49.4
99.7
_i792,00-0
1.5.48_
-7_2-
__40.8,-
A 587;5t)0-
--15.48
-15:1--,
7:0-
6366;000
-15:48
-14:6"-
--84:7-
16.6
111.4
March
4,025,000
10.89
13.8.
117.1
8,700,000
10.89
1,074,000
10.89
6.9
47.6
2,237,500
10.89
15.0
81.9
6,590,500
10.89
10.3
95.0
April
552,000
12.18
2:1
119.2
9,000,000
12.18
19.3
130.6
1,434,000
12.18
10.3
57.9
2,050,000
12.18
15.3
97.3
7,521,500
12.18
13.1
108.1
May
4,554,000
14.11
20.2
139.4
8,280,000
14.11
20.5
151.1
900,000
14.11
7.5
65.4
2,250,000
14.11
19.5
116.8
6,517,000
14.11
13.2
121.3
June
4,071,0001
8.26
10.6
150.0
21040,000
8.26
3.0
154.1
1.224,000
8.26
5.9
71.3
2,250,000
8.26
11.4
128.2
9.016,000
8.26
10.7
132.0
July
4,416,0001
16.85
23.4
173.4
16.85
10.7
164.8_
1,362,000 .
16.85
13.5
84.8
2,375,000
16.85
24.6
152.8
7,742,000
16.85
18.7
150.6
August
4,945,000
14.21
22.1
195.5
14.21
17.0
181.8
1,152,000
14.21
9.6
94.4 1
_
2412,500_
14.21
21.1
173.8
6,639,500
14.21
13.5
164.2
September
4.416,000
16.43
22.8
218.3
16.43
14.4
196.2
1,116,000
16.43
10.8
105.2
2.M,000
16.43
21.9
195:8
6,517.000
16.43
15.3
179.5
12 Month
Floating PAN
Load
218 3�
'
:.196.2
J3,63O,000
105.2195.8179
'(Ibs/ac/yr):
5Ay
nnual
PAN Load Limit
350
'
-350.00
r(Ibs/ac/yr): `
350.00
35D.00
350 00
-
v
FORM: NDMLR 10-13 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page I of�
Permit No.: WQ 0000484
Facility Name: Mountaire Farms Inc
County: Robeson
Month: September
Year: 2022
Field Name:
A
Field Name:
B
Field Name:
C
Field Name:
D
Field Name:
E
Area (acres):
8.25
Area (acres):
6.75
Area (acres):
13.6
Area (acres):
3.5
Area (acres):
4.7
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
Coastal/Oats
Cover Crop:
CoaslallOats
Cover Crop:
.Coastal/Oats
Load Type:
PAN
'Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN -
Field Loaded?
El YES 21NO
Field Loaded?
YES (] No
field Loaded?
❑YES 0 NO
Field Loaded?
❑ YES . p No
Field Loaded?
El YES NO
Z c
am
z
9
z c_
z
d
m
z c
z
Z c
Z
d
c
c
n�
�m
J
a.,
Q
a
am �
a
a
Vim.
�' o
a
o
nQ�
aQ
v
>�
O
.iQJ
o
a
a�
IL
a
a
>o
;-
B.
a
¢°
a io
a
a
��
�I
c0
p
O
tM
N
= O
r J
O
z
N
MC
2 Gil
T
w O
J
�J
z
Q
d
d.+
M
aw
L O
7
Q
y
dam,
to C
�,R
t 0
O
0
7
z
Q
0)�
d,�„
m C
•O
�,•O
N
cc O
J
Q (=j
V a
j
Q U
V a
O
Q 0
'J
U a
G.
> G.
0 �I
- U.
C
J
l a.
U
IL
OE
>
Q V
O
U
>
>
>
Month
gal
mg/L
Ibs/ac
Ibs/ac
_ c^T
mg/L
16.12
ibs/ac
14.6
lbs/ac
14.6•
gal
9D0,000
mg/L
16.12
Ibs/ac
8.9
Ibslac
8.9
gal
mg/L
16.12
Ibslac'
Ibslac
gal
mglL
16.12
Ibslac
Ibslac
October
733,500
16.12
12.0
12.0
73- -5uo.
November
706,500
18.66
13.3
25.3
706,500
18.66
1.16.3
30.9
0
18.66
0.0
8.9
18.66
18.66
December
769,500
16.31
12.7
38.0
769,500
16.31
15.5
46.4
360,000
16.31
3.6
12.5
16.31
16.31
January
580,500
11.05
6.5
44.5
580,500
11.05
' 7.9
54.3,
324,000
11.05
2.2
14.7
11.05
11.05
February
540,000
-
15.48 ,
--
8.5
52.9
-
540,000
15.48
16.3
64.7
1,224,000
15_48
11.6 .
_ 2(i 3
r
15.48_
--- -- --
- 15.48-
- --
- --
March
706,500
10.89
7.8
60.7
715,560
10.89
9.6
74.3
1,908,000
10.89
12.7
.39.1
10.89
10.89
April
688,500
12.18
8.5
69.2,
796,500
12.18
12.0
86.3
1,530,000
12.18
11.4
50.5
12.18
12.18
May
765,000
14:11
10.9
80.1
765,000
14.11
13.3
99.6
1,512,000,
14.11
13.1
63.6
14.11
14.11
June
630,000
8.26
5.3
85.3
810,000
8.26
8.3
107.9
2.340,000
8.26
11.9
75.4
8.26
8.26
July
1,134,000
16.85
19.3
104.6
1,134,000
16.85
23.6
131.5
1,548,000
.16.85
16.0
91.4
16.85
16.85
August
778,500
14.21
11.2
115.8
• 706,500
14.21
12.4 1
143.9-
2,790,000
14.21
24.3
115.7
14.21
14.21
September
873,000
16.43
14.5
130.3
873,000
16.43
17.7
• 161.6
1 1,872 000
16.43
18.9
134.6
16.43
16.43
12 Month Floating PAN Load
(Ibslac/yr):
1303
, ; ,t
.,
161.6
Fes.-
:,:°
134.E
0.0
w'
k _
0.0
Y
4
.'
Annual PAN Load Limit
3504(,
(Ibs/aclyr):
F
,w
360.00u-
x'
350.00
_�
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page g of 7
17
Did the application rates exceed the limits in Attachment B of your permit?
El Compliant ❑ Non -compliant
Were adequate measures taken to prevent effluent ponding in or runoff from the sites?
0 Compliant ❑ Non -Compliant
Was a suitable vegetative cover maintained on all sites as specified in your permit?
0 compliant ❑ Non -compliant
Were all setbacks listed in your permit maintained for every application to each permitted site?
0 Compliant ❑ Non -Compliant
Were all freeboards maintained in accordance with the specified freeboard heights in your permit?
0 Compliant ❑ Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the
action(s) taken. Attach additional sheets if nPcecsary
non-compliance and describe the corrective
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Robert Jackson
Permittee:
Mountaire Farms
Certification No.: 1008145
Signing Official: David White
Grade: IV OIT Phone Number: 910-359-5275
Signing Officials Title: Director Of Processing
Has the ORC changed since the previous NDAR-1? ❑ Yes 0 No
Phone Number: 910-359-5275 Permit Exp.: 2/28/23
L10/3/22
"r.
C�r� �/ (mot/ 10/3/22
Signature Date
Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
I certify, under penally of law, that this document and all attachments were prepared under my direction or supervision in accordance
with a system designed to assure that all qualified personnel properly gathered and evaluated the Information submitted. Based on my
inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Quality
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 'I of 7
Permit No.: WQ0000484
Did irrigation occur
Facility Name: Mountaire Farms
Field Name: X2 Field Name: Y
County: Robeson Month: September
Field Name: Z Field Name:
Year: 2022
at this facility?
Area (acres):
11.55
Area (acres):
3.21
Area (acres):
7.1
Area (acres):
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
Cover Crop.
Coastal/Rye
Cover Crop:
Coastal/Rye
0 YES ❑ No
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Annual Rate (in):
86
Annual Rate (in):
86
Annual Rate (in):
86
Annual Rate (in):
Weather
Freeboard
Field Irrigated?
YES ❑ NO
Field Irrigated?
YES ❑ NO
Field Irrigated?
9
✓ YES
❑ ❑ NO
Field Irrigated?
❑YES ❑ NO
m
1
U
s
C
7
``°
c
0
`w°
°
d
o
fA
N .O
��
>, e
ro Q
Q ro
E°'
c
o a
Q
°'v
Ern
j=.`
'-
�'�'
w m
p o
_1
� c
E °
x o 0
= J
E D
M a
o a
� Q
and
E ro
rn
> ' �
� v E- '-
o ro X o ro
J ro= 0
in - I in
1.12 0.09
Ea°'
Q
Q
m�
E a
~
ac
a
E ro
0
>>�
E o
ro= 0
ma
E 2
Q
0 C
a
E
~ i
m
V
ca
O
ETA
E �'v
ro= O
°F
92
in
ft
8
ft
gal
377,000
min
780
in
1.20
in
0.09
gal
97,500
min
780
gal
min
in
in
gal
min
in
in
2
C
93
8
3
C
92
8
4_
C
92-
$-
-------
�_�.--
- -----
---------
--�
--
^_-
5
R
89
0.2
7
6
C
92
7
7
R
92
7
8
C
82
7
319,000
660
1.02
0.09
82,500
660
0.95
0.09
9
C
83
6
10
R
81
1.6
6
11
R
87
0.2
6
12
C
90
7
13
C
86
7
14
C
84
7
15
C
85
7
290,000
600
0.92
0.09
75,000
600
0.86
0.09
16
C
84
7
17
C
85
8
18
C
86
8
19
C
89
8
20
C
93
8
21
C
93
8
377,000
780
1.20
0.09
97,500
780
1.12
0.09
22
C
96
8
23
C
77
8
24
C
86
9
25
C
86
9
26
C
87
9
27
C
9
28
C29
C
F75
9
275,500
570
0.88
0.09
71,250
570
0.82
0.09
30
R
3.5
7
31
Monthly
Loading:
1,638,500
5.22
423,750
4.86
0
0.00
0
0.00
12 Month Floating Total (in):
Now
59.52
50.12 10.00
0.00
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 6 of13
Permit No.: WQ0000484
®id irrigation occur
Facility Name: Mountaire Farms
Field Name: U Field Name: V
County: Robeson Month: September
Field Name: W Field Name:
Year: 2022
X1
atthis ciCl�l$�J!
Area (acres):
3.65
Area (acres):
14.7
Area (acres):
11.08
Area (acres):
25.83
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
0 YES ❑ NO
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Annual Rate (in):
86
Annual Rate (in):
86
Annual Rate (in):
86
Annual Rate (in):
86
Weather
Freeboard
Field Irrigated?
YES ❑ No
Field Irrigated?
YES ❑ NO
Field Irrigated?
EFYIYES ❑ NO
Field Irrigated?
YES ❑ No
a)
ili
0.
E
r
O
y
ai
rn
ai a)
Q.m
a
E .-
-6 cL-
f❑
m
a
>>,
E -
Q
mm
~
>,
°
Eo
°
Ea)
E
-
>E
E
0
E
c
E ccv
u~ o m
1
C
°F
92
in
ft
8
ft
gal
min
in
in
gal
min
in
in
gal
min
in
in
gal
858,000
min
780
in
1.22
in
0.09
2
C
93
8
3
C
92
8
63,000
840
0.64
0.05
476,000
840
1.19
0.09
420,000
840
1.40
0.10
4
_ C
92
5
R
89
0.2
7
6
C
92
7
306,000
540
0.77
0.09
270,000
540
0.90
0.10
7
R
92
7
54,000
720
0.54
0.05
--
8
C
82
7
726,000
660
1.04
0.09
9
C
83
6
10
R
81
1.6
6
63,000
840
0.64
0.05
11
R
87
0.2
6
12
C
90
7
272,000
480
0.68
0.09
240,000
480
0.80
0.10
13
C
86
7
14
C
84
7
1
40,500
540
0.41
1 0.05
15
C
85
7
660,000
600
0.94
0.09
16
C
84
7
17
C
85
8
18
C
86
8
19
C
89
8
20
C
93
8
54,000
720
0.54
0.05
408,000
720
1.02
0.09
360,000
720
1.20
0.10
21
22
C
C
93
96
8
8
858,000
780
1.22
0.09
23
C
77
8
340,000
600
0.85
0.09
300,000
600
1.00
0.10
24
C
86 1
1
9
45,000
600
0.45
0.05
25
C
86
9
26
C
87
9
27
C
82
9
28
C
75
9
340,000
600
0.85
0.09
300,000
600
1.00
0.10
29
C
67
9
627,000
570
0.89
0.09
30
R
66
31
Monthly
Loading:
319,500
3.22
2,142,000
5.37 1
1,890,000
6.28
3,729,000
5.32
12 Month Floating Total (in):,,
35.58
59.80
59.58
59.95
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 5 of 7
Permit No.: WQ0000484
Facility Name: Mountaire Farms
County: Robeson Month: September
Year: 2022
®id irrigation occur
Field Name: Q Field Name: R
Field Name: 5 Field Name:
T
at this facility?
Area (acres):
23.8
Area (acres):
19.16
Area (acres):
12.74
Area (acres):
6.25
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
(] YES ❑ No
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Annual Rate (in):
86
Annual Rate (in):
86
Annual Rate (in):
86
Annual Rate (in):
86
Weather
Freeboard
Field Irrigated?
❑� YES ❑ NO
Field Irrigated?
Q YES ❑ No
Field irrigated?
YES ❑ No
Field Irrigated
YES ❑ NO
ar
m
o
m
OS
U
m
L
o
m
f0
o. caa
U
°1
E ._
d
..,
>,
>>
T..
a) a
E °7
w .0
a)
T .0
E a m
7 C
a s
E °1
a
d w
tM
T C
E a�
7 , L
t
m a
E. N
a
m
a�
E
❑
w
a
E
ii
o
a
N
a s
E ca
1--
ca
❑
E a a
=
? o
E ca
~ .�
'm a
❑ coo
E a a
i 0O
a-
O C
E m
h •r
r 'a
Cl p
._
E
W 2 0
0 0C.
E
�_ ._
a' m
z
.>C O N
Of
fA
Cl
> Q
=
J
J
> B
M
�
CO �
I—
a.
Ln µ-
�
°F
in
ft
ft
gal
min
in
in
gal
min
in
in
gal
min
in
in
gal
min
in
in
1
C
92
8
2
C
93
1 8
330,000
660
0.51
0.05
264,000
660
0.51
0.05
3
C
92
8
434,000
840
1.25
0.09
126,000
840
0.74
0.05
`0.46
_
4
---
- -- -
- --
-
-- - --
5
R
89
0.2
7
300,000
600
0.05
240,000
600
0.46
0.05
6
C
92
7
279,000
540
0.81
1 0.09
7
R
92
7
8
C
82
7
108,000
720
0.64
0.05
9
C
83
6
10
R
81
1.6
6
420,000
840
0.65
0.05
336,000
840
0.65
0.05
126,000
840
0.74
0.05
11
R
87
0.2
6
12
C
90
7
13
C
86
7
300,000
600
0.46
0.05
240,000
600
0.46
0.05
310,000
600
0.90
0.09
14
C
84
7
15
C
85
7
81,000
540
0.48
0.05
16
C
84
7
240,000
480
0.37
0.05
192,000
480
0.37
1 0.05
17
C
85
8
330,000
660
0.51
0.05
99,000
660
0.58
0.05
18
C
86
8
19
C
89
8
390,000
780 1
0.60
0.05
312,000
780
0.60
0.05
403,000
780
1.17
0.09
20
C
93
8
21
C
93
8
108,000
720
0.64
0.05
22
C
96
8
420,000
840
0.65
0.05
336,000
840
0.65
0.05
434,000
840
1.25
0.09
23
C
77
8
24
C
86
9
25
C
86
9
90,000
600
0.53
0.05
26
C
9
27
C
9
390,000
780
0.60
0.05
312,000
780
0.60
0.05
28
C
V66
9
310,000
600
0.90
0.09
90,000
600
0.53
0.05
29
C
9
30
R
3.5
7
31
Monthly
Loading:
3,120,000
4.83
2,232,000
4.29
2,17Q0Do
6.27
828,000
4.88
12 Month Floating Total (in):
63.96
59.42
54.26
j
49,88.
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Pageof O
Permit No.: W00000484
Facility Name: Mountaire Farms
County: Robeson Month: September
Year: 2022
®id irrigation occur
Field Name: M Field Name: N
Field Name: O Field Name:
P
at this faCl Ilt�/?
Area (acres):
23.07
Area (acres):
78.87
Area (acres):
19.9
Area (acres):
28.64
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
❑� YES ❑ NO
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Annual Rate (in):
52
Annual Rate (in):
86
Annual Rate (in):
86
Annual Rate (in):
86
Weather
Freeboard
Field Irrigated?
❑✓ YES ❑ No
Field Irrigated?
❑� YES ❑ No
Field Irrigated?
❑✓ YES ❑ NO
Field Irrigated?
❑� YES ❑ NO
m
0
m
U
r
``°
m
v
N
?
v o
E °'
a
°' ^:
m
>+ c
o
E rn
c
E v
°1 m
m
a c
> >+ c
m
E,
> c
E T rn
E
y a
E °'
v
m 0
E
E o�
�+ c
❑
L
m
m
0.
Q
S
o
> o
R a
Q
o a
E rn
i- c
a m
❑ o
o I
m 2 0
n
0 0
E m
i= .L
• o
ca R
❑ 0
E z-0
x o 0
o.
0 u
E@
E
rn
'v
❑ 0
E v
E
X 0 m
a
E m
s
>,
o
f0 m
E
E o 0
o m
In
10
Q
J
J
�! Q
L
J=
J
� Q
J=
J
Q
~
❑ J=
J
F-
d
`p
w
OF
inI
ft
ft
gal
min
n
in
gal
min
in
in
gal
min
in
in
gal
min
in
in
1
C
92
8
385,000
420
0.61
0.09
2
C
93
8
264,000
660
0.49
0.04
396,000
660
0.51
0.05
3
C
92
8
924,000
840
0.43
0.03
4
C_
9_2
--
$-
^
`
-
---
-
5
R
89
0.2
7
240,000
600
0.44
0.04
360,000
1 600
0.46
0.05
6
C
92
7
7
R
92
7
792,000
720
0.37
0.03
8
C
82
7
9
C
83
6
440,000
480
0.70
0.09
10
R
81
1.6
6
924,000
840
0.43
0.03
336,000
840
0.62
0.04
504,000
840
0.65
0.05
11
R
87
0.2
6
12
C
90
7
13
C
86
7
288,000
480
0.37
0.05
240,000
600
0.44
0.04
14
C1
84
7
594,000
540
0.28
0.03
151
C 1
85
7
16
C
84
7
594,000
540
0.28
0.03
216,000
540
0.40
0.04
288,000
480
0.37
0.05
17
C
85
8
605,000
660 1
0.97
0.09
726,000
660
0.34
0.03
396,000
660
0.51
0.05
18
C
86
8
19
C
89
8
605,000
660
0.97
0.09
312,000
780
0.58
0.04
20
C
93
8
792,000
720
0.37
0.03
360,000
600
0.46
0.05
21
C
93
8
22
C
96
8
336,000
840
0.62
0.04
23
C
77
8
660,000
600
0.31
0.03
360,000
600
0.46
0.05
24
C
86
9
660,000
600
0.31
0.03
25
C
86
9
26
C
87
9
27
C 1
82
9
312,000
780
0.58
0.04
468,000
780
0.60
0.05
28
C
75
9
29
C
67
9
550,000
600
0.88
0.09
30
R
66
3.5
7
31
Monthly
Loading:
2,585,000
4.13
39.64
6,666,000
3.11
50.31
2,256,000
4.18
56.63
3,420,000
4.40
54.60
12 Month Floating Total (in):
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 3 of
Permit No.: WQ0000484
Facility Name: Mountaire Farms
county: Robeson
Month: September
Year: 2022
®id irrigation occurField
Name:
I
Field Name:
J
Field Name:
K
Field Name:
L
at this facility?
Area (acres):
13.58
Area (acres):
58.22
Area (acres):
9.86
Area (acres):
24.94
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
0 YES ❑ NO
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Annual Rate (in):
91
Annual Rate (in):
91
Annual Rate (in):
91
Annual Rate (in):
91
Weather
Freeboard
Field Irrigated?
EYES ❑ NO
Field Irrigated?
YES ❑ NO
Field Irrigated?
9
YES
❑ ❑ NO
Field Irrigated?
YES ❑ NO
d
o
y m
m
�j
@
m
m
3Jm
-
rn
E mcc
E
E
m
EE
a rn_co
❑
E
o
m CL
o
F
o
x
7a
❑
Em
o
E
m
'v
E
Q
_
1
Q
_
J
=J
Q
❑m
O=
J
Oi
J
0.
OF
in
ft
Tft
gal
min
in
in
gal
min
in
in
gal
min
in
in
gal
min
in
in
1
C
92
8
343,000
420
0.22
0.03
2
C
93
8
275,000
660
0.75
0.07
3
C
92
8
686,000
840
0.43
0.03
238,000
840
0.89
0,06
364,000
840
0.54
0.04
4
C_
92
- -
8-
- -
-- ---
----
�_:-
5
R
89
0.2
7
490,000
600
0.31
0.03
170,000
600
0.63
0.06
260,000
600
0.38
0.04
6
C
92
7
7
R
92
7
8
C
82
7
539,000
660
0.34
0.03
187,000
660
0.70
0.06
286,000
660
0.42
0.04
9
C
83
6
200,000
480
0.54
0.07
10
R
81
1.6
6
350,000
840
0.95
0.07
686,000
840
0.43
0.03
238,000
840
0.89 1
0.06
364,000
840
0.54
0.04
11
R
87
0.2
6
12
C
90
7
13
C
86
7
250,000
600
0.68
0.07
14
C
84
7
1
588,000
720
0.37
0.03
204,000
720
0.76
0.06
312,000
720
0.46
0.04
15
C
85
7
16
C
84
7
275,000
660
0.75
0.07
17
C
85
8
539,000
660
0.34
0.03
286,000
660
0.42
0.04
18
C
86
8
19
C
89
8
539,000
660
0.34
0.03
286,000
660
0.42
0.04
20
C
93
8
300,000
720
0.81
0.07
21
C
93
8
392,000
480
0.25
0.03
136,000
480
0.51
0.06
22
C
96
8
588,000
720
0.37
0.03
312,000
720
0.46
0.04
23
C
77
8
170,000
600
0.63
0.06
260,000
600
0.38
0.04
24
C
86
9
490,000
600
0.31
0.03
25
C
86
9
26
C
87
9
27
C
82
9
637,000
780
0.40
0.03
221,000
780
0.83
0.06
338,000
780
0.50
0.04
28
C
75
9
275,000
660
0.75
0.07
29
C
67
9
250.000
600
0.68
0.07
30
R
66
3.5
7
31
Monthly
Loading:
2,175,000
5W"i.90
6,517,000
4.12
1,564,000
5.84
3,068,000
4.53
12 Month Floating Total (in):
61.46
56.15
62.06
49.71
1. FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page ;I_ of 1E
Permit No.: WQ0000484
Facility Name: Mountaire Farms
County: Robeson
month: September
Year: 2022
®id irrigation occur
Field Name:
E
Field Name:
F
Field Name:
G
Field Name:
H
at this facility?Cover
Area (acres):
4.7
Area (acres):
26.53
Area (acres):
47.489
Area (acres):
14.19
Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
YES ❑ NO
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Annual Rate (in):
78
Annual Rate (in):
78
Annual Rate (in):
91
Annual Rate (in):
91
Weather
Freeboard
Field Irrigated?
❑ YES NO
Field Irrigated?
EZ YES ❑ NO
Field Irrigated?
g
❑r YES ❑ P,lo
?
Field Irrigated.
ES
❑ Y ❑ No
a
❑
1
a)
°
()
w
d
C
sJ
m
a)
a.
E
F-
C
0
m
n.
rn
N
o`
v)
N N
a m
U
a s
m
to `�
°' m
._
6
> Q
a) m
F rn
~_
n
E
F
O ro
❑°
J
a c
E o m
m S o
J
ar
E ._
Q.
0 o
i Q
m
of ,,,,
E
i.
i
rn
>. C
m@
❑ o=
J
E T
7 _C
°
o
J
m a
E m
c
o a
� Q
a
W
E `°
�- °�
rn
C
m°
❑ i;
J
E rn
7 ?�
E v
x° o
= J
a> 'a
o c
> Q
a
E
.�
�-
rn
a v
p f0
J
E m
�.
E 3 -a
X o as
�= J
OF
92
in
I ft
8
ft
g al
in
in
gal
min
in
in
gal
min
in
in
gal
min
in
in
2
C
93
8
3
C
92
8
644,000
840
0.89
0.06
840,000
840
0.65
0.05
168,000
840
0.44
0.03
4
C
92
-
8-
5
R
89
0.2
7
220,000
600
0.31
0.03
6
C
92
7
7
R
92
7
720,000
720
0.56
0,05
144,000
720
0.37
0.03
8
C
7
9
C
6
644,000
840
0.89
0.06
480,000
480
0.37
0.05
10
R
L90
1.
6
168,000
840
0.44
0.03
11
R
0.2
6
12
C
7
13
C
86
7
460,000
600
0.64
0.06
14
C
84
7
15
C
85
7
16
C
84
7
506,000
660
0.70
0.06
17
C
85
8
660,000
660
0.51
0.05
18
C
86
8
19
C
89
8
132,000
660
0.34
0.03
20
C
93
8
552,000
720
0.77
0.06
21
C
93
8
552,000
720
0.77
0.06
480,000
480
0.37
0.05
22
C
96
8
144,000
720
0.37
0.03
23
C
77
8
600,000
600
0.47
0.05
24
C
86
9
600,000
600
0.47
0.05
120,000
600
0.31
0.03
25
C
86
9
26
C
87
9
27
C
82
9
598,000
780
0.83
0.06
28
C
75
9
29
C
67
9
460,000
600
0.64
0.06
600,000
600
0.47
0.05
120,000
600
0.31
0.03
30
R
66
3.5
7
31
Monthly
Loading
0
0.00
4,416,000
6.13
66.96
4,980 0000
3.86
1,116,000
2.90
12 Month Floating Total (in)
0.00
67.50
32.93
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page I of C
Permit No.: WQ0000484
®id irrigation occur
Facility Name: Mountaire Farms
Field Name: A Field Name: B
County: Robeson month: September
Field Name: C Field Name:
Year: 2022
D
at this facility?
Area (acres):
8.2
Area (acres):
6.75
Area (acres):
13.6
Area (acres):
3.5
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
Cover Crop:
Coastal/Rye
[Z YES ❑ NO
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Annual Rate (in):
78
Annual Rate (in):
78
Annual Rate (in):
78
Annual Rate (in):
78
VVeather
Freeboard
Field Irrigated?
F] YES ❑ No
Field Irrigated?
D YES ❑ NO
Field Irrigated?
El YES ❑ No
Field Irrigated?
❑YES EINO
p
U
tdv
w
C
m
o
y
c
u
D.
rnQ
o
N
v
>L
a
E
E Z.
>
)
rn
S
o
E
E e
X o
=0
da
2
QE
o
a
mE
a cE
E°c
x o
J
m
� Q
ID❑o
c
=MEQ
X
m
�Q
y d
E
~
c
J
is
JH
1
C
°F
92
in
ft
8
ft
gal
min
in
in
gal
min
in
in
gal
min
in
in
gal
min
in
in
2
C
93
8
99,000
660
0.44
0.04
99,000
660
0.54
0.05
3
C
92
8
126,000
840
0.57
0:04
126,000
840
0.69
0.05
4
C. _
_ 92 _
-- 8---
-
-
- --
-- -- ---
----- - -
5
R
89
0.2
7
6
C
92
7
7
R
92
7
108,000
720
0.49
0.04
108,000
720
0.59
0.05
4 32,000
720
1.17
0.10
8
C
82
7
9
C
83
6
288,000
480
0.78
0.10
10
R
81
1.6
6
126,000
840
0.57
0.04
126,000
840
0.69
0.05
11
R
87
0.2
6
12
C
90
7
90,000
600
1 0.40
0.04
90,000
600
0.49
0.05
360,000
600
0.97
0.10
13
C
86
7
14
C
84
7
15
C
85
7
16
C
84
7
17
C
85
8
18
C
86
8
19
C
89
8
99,000
660
0.44
0.04
99,000
660
0.54
0.05
396,000
660
1.07
0.10
20
C
93
8
21
C
93
8
108,000
720
0.49
0.04
108,000
720
0.59
0.05
22
C
96
8
23
C
77
8
24
C
86
9
25
C
86
9
26
C
87
9
27
C
82
9
117,000
780
0.53
0.04
117,000
780
0.64
0.05
28
C
75
9
396,000
660
1.07
0.10
29
C
67
g
30
R
66
3.5
7
31
Monthly Loading:
873,000
3.92
r
873.000
4.76
1,872,000
5.07
0
0.00
12 Month Floating Total (in):
39.76
_
49.82
44.16
;>_
_
0.00
FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of
Sampling Person(s)
Certified Laboratories
Name: Robert Jackson Name: Cameron Testing
Name: Joshua Simmons Name: TBL
Does all monitoringdata and sampling frequencies meet the requirements in Attachment A. of your permit? I] compliant ❑ Non -compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessarv.
Operator in Responsible Charge (ORC) Certification Permittee Certification
ORC: Robert Jackson Permittee: Mountaire Farms
Certification No.: 1008145 Signing Official: David White
Grade: IV OIT Phone Number: 910-359-5275 Signing Officials Title: Director of Processing
Has the ORC changed since the previous NDMR? ❑ Yes 21 No Phone Number: 910-359-5275 Permit Expiration: 2/28/2023
Signature
By this signature, I certify that this report Is accurrate and complete to the best of my knowledge.
10/3/2022 G� L 10/3/2022
Date Signature Date
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information
submitted. Based on my Inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the Information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for
knowing violations.
Mail Original and Two Copies to:
Division of Water Quality
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
I. FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page I of _2.,_
Permit No.: WQ0000484 Facility Name: Mountaire Farms county: Robeson Month: September Year: 2022
PPI: 005 Flow Measuring Point: ❑Influent R1 Effluent ❑ No flow generated Parameter Monitoring Point: ❑ Influent ❑ Effluent ❑� Groundwater Lowering ❑ Surface Water
Parameter Code —0
50050
00400
00927
00310
00610
00530
31616
00625
00620
01051
01027
00665
00929
00916
01067
01092
>,
j
¢E
U ~,
O
c
°�
U
0
c
L
x
a
!_
a
m
o
m
o
E
Q
N
�?ca
~ fN- cn
iM
E
mo
IU�Lit
U
N
o,rn
Y O
Z
�-
°'
,D
)
E
(j
N
2
m0
O N
►— °0
n-
7
;�
=
U
U
O
Z
E
N
1
24-hr
0600
hrs
10
GPD
70,880
su
mg/L
mg/L
mg/L
100 mL
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mglL
mg/L
mg/L
2
0600
10
43,640
3
0800
4
0
4
0
5
0600
10
0
6
0600
10
179,028
7
0600
10
28,876
8
0600
10
53,838
9
0600
10
34,893
---
10
0800-
- 4-
-6;094—
-
-
- -
--- -
- ---
- -
- ---
- -
--
11
139,141
12
0600
10
33,762
13
0600
10
0
14
0600
10
0
15
0600
10
44,837
16
0600
10
14,280
17
0800
4
0
18
24,668
19
0600
10
0
20
0600
10
17,892
21
0600
10
7,625
22
0600
10
6,125
23
0600
10
0
24
0800
4
0
25
15,074
26
0600
10
4,402
27
0600
10
3,045
28
0600
10
5,965
29
0600
10
1,463
30
1311
0600
10
0
Average:
24,518
Daily Maximum:
179,028
Daily Minimum:
0
Sampling Type:
Monthly Limit:
Recorder
Grab
Grab
Grab
Grab
Grab
Grab
Grab-1
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Daily Limit:
21550,000
Sample Frequency:
Continuous
5xWeekly
Monthly
2xMonthly
2xMonth1y
2xMonthly
2xMonthly
2xMonthly
2xMonthly I
Monthly
Monthly
2xMonthly
Monthly
Monthly
Monthly
Monthly
FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT'(NDMR) Page I'l of 2
Sampling Person(s)
Certified Laboratories
Name: Robert Jackson Name: Cameron Testing
Name: Joshua Simmons Name: TBL
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? [21 Compliant ❑ Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary.
Operator in Responsible Charge (ORC) Certification Permittee Certification
ORC: Robert Jackson Permittee: Mountaire Farms
Certification No.: 1008145 Signing Official: David White
Grade: IV OJT Phone Number: 910-359-5275 Signing Officials Title: Director of Processing
Has the ORC changed since the previous NDMR? ❑ Yes R1 No Phone Number: 910-359-5275/ Permit Expiration: 2/28/2023
10/3/2022 " 1 10/3/2022
Signature Date Signature Date
By this signature. I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my dfreclion or supervision In
accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for
knowing violations.
Mail Original and Two Copies to:
Division of Water Quality
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page 1 of) -
Permit No.: WQ0000484
Facility Name: Mountaire Farms
County: Robeson
Month: September
Year: 2022
PPI: 004
Flow Measuring Point: Q Influent Q Effluent ❑ No flow generated
Parameter Monitoring Point: ❑ Influent ❑ Effluent ❑ Groundwater Lowering Q Surface Water
Parameter Code — 0
50050
00400
00927
00310
00610
00530
31616
00625
00620
01051
01027
00665
00929
00916
01067
01092
n,
¢ E
a
O
m
2,
i= n
o
a
E
10
0..
a'LO
Q
E
-
•o-
a
rn
o
i°—
m
m
E
Eaa,
w,
C
o.
>
.>
u
c2 u
1
24-hr
0600
hrs
10
GPD
2,940,000
su
7.2
mg/L
mg/L
mg/L
mg/L
#/100 mL
mg/L
34.3
mg/L
mg/L
mg/L
ing/L
mg/L
mg/L
mg/L
mg/L
2
0600
10
3,040,000
7.1
3
0800
4
220,000
H
4
330,000
5
6
0600
0600
10
10
280,000
2,770,000
7.2
7
0600
10
2,880,000
7.2
8
0600
10
3,000,000
7.3
9
0600
10
3,030,000
7.1
_
10
0800
4
-67000
11
350,000
12
0600
10
2,740,000
6.9
13
0600
10
3,020,000
7.2
14
15
0600
0600
10
10
2,940,000
2,920,000
7.1
7
16
17
0600
0800
10
4
3,000,000
390,000
7.3
18
1 930,000
19
20
0600
0600
10
10
2,800,000
2,940,000
7.2
7.3
21
0600
10
3,110,000
7.2
22
0600
10
3,060,000
6.6
23
24
0600
0800
10
4
2,970,000
380,000
7.1
25
400,000
26
0600
10
2,900,000
7.1
27
0600
10
2,940,000
7
28
0600
10
2,860,000
7.2
29
0600
10
2,990,000
7.2
301
0600
10
2,940,000
7.2
31
Average:
2,191,333
34.30
Daily Maximum:
3,110,000
7.30
1
34.30
Daily Minimum:
220,000
6.60
34.30
Sampling Type:
Recorder
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Monthly Limit:
Daily Limit:
2,550,000
Sample Frequency: 1
Continuous 1
5xWeekly
Monthly
2xMonthly
2xMonthly
2xMonthly
2xMonthly
2xMonthly
2xMonthly
Monthly
Monthly
2xMonthly
Monthly
Monthly
Monthly
Monthly
FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page ;�, of .2
Sampling Person(s)
Certified Laboratories
Name: Robert Jackson Name: Cameron Testing
Name: Joshua Simmons Name: TBL
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? i] Compliant ❑ Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary
Operator in Responsible Charge (ORC) Certification Permittee Certification
ORC: Robert Jackson Permittee: Mountaire Farms
Certification No.: 1008145 Signing Official: David White
Grade: IV OIT Phone Number: 910-359-5275 Signing Officials Title: Director of Processing
Has the ORC changed since the previous NDMR? ❑ Yes 2 No Phone Number: 910-359-5275 Permit Expiration: 2/28/2023
10/3/2022 � Cv 10/3/2022
v
Signature Date Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for
knowing violations.
Mail Original and Two Copies to:
Division of Water Quality
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
It FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page A of2—
Permit No.: WQ0000484 Facility Name: Mountaire Farms County: Robeson Month: September Year: 2022
PPI: 003 Flow Measuring Point: 21 Influent E Effluent ❑ No Flow generated Parameter MonitoringPoint: ❑ influent ❑Effluent ❑Groundwater Lowering El surface Water
Parameter Code — 0.
50050
00400
00927
00310
00610
00530
31616
00625
00620
01051
01027
00665
00929
00916
01067
01092
>.
Q E
c
O
m,
E
i-
3
0
E
LO
O
m
m
c
0
a
a
v to
e ;
0
E
LL 0
s
a d
Z
o
I-
z0p
CU
E
E
U�o
2
G
n.
UE
dz
c
NL0
1
24-hr
0600
hrs
10
GPD
27,400
su
7.2
mg/L
mg/L
mg1L
mg/L
#1100 mL
mg/L
34.3
mg1L
mg/L
mg1L
mg/L
mg/L
mg/L
mg/L
mg/L
2
0600
10
26,900
7.1
3
0800
4
8,800
H
4
11,900
5
0600
10
13,600
6
0600
10
26,800
7.2
7
0600
10
27,300
7.2
8
0600
10
21,800
7.3
9
0600
10
27,300
�
7.1
10
0800
4
0
11
0
12
13
0600
0600
10
10
30,700
26,700
6.9
7.2
14
0600
10
27,400
7.1
15
0600
10
26,900
7
16
17
0600
0800
10
4
26,200
8,700
7.3
18
4,000
19
20
0600
0600
10
10
27,200
26,600
7.2
7.3
21
0600
10
24,700
7.2
_
22
0600
10
24,200
6.6
23
0600
10
24,900
7.1
24
0800
4
6,700
25
26,200
26
0600
10
25,400
7.1
27
0600
10
24,600
7
28
0600
10
26,700
7.2
29
0600
10
23,000
7.2
30
0600
10
28,400
7.2
31
Average:
21,033
34.30
Daily Maximum:
30,700
7.30
34.30
Daily Minimum:
0
6.60
34.30
Sampling Type:
Monthly Limit:
Recorder
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab.
Grab
Daily Limit:
2,550,000
Sample Frequency:1
Continuous
5xWeekly
Monthly
2xMonthly
2xMonthly
2xMonthly
2xMonthly
2xMonthly
2xMonthly
Monthly
Monthly
2xMonthly
Monthly
Monthly
Monthly
Monthly
FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page �), of, -a
Sampling Person(s)
Certified Laboratories
Name: Robert Jackson Name: Cameron Testing
Name: Joshua Simmons Name: TBL
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? 21 Compliant ❑ Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary.
Operator in Responsible Charge (ORC) Certification
ORC: Robert Jackson
Certification No.: 1008145
Grade: IV OIT Phone Number: 910-359-5275
Has the ORC changed since the previous NDMR? ❑ yes El No
USignature
By this signature, I certify that this report is accurrale and complete to the best of my knowledge.
Permittee Certification
Permittee: Mountaire Farms
Signing Official: David White
Signing Official's Title: Director of Processing
Phone Number: 910-359-5275 Permit Expiration: 2/28/2023
10/3/2022 (i�/�
10/3/2022
Date Signature Date
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for
knowing violations,
Mail Original and Two Copies to:
Division of Water Quality
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page ' of
m
Permit No.: WQ0000484 Facility Name: Mountaire Farn1S County: Robeson Month: September Year: 2022
PPI: 002 Flow Measuring Point: (] influent ❑� Effluent ❑ No flow generated Parameter Monitoring Point: ❑ Influent Q Effluent ❑ Groundwater Lowering ❑ Surface Water
Parameter Code — m
50050
00400
00927
00310
00610
00530
31616
00625
00620
0 0051
01027
00665
00929
00916
01067
01092
o
E
.`
U¢~
c
O
m
E
E-
a
E
a
m
E
Q
a
mm �
°°°
F-
NO
oE
V
.c
Z
o
t
=
v
N
'
=
a.
3
0
r
.
2
U
am
Gcti
ZO
IVoc
1
24-hr
0600
hrs
10
GPD
2,940,000
su
7.2
mg/L
mg/L
mg/L
mg/L
#1100 mL
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg1L
mg/L
2
0600
10
3,040,000
7.1
3
0800
4
220,000
H
4
330,000
5
_30
10
280,000
6
0600
10
2,770,000
7.2
7
0600
10
2,880,000
7.2
8
0600
10
3,000,000
7.3
9
0600
10
3,030,000
7.1
101
0800
4
670,000
11
350,000
12
0600
10
2,740,000
6.9
13
0600
10
3,020,000
7.2
14
0600
10
2,940,000
7.1
15
0600
10
2,920,000
7
16
0600
10
3,000,000
7.3
17
0800
4
390,000
18
930,000
19
0600
10
2,800,000
7.2
20
0600
10
2,940,000
7.3
21
0600 1
10
3,110,000
7.2
22
0600
10
3,060,000
6.6
23
0600
10
2,970,000
7.1
24
0800
4
380,000
25
400,000
26
0600
10
2,900,000
7.1
27
0600
10
2,940,000
7
28
0600
10
2,860,000
7.2
29
0600
10
2,990,000
7.2
30
0600
10
2,940,000
7.2
31
Average:
2.191,333
Daily Maximum:
3,110,000
7.30
Daily Minimum:
220,000
6.60
Sampling Type:
Recorder
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Monthly Limit:
Daily Limit:
2,550,000
Sample Frequency:
Continuous
5xWeekly
Monthly
2xMonthly
2xMonthly
2xMonthly
2xMonthly
2xMonthly
2xMonthly
Monthly
Monthly
2xMonthly
Monthly
Monthly
Monthly
Monthly
FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page _� of 3
Sampling Person(s)
Certified Laboratories
Name: Robert Jackson Name: Cameron Testing
Name: Joshua Simmons Name: TBL
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? 2 Compliant ❑ Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessarv.
Operator in Responsible Charge (ORC) Certification
ORC: Robert Jackson
Certification No.: 1008145
Grade: 1V OIT Phone Number: 910-359-5275
Has the ORC changed since the previous NDMR? ❑ Yes E No
1-/ Signature Date
By this signature, I certify that this report is accurrale and complete to the best of my knowledge.
Permittee Certification
Permittee: Mountaire Farms
Signing Official: David White
Signing Official's Title: Director of Processing
Phone Number: 10-359-5275 Permit Expiration: 2/28/2023
10/3/2022
Signature Date
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the Information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for
knowing violations.
Mail Original and Two Copies to:
Division of Water Quality
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
FORM: NDMR 03-12
NON -DISCHARGE MONITORING REPORT (NDMR)
Page 9, of 3
M
Permit No,: WQ0000484
Facility Name: Mountaire Farms
County: Robeson j
Month: September
Year: 2022
PPI: 001
Flow Measuring Point: El influent ❑ Effluent ❑ No flow generated
Parameter Monitoring Point: ❑ influent Effluent ❑ Groundwater Lowering ❑ surface Water
Parameter Code -►
50050
01042
00931
WQ09
70300
50060
1 00940
00600
U
c
O
y
=
E o
O
c
A �
d
y O
m
`
p"
y
e
o 2
24-hr
hrs
GPD
mg/L
Ratio
mg/L
mg/L
mg/L
mg/L
mg/L
1
0600
10
2,940,000
0.466
9.8
17.48
0.52
35.7
2
0600
10
3,040,000
0.38
3
0800
4
220,000
0
4
330,000
0
5
0600
10
280,000
0
6
0600
10
2,770,000
0.39
7
0600
10
2,880,000
0.32
8
0600
10
1 3,000,000
0.4
9
0600
10
1 3,030,000
0.28
10
00-
4 -
---670;000-
-
11
350,000
0
12
0600
10
2,740,000
0.33
13
0600
10
3,020,000
0.12
14
0600
10
2,940.000
0.26
15
0600
10
2,920,000
15.39
0.32
30.6
16
0600
10
3,000,000
0.29
171
0800
4
390,000
0
18
930,000
0
19
0600
10
2,800,000
0.88
20
0600
10
2,940,000
0.25
21
0600
10
3,110,000
0.28
22
0600
10
3,060,000
0.37
23
0600
10
2,970,000
0.22
24
0800
4
380,000
0
25
400,000
0
26
0600
10
2,900,000
0.32
27
0600
10
2,940,000
1
0
28
0600
10
2,860,000
0.34
29
0600
10
2,990,000
0.14
30
0600
10
2,940,000
0
31
Average:
#REF!
#REF!
9.80
16.44
0.20
33.15
Daily Maximum:
#REFI
#REF!
9.80
17.48
0.52
35.70
Daily Minimum:
#REFI
#REF!
9.80
15.39
0.00
30.60
Sampling Type:
Recorder
Grab
Calculated
Calculated
Grab
Grab
Grab
Grab
Monthly Limit:
Daily Limit:
2,550,000
Sample Frequency:
Continuous
Monthly
Monthly
2xMonthly
3xYear!y
5xWeek
3xYear
2x Month
FORM: NDMR 03-12
ci
NON -DISCHARGE MONITORING"REPORT (NDMR)
Page J_ of 3
Permit No.: WQ0000484
Facility Name: Mountaire Farms
County: Robeson
Month: September
Year: 2022
PPI: 001
Flow Measuring Point: 0 Influent ❑� Effluent ❑ No flow generated
Parameter Monitoring Point: ❑ Influent 0 Effluent ❑ Groundwater Lowering ❑ Surface Water
Parameter Code -►
50050
00400
00927
00310
00610
00530
31616
00625
00620
01051
01027
00665
00929
00916
01067
01092
`
c
O
N
a
E
@
o
a
a
=
T
�
to
>¢E
>,
°
°
m
YFo
Yo
>
_
m
U
U
m
E
CL io
ap
o
Z_
Nc
q
U
Z
°
U
U
)O
U
n
24-hr
hrs
GPD
su
mg/L
mg/L
mg/L
mg/L
1 #1100 mL
mg/L
mg/L
1 mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
1
0600
10
2,940,000
7.2
2.45
8.29
34.3
12.3
750
35.7
0.05
0.0001
0.00208
560
90.1
2.36
0.479
0.583
2
0600
10
3,040,000
7.1
3
0800
4
220,000
H
4
330,000
5
0600
10
280,000
6
0600
10
2,770,000
7.2
- -
7
0600
10
2,880,000
7.2
8
0600
10
3,000,000
7.3
9
0600
10
3,030,000
7.1
_
10
0800
4
670,000
11
350,000
12
0600
10
2,740,000
6.9
13
0600
10
3,020,000
7.2
14
0600
10
2,940,000
7.1
15
0600
10
2,920,000
7
8.52
30.5
12.7
2450
30.8
0.076
0.482
16
0600
10
3,000,000
7.3
17
0800
4
390,000
18
930,000
19
0600
10
2,800,00D
7.2
20
0600
10
2,940,000
7.3
21
0600
10
3,110,000
7.2
22
0600
10
3,060,000
6.6
23
0600
10
2,970,000
7.1
Off
' j
24
0800
4
380,000
25
400,000
26
0600
10
2,900,000
7.1
_
•, , ;,., _;: k7
27
0600
10
2,940,000
7
_
28
0600
10
2,860,000
7.2
a
29
0600
10
2,990,000
7.2
- -
--
�-
30
31
0600
10
2,940,000
7.2
nrT 1 61
`)n
v v u U a
16022
Average:
2,191.333
2.45
8.41
32.4-0
12.50
1,355.54
33.25
0.06
0.00
0.00
280.24
90.10
0.48
0.58
Daily Maximum:
3,110,000
7.30
2.45
8.52
34.30
12.70
2,450.00
35.70
0.08
0.00
0.00
560.00
� :7 I
T1
__2.36
S `
`
b N'�D
)i FE58
Daily Minimum:
220,000
6.60
2.45
8.29
30.50
12.30
750.00
30.80
0.05
0.00
0.00
0.48
90.10
2.36
0.48
0.58
Sampling Type:
Recorder
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Monthly Limit:
Daily Limit:
2,550,000
Sample Frequency:
Continuous
Weekly
Monthly
2xMonthly
2xMonthly
2xMonthly
2xMonthly
2xMonthly
2xMonthly
Monthly
Monthly
2xMonthly
Monthly
Monthly
Monthly
Monthly