Loading...
HomeMy WebLinkAbout310239_Application Revision_20240905w ENGINEERS • MANUFACTURERS • CCNSTRUCTCRS September 5, 2024 Christine Lawson NCDEQ Division of Water Resources 1601 Mail Service Center Raleigh, NC 27699-1601 AFO Permit Application Subject: Melvin Bostic Farm Facility # AWS310239 State Digester General Permit — Design Revision Dear Ms. Lawson, Roeslein & Associates, on behalf of the farm owner, hereby submits the following revision for digester design at Melvin Bostic Farm. As discussed, we are revising the design to eliminate the gravity transfer between existing Lagoon 27500A and existing Lagoon 27500B. This required a significant adjustment to Lagoon B freeboard and we have determined it is better to leave the existing freeboard level in place. Therefore, we will install a floating pump at Lagoon A which will be used to transfer water to Lagoon B as needed. To facilitate your review of the enclosed documentation, the following is an itemized breakdown: 1. One (1) copy of revised "State Digester General Permit Application" application Page 2 of 6; Section 2.8 revised to reflect added pump. 2. One (1) copy of revised engineering calculations to reflect added pump. 3. One (1) copy of revised detailed narrative of the Swine Digester Animal Waste Management System to reflect added pump. 4. One (1) copy of revised General Arrangement Plan to reflect added pump. 5. One (1) copy of revised Hydraulic Profile Plan to reflect added pump. Please do not hesitate to contact me or my office if you have any questions, comments or require any additional information. Thank you, G . �� Christopher Fey Manager, Building Design & Construction Roeslein & Associates Attachments Cc: Farm Owner Page 1 of 1 2.3 Acreage cleared and available for application (excluding all required buffers and areas not covered by the application system): See attached Waste Utilization Plan Required Acreage (as listed in the CAWMP): See attached Waste Utilization Plan Existing Application Area (pre -construction): See attached Waste Utilization Plan Proposed Application Area (post -construction): See attached Waste Utilization Plan) Is there a change to the existing WUP? YES or NO (circle one) Is the Existing WUP attached? YES or NO (circle one) Is the New (if applicable) WUP attached? YES or NO (circle one) 2.4 List and Describe all Storage/Treatment Structures Below: a. DIGESTER or other PRIMARY TREATMENT: (double click on "Select" for drop -down menu box) Treatment Existing? Name of Treatment Type of Liner Surface Type of Cover Ttl Capacity Req'd Capacity Unit Type (Y/N) Unit Material Area Material (cu. Ft.) (cu.ft.) Digester N Lagoon Synthetic 39900 Synthetic (80 mil) 315,956 240,000 27000 Select Select Select Select Select Select a.1 Are engineering designs, drawings, specifications, and details attached? YES or NO (circle one) b. SECONDARY TREATMENT/STORAGE: (double click on "Select" for drop -down menu box) Name of Storage Unit Existing? Y/N Type of Liner Material Surface Area Ttl Capacity cu. Ft. Req'd Capacity (cu.ft.) Lagoon 27500A Y Full clay 77,000 sqft. 586,160 576,789 Lagoon 27500B Y Full clay 67,600 sqft. 575,472 562,092 Select Select 2.5 Are KNOWN subsurface drains present within 100' of any application fields? 2.6 Are KNOWN subsurface drains in the vicinity or under the waste management system? 2.7 Does this facility meet all applicable siting requirements? YES or NO (circle one) YES or NO (circle one) YES or NO (circle one) 2.8 Describe Water Movement between Barns, Digesters, and Storage Ponds (double click on "Select" for drop -down menu box) Location Pump Station or Gravity Pipe Size Minimum Pump Ca acit Plan Sheet Reference GPM TDIJ Barns to Digester Pump Station 6" 697.3 21.13 RA270-00-27000-5 Digester to Secondary Gravity 12" N/A N/A RA270-00-27000-5 Secondary to Tertiary Pump Station 5" 519 8.31 RA270-00-27000-5 Select Select Select Select Select FORM: AWO-STATE-G-DIGESTER-7/15/2022 Page 2 of 6 s� ROESLEIN ENGINEERS • MANUFACTURERS • CONSTRUCTORS 27000 — Melvin Bostic Puma Calc Wet Wei-&&17 El: 78 ft P Su dace: 0 p9 g Level: 7 It Monarch Bioenergy LLC — Register, NC Swine RNG Project A1000 Pump Calc R&A Project RA270-23 Issued 240904 Melvin Bostic Pit Lift Station Digester P Total: 10.48 psi g Pipe 383 P00 384 0: 8 L: 14 4"High Presvre Pump ISHP -28 0: 6 n Vet: 4.997 ft/s Op: Fked spz 4a I800 rpm Fb.' 6"e' 9Dm L• 3 R Vet: 8.473 ft/s HL: 9.790E-03 ft TH: 30.14It HL• 0.944 ft NPSHa: 39.5 it P sn:tTotal: 3.03 psi P disrh Total: 10.89 psi g Power In: -- E8: __ NPSHr. -- Wet W ell-&&72 El: 85.Sft P Surface: 0 pa g Level: 7 It 3 P Total: 11.77 psi g Pipe 311 Pipe 312 0:6in 0:6n L: 15R L-520ft Vol: 8.473 ft/s Val: 8.473 ft/s HL: 2.034 ft HL• 18.15 ft Melvin Bostic Lagoon 27500A to Lagoon 27500B Water Transfer P Totat 2.471 psi g P Total: 3.573 psi g Pipe 517 0: Sin 4" Hog Pump SHP Ppe 518 0: 5 in INS Pipe 515 0: 5 in Pipe 516 0: 5 it L: 1 ft Vel: 8.943 ft/s Op: Fked Speed @ 1800 rpm Fbw: 519 gpm L: 3 ft L• 15 R L• 100 ft HL: 0.04742 ft TH: 5.861 ft Val: 8.943 ft/s ft Vel: 8.943 ft/s Vel: 8.943 ft/s NPSHa: 39.46 ft HL• 1.113 HL• 2459 R HL• 4.742 ft P suct Total: 3.014 pa g P disch Total: 2.954 pa g Power In: -- Eff: -- NPSHr: -- Pressure Boundary 60 EI: 94 ft Op: P Total @ 0 psi g Fbw: 697.3 gpm P Static:-0.4836 psi g P Dynamic: 0.4836 psi Lagoon Pressure Boundary 91 El: 90 R Dp: P Total @ 0 psi g Flow 519 gpm P Static: -0.5388 psi g P Dynamic: 0.5388 psi ROESLEIN. ENGINEERS MANUFACTURERS OJNSTRUCTORS Digester - Volume Calculations Project: BOSTIC, MELVIN Project No: RA270 Date: 2024-09-05 Rev: 0 Existing Configuration (For Reference) Farm Information: Farm Population: BOSTIC, MELVIN 4,800 GF Total: 4,800 Storm and Rainfall: Storm (25-yr, 24-hr): 7.5 in. Heavy Rain: 7.5 in. Proposed Configuration (Proposed Digester) Flow Path: Barns -> Digester (Proposed) -> Existing Lagoon Location: Duplin County, NC Design By: 1RE Checked By: MWK *Note: Roeslein Digesters are designed regarding Hydraulic Retention Time, not NCDEQ Minimum Treatment Volume for hog farms *Note: New digester lagoon is NOT providing additional treatment storage capacity in accordance with NCDEQ standards (135 cuft/lb*lb/hog), but instead serves as a steady-state reservoir, diverting additional water volume to existing treatment lagoons for storage and land application. *Note: Existing Melvin Bostic lagoons designed by Jimmy Vinson 4-11-1997, 11-26-1991 Volumes: Total Capacity 4,800 Capacity I cf/head J= Total Treatment Volume=1 4,8001 501 240,000 cf Capacity I Retention Time (days) I=Total Volume for Retention Time= 1 4,8001 40.001 121,048 cf Volume (cf) I Days of HRT Storage Provided Retention Time (days)= 1 241,140 1 97.53 Desired Digester Treatment Volume: Sludge Storage: Storm Storage: Heavy Rain: Total: Volume Required (cf) Volume Provided (cf) Lagoon Calculations Lagoon Volumes 240,000 241,140 0 0 0 0 0 0 240,000 241,140 Note: Sludge storage value is shown as 0 because seed sludge volume is negligible and influent sludge volume is accounted for in the 50 cuft/hd and 40 days HRT values. Note: Both Rainfall values set to 0 because no rainfall will enter the sealed digester. Excess will be pumped off of cover. Note: Per Conservation Practice Standard Waste Treatment Lagoon (Code 359) "General Criteria for All Lagoons", the digester storage volume does not need to account for rainfall for completely covered digesters. Total Temorary Storage Proposed Configuration (Proposed Digester) Digester (Proposed) Volume Vol. (cf) High Pump Elevation: 249,951 Low Pump Elevation: 232,479 Temorary Storage: 17,472 Digester (Proposed) Berm Length (FT): 285 Digester(Proposed)Berm Width(FT): 140 Digester (Proposed) Berm Slope: 3 Digester(Proposed)Stage-Storage Elevation (ft) Area (sf) Incr. Vol. (cf) Cumul. Vol. (cf) 81.9 14,484 - 82.9 16,206 15,339 15,339 83.9 18,000 17,097 32,436 84.9 19,866 18,927 51,363 85.9 21,804 20,829 72,192 86.9 23,814 22,803 94,995 87.9 25,896 24,849 119,844 88.9 28,050 26,967 146,811 89.9 30,276 29,157 175,968 90.9 32,574 31,419 207,387 91.9 34,944 33,753 241,140 92.91 37,386 1 36,159 1 277,299 93.91 39,900 1 38,637 1 315,936 Digester Treatment Volume: at High Pump Elevation of: at Start Pumping Elevation of: at Low Pump Elevation of: Elevation (ft) Cumul. Vol. (cf) 92.15 249,951 91.90 241,140 91.65 232,479 Elevation Vol. (cf) Top of Dike Elev. = 93.9 315,936 High Pump Elev. = 92.15 249,951 Start Pumping Elev. = 91.90 241,140 Low Pump Elev. = 91.65 232,479 Min. Operating Elev. = 89.9 175,968 Planned Sludge Elev. = 83.9 32,436 Finished Bottom Elev. = 81.9 - ROESLEIN ENGINEERS • MANUFACTURERS • CONSTRUCTORS 27000—BOSTIC, MELVIN Digester Narrative Monarch Bioenergy LLC — Register, NC Swine RNG Project A1000 Digester Narrative R&A Project RA270-23 Issued 240819 Farm will utilize existing barns with slotted floors over flushing pits to collect manure. The farm operators use pull plug system and recycle water for flushing to manage the animal manure. As part of this current project, a new anaerobic lagoon digester will be installed, and the animal manure will be redirected to the new digester. After treatment in the in anaerobic digester, the effluent will flow into the existing lagoon. There is no change to the existing farm operations, nor the volume of wastes generated. The effluent water will be recycled back to the barn for pit recharge or irrigated in accordance with the existing Waste Utilization Plan (WUP). Upon flushing, the wastewater from the barns will be directed into a properly designed lift station through a 12-inch diameter gravity pipe header. There will be two pumps in the lift station wet well and each pump is designed for 100% of the design flow. The lift station pump will be 15 HP GEA pump, designed for a flow of 697 gallons/minute, through 6-inch diameter, HDPE SDR 17 force -main into the new anaerobic lagoon digester. The approximate dimensions of the new anaerobic lagoon digester are 285 feet by 140 feet with a total volume of 315,936 cubic feet and a treatment capacity of 241,140 cubic feet at operating level. Before the excavation, the project area is stripped approximately 6 inches of topsoil and will be stockpiled. Embankment material will be free of sod, roots, and other objectionable material. The maximum thickness of each compacted layer will be 6-inches and compacted to 95% of Standard Proctor at -1 to +3 percent of optimum moisture content per ASTM D698. Each lift shall be tested for moisture and density. The stockpiled topsoil will be spread on the outside bank. After the construction the lagoon, and all required pipe penetrations, the inside walls of the lagoon will be smooth rolled prior to the installation of the baseliner. The baseliner will be 60-mil think HDPE synthetic liner. After the liner is installed, it will be tested for leaks prior to filling the lagoon with wastewater. There will be an outlet structure with a weir (level control) that keeps the water level inside the digester at a constant level. The effluent will gravity flow through a 12-inch diameter digester outlet pipe to the level control wet well and gravity feed into the existing lagoon through a 12-inch diameter pipe. Water will be transferred back to the existing lagoon 27000B a floating 5 HP GEA transfer, designed for a flow of 519 gallons/minute, in lagoon 27000A through a 5" HDPE SDR 17 force -main. Once the lagoon is within in 2 feet of the normal operating level, a floating cover will be installed to capture the biogas produced by the anaerobic digestion of the organic wastes in the wastewater. The captured biogas will be treated to produce renewable natural gas (RNG) by a micro -gas cleaning skid (micro-GUS). Tail gas from micro-GUS will be vented to atmosphere, with levels documented in PAD letter. y PROPERTY LINES 2 t w" 100' WELL OFFSET PROPOSED METER DROP -moo S2 RA-STD-295 27500A owl ! Q�� I S 1 RA-STD-280 -o WATER TRANSFER PUMP FROM 27500A TO 27500B L EMSL Oft PL PL PL HARY STEWART 9/4/2024 3:27:01 PM C:\VAULT\PROJECTS\MONARCH BIO ENERGY\REGISTER, NC\CADD\01 A� Q� ,off Q40* � A� Qv 6 SEWER INFLUENT LINE MODIFICATIONS NEEDED DIGESTER INFLUENT - S-6 RA-STD-266 — PROPOSED METER DROP v ---- X � 1 EXISTING POWER POLE 50' OFFSET r5 �X DIGESTER EFFLUENT 27500B AREA 1000 MELVIN BOSTIC FARM 27000 LOCATION DETAIL ENERALARRANGEMEN / � I HEREBY CERTIFY THAT THIS I I / ENGINEERING DOCUMENT WAS PREPARED BY ME OR UNDER MY McC L U R E TM DIRECT PERSONAL SUPERVISION AND AT I AM A DULY LICENSED PROFESS ONAL ENGINEER UNDER making lives better THE LAWS OF THE STATE OF NORTH CAROLINA. 2001 W. BROADWAY, COLUMBIA MO 65203 573-814-1568 MY LICENSE NUMBER IS NC CERTIFICATE OF AUTHORITY C-4628 LICENSE —NO N TRUE NORTH FARM i- PRODUCTION INFORMATION CITY AVG ANNUAL ANIMAL POPULATION 11200 ESTIMATED RNG INJ DTH/YR 13195 AN I MAL TYPE GF BARN OPERATION TYPE Flush SYSTEM OPTION SELECTED QTY EXISTING BARN EFFLUENT GRAVITY SEWER 14 S-1 DIGESTER INFLUENT LIFT STATION 2 GRAVITY & FORCED WATER S-2 DIGESTER EFFLUENT TRANSFER 1 each S-3 WET WELL YES 2 S-4 COVER/RAIN WATER REMOVAL YES 2 S-5 NOT USED S-6 POWER FLUSH YES 1 S-7 SLUDGE REMOVAL YES 1 S-8 EMERGENCY VENT YES 2 S-9 BIOGAS INTERFACE YES 1 DIGESTER PARAMETER VALUE UNITS LENGTH 285 FT WIDTH 140 FT TOP OF DIKE ELEVATION 93.9 FT DEPTH 12 FT BOTTOM ELEVATION 81.9 FT DIKE WIDTH 15 FT INTERIOR SLOPE 3:1 EXTERIOR SLOPE 3:1 OPERATING HEIGHT 10 FT OPERATING ELEVATION 91.9 FT R LOW DIGESTER OPERATING HEIGHT N/A FT LOW DIGESTER OPERATING ELEVATION N/A FT OPERATING VOLUME 1803968 GAL TOTAL VOLUME 2363517 GAL CUT 5960 CY FILL 5746 CY NET 215 CY '912: SERVICE SIZE SPECIFICATION CITY UNITS BARN EFFLUENT (GRAVITY) 1211 PL01 950 FT EXISTING BARN EFFLUENT (FORCED) N/A N/A N/A N/A LIFT STATION OVERFLOW 12" HP01 100 FT DIGESTER INFLUENT (FORCED) 811 HP02 2000 FT DIGESTER INFLUENT (FORCED) N/A N/A N/A FT DIGESTER INFLUENT CLEANOUT X 11PL01 N/A EA DIGESTER EFFLUENT (FORCED) 611 HP02 1000 FT WATER TRANSFER WET WELL LATERAL 12" HP01 50 FT DIGESTER EFFLUENT (GRAVITY) 12" HP01 200 FT WET WELL LATERAL N/A N/A N/A FT COVER WATER SUCTION 311 HP01 80 FT COVER WATER DISCHARGE 311 HP02 200 FT POWER FLUSH 611 HP02 100 FT SLUDGE REMOVAL 12" HP02 50 FT MIXING SUCTION 811 HP02 50 FT MIXING DISCHARGE 611 HP02 400 FT 4 U45tN I UHANIitU CiKAVI I Y LINt I U UICit51 tK L 1 5 I Jt Ut- SCALE ill - 75' SIZE E MILLIMETERS: 3 18JULY24 UPDATED LAGOON BACKGROUND INFORMATION ZTS CF MK 2 20JUN24 UPDATED LAGOON CALCULATION INFORMATION ZTS CF MK :xx =±o.io xxx =10.010 ANGLES =±0.5' 1 19APR24 ISSUED FOR PERMITTING ZTS CF KPL DIMENSION TOLERANCE (UNLESS OTHERWISE SPECIFIED) 0 15APR24 ISSUED FOR PERMITTING ZTS CF KPL REV DATE REVISION DESCRIPTION DRWN CHK'D APP'D FRACTIONS: MACHINED PARTS =±1/64 INCHES: # BY I BY I BY THIS DOCUMENT, ALONG WITH ITS DESIGNS, KNOW-HOW AND DRAWINGS, CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION THAT IS THE PROPERTY OF ROESLEIN & ASSOCIATES, INC. AND ROESLEIN ALTERNATIVE ENERGY, LLC AND IS PROTECTED UNDER STATE HOLE LOCATIONS ON .X =±.020 AND FEDERAL LAW, INCLUDING 18 USC SECTION 1836 AND 17 USC SECTION 101 et seq. ROESLEIN & ASSOCIATES, INC. AND ROESLEIN -+1/32 =±.010 ALTERNATIVE ENERGY, LLC RESERVES ALL PATENT, COPYRIGHT AND OTHER PROPRIETARY RIGHTS TO THIS DOCUMENT, INCLUDING ALL WELDED ASSEMBLIES .XX =±.005 DESIGN, MANUFACTURING, REPRODUCTION, USE, AND SALES RIGHTS THERETO, EXCEPT TO THE EXTENT SAID RIGHTS ARE EXPRESSLY LINEAR DIMENSIONS ON .XXX =±.0002 GRANTED TO OTHERS. THIS DOCUMENT MUST NOT BE DUPLICATED OR DISCLOSED, IN WHOLE OR IN PART, WITHOUT THE EXPRESS =±1/16 STRUCTURAL WELDMENTS .XXXX WRITTEN PERMISSION OF ROESLEIN & ASSOCIATES, INC. AND ROESLEIN ALTERNATIVE ENERGY, LLC. ANY USE OF THE INFORMATION ANGLES =±.05° CONTAINED IN THIS DOCUMENT OTHER THAN BY THE AUTHORIZED RECIPIENT FOR THE EXPRESS PURPOSE FOR WHICH IT HAS BEEN ANGLES =±1 ° PROVIDED IS STRICTLY PROHIBITED. UPON THE REQUEST OF ROESLEIN & ASSOCIATES, INC. AND ROESLEIN ALTERNATIVE ENERGY, LLC THE HOLDER OF THIS DOCUMENT AGREES TO IMMEDIATELY RETURN OR DESTROY THIS DOCUMENT AND ALL COPIES THEREOF IN ITS POSSESSION. 92023 ROESLEIN & ASSOCIATES, INC. AND ROESLEIN ALTERNATIVE ENERGY, LLC DO NOT SCALE PRINT MONARCH BIOENERGY REGISTER, NC AREA 1000 MELVIN BOSTIC FARM GENERAL ARRANGEMENTS ENGINEERS • MANUFACTURERS • CONSTRUCTORS DWG. SHEET REV NO. RA270-00-27000 4OF6 4 120 110 100 70 NORTH BARNS LIFT STATION (SEE DETAIL) FF:90.8 FF:90.8 FF:90.8 FF:90.8 PIT:89.50 PIT:89.50 PIT:89.50 PIT:89.50 I I � NOTE: INVERTS OF EXISTING GRAVITY PIPING ARE APPROXIMATED BASED ON BEST AVAILABLE SURVEY INFORMATION. 120 110 d1iZf, LEVEL CONTROL WET WELL HnoE (`OVER TOB: 93.90 �� SEE DETAIL ( ) RIM:940 OUTLET: FLOATING PROPOSED 91.90 (LC-2) PUMP TOB: 92.50 SOUTH BARNS DIGESTER EXISTING TOB: 91.00 RIM- 90.00 OL: 91.90 r�L LAGOON 27500A FB: 91.50 EXISTING FF:90.6 FF:90.6 INV:89.15 LAGOON 27500B FB: 90.00 90 PIT:89.50 PIT:89.50 -INV: 88.90 TOP OF STORM: 90.00 INV: INV: 88.40 i I LEVEL �� LEVEL TOP F TEMP 89 90Fpl2 CONTROL CONTROL STORAGE:88.65 PIPE (LC-1) IPE (LC-2) 0.5 MMIN. 0.25°�° MIN. BOTTOM: 86.40 SHWT: 85.00 BOTTOM: 81.90 BOTTOM: 80.00 80 BOTTOM: 78.00 70 LEGEND: TOB: TOP OF BANK ELEVATION FF: FINISHED FLOOR ELEVATION FB: FREEBOARD ELEVATION EG: EXISTING GRADE ELEVATION OL: OPERATING LEVEL ELEVATION INV: INVERT ELEVATION SHWT: SEASONAL HIGH WATER TABLE LIQUID FLOW DIRECTION CHAMILTON 9/4/2024 2:08:22 PM R:\200599\06-DRAWINGS\CIVIL\AlK\REGISTER-CLUSTER 1\AFO PERMIT DRAWINGS\27000 BOSTIC AFO PERMIT.DWG