Loading...
HomeMy WebLinkAboutGW1--05002_Well Construction - GW1_20240828 • • WELL CONSTRUCTION RECO (GW-11 For Internal Use Only: • 1.Well C ctor.I■ atlo :4 . •14.WATER LONIS WeD oc ass FROM3.1-7"-- ' . rt' TO�ft. .4511A ft. ft.n NC Well Contractor Certification Number U ]S.ROUTER CASINO(for m DIAMETER I. ORT UWER(flap GMAT) 3 r -�V s FROM TO DIA111I11Q 1 7>�Qa+rss MATERIAL R n I.. Company Name ,,+J /� �/`1 INNEtt CASING OR TUBING(geothermal elated-leap) 2.Well Construction Permit N: lJ` O'V v L?6(/Z PRIf.OM ro DIAMETER' THIOO4Rsa MATERIAL. Llaf ell applicable well canunnalon penal*11.e.On Comity,Stara,Variance,614 --I- if` � ) f (t Gj74 V' �h e p L 11J 3.Well Use(check well use): ft. ft. ha • Water Supply Well: 17.SCREEN — • FROM TO DIAMETER SLOT THICENtgg MATE OAgncultunl OMuoicipaVPublic ft. n MI °Geothermal(Heating/Cooling Supply) idential Water Supply(single) — n ft I.. ❑Industrial/Commercial Residential Water Supply(shared) IL GROUT • °irrigation °Wells>100,000GPD FROM TO - MATERIAL IMPMCLMENTMEIHODAAA Non-Water Supply Well: D R 2-� ft- /1 e t ^ n 1.-ll - Monitoring - OR Y R. R / Y 1 V(� Y Injection Well: PPr/ Aw ,, ' • °A uiferRech R _ R 9 OGrowrdwaler Remedialion D.SATtD/GRA`ELPACZC[tf no pike ble) °Aquifer Storage and Recovery °Salinity Barrier - ' ' FROM TO MATERIAL trRIACR.fwr Mrruoi 0 Aquifer Test OStormwater Drainage ft R • °Experimental Technology ❑Subsidence Control' ft. ft • °Geothermal(Closed Loop) °Tracer '20.DRILLING LOG(attach addldaaal abeets if aeceuaq) °Geothermal(Heating/Cooling Return) °Other(explain under#21 Remark') FROM TO DtSCRltitpN(ular,b.ri.n,,.wr.de tJpe,Livia abet R R 4.Date Well(s)Completed: 3-1 / - Well IDI • n 'n . Sa.. y WellLocation: ft. ft.• I ;M6 l n' tii l ft. rt. • Factlity/Owaa Nom.� Facility lDI(if appl• icable) it ft. :� 0 C V Phial Address City.and Zip I ft. rt. lit r t-t. ? • 21.REMARKS/' County Parcel Identification No.(PIN) _ • • 5b.Latitude and longitude In degrees/nd■ntea/secoads or decimal degrees: (dwell field,nee lat/long i1 aufficieet) ram` 3/ � � � r .. 22.Ccrtlfic M �y h ' N 0.6 ' -50 ' �' W 01 L. f.Is(are)the well(s): {drermanent or °Temporary I I A 1 S4s�wm ofC ' ed'Well,Comracter Date ���111 By tinning this form I herby cuter that the well(:)war(were)canrwued In acconlar 7.Is this a repair to an existing well: °Yes or INo 15A hr..1C 02C:0)00 or'15A1lCAC 02C.0200 Well Construction Standard*and then'this is a repair,fill owl bwn ra well comp action afornaran explain the nature of the of the'sand bah b can prvrided b the wen owner. •repair miler 021 remarks section or on the bock alibis form. 23.Site diagram or additional well details: $.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the shone You may usetho back of this page to provide additional well construction construction,only 1 GW-1 is needed. Ind:cote TOTAL NUMBER of wells ( 'See Over'in Remarks Box).You may also attach additional pages if nett drilled: I 24.SUBMITEAL INSTRUCTIONS ' 7.Total well depth below land striate: `--`- Few multiple wells list all depth:((different(example-36200'and:WOO) (It) Submit this GIP-1 within 30 days of well completion per the following: 10.Static water level below to of casi■' r 24a. For. All Wells: Original Resources (E If water level a above casing.:las"+"/� /�J6 I I T w (B) Information Processing Unit,1617 k1SC,.Raleigh,NC 276ision of 99-1617 • 11.Borehole diameter: � ! b ) 24b.For Iojectlou Wells: Copy to DWR,'Underground Program,1 G36 MSC,Raleigh,NC Z7699-163 Injection Control IOW, Well construction method: R a f a Ill •— A 1- x [tELLger,:Marx cable,dint omit,etc.)) 24c.For ter Simply ant department Geothermal Return Wells:Copy • tout envnonmen epartment of the county where installed FOR WATER SUPPLY WELLS ONLY: . S24d.For Water Wells prodddo¢over 100,000 GPD:Copy to DWR,CCP 13a.Yield(gym) Method of tat • Ai)' Permit 1611 MSC,Raleigh,NC 27699-1611 �j s+ 13b.Dish■feetion type: i /°Amorist: .`s/