Loading...
HomeMy WebLinkAboutSW3240306_Design Calculations_20240829 1-)Z br DUKE ENERGY® a ;; z C i v i I Calculations StAtt.d Sc O 2 \ z Lyle Creek Switching Station c. ' I Catawba County, North Carolina yy \ August 28, 2024 (/ \ ?0 �FESS/o' /'L ': QQ` �1. SEAL�, •- M 0337%Mt _ Duke Energy I Lyle Creek Switching Station L�� Contents r Contents Contents 1.0 Project Description 1 2.0 Stormwater Calculations 1 2.1 Stormwater Peak Flow Calculations 1 2.2 Stormwater Pipe Calculations 2 2.3 Stormwater Channel Calculations 3 2.4 Stormwater Management 3 3.0 Erosion & Sediment Control Calculations 3 4.0 Earthwork Calculations 4 Appendices Appendix A— Soil Data Appendix B — Stormwater Peak Flow Calculations Appendix C — Stormwater Pipe Calculations Appendix D — Stormwater Channel Calculations Appendix E — Sediment Basin Calculations Appendix F — Earthwork Calculations Appendix G — NCDEQ Post-Construction Stormwater Permitting Map Appendix H — Rip Rap Outlet Calculations Appendix I — Silt Fence Calculations Duke Energy I Lyle Creek Switching Station F1J � Project Description 1 .0 Project Description Duke Energy (Duke) has ownership of two adjacent parcels and an easement with a total acreage of 25.74 acres. The parcels are located east of Lee Cline Road and south of Stafford Street in Catawba County, approximately 3 miles NNE of the City of Conover. This site is located within the Catawba County jurisdiction. Duke is planning to build a switching station with a transmission tie to an existing transmission line. Access to the switching station will be off Rabbit Crossing Lane through an existing Duke easement and through one of the existing Duke properties. The total disturbance proposed to construct the switching station, transmission lines, and access roads is 19.51 acres. 2.0 Stormwater Calculations The stormwater calculations were performed based on the post-construction site conditions. The goal of the stormwater design was to meet Duke Energy's pipe and channel design requirements utilizing widely accepted engineering hydrologic and hydraulic design practices and procedures. The following is a list of Duke Energy's pipe and channel design requirements for this project: • Pipe and Culverts: o Pipe capacity shall be sufficient to carry the 25-year, 24-hour storm event. o The headwater/pipe diameter ratio (HW/D)for pipe culverts shall be less than 1.2 for the 25-year, 24-hour storm event. o A minimum freeboard of 0.50 feet should be provided from the crest of the embankment on pipe culverts for the 25-year, 24-hour storm event. o The outlet velocity for the 25-year, 24-hour storm event shall be less than 10 fps. o An energy dissipation measure such as a riprap apron is required to handle the 25-year, 24-hour storm event at all pipe outlets. • Channels: o Side slopes shall be no steeper than 3:1; and no steeper than 4:1 within an transmission line easement. o A minimum freeboard of 0.50 feet should be provided from the crest of the channel side slope for the 25-year, 24-hour storm event. o Channel velocities for grass lined channels shall not exceed 4.5 fps for the 25- year, 24-hour storm event. If the velocity exceeds 4.5 fps, permanent armoring of the channel will be required. 2.1 Stormwater Peak Flow Calculations A hydrologic analysis was completed using the NRCS hydrologic method (details for this methodology can be found in the NRCS National Engineering Handbook, Section 4). Sub- drainage areas were delineated for each of the points of interest and can be seen on the drainage area map in the design plans on 44949890DRG01 and 44949890DRG06. Composite curve numbers were calculated for each sub-drainage area utilizing the proposed land cover and the hydrologic soil groups for the site found in the Soil Survey of Catawba 1 Duke Energy I Lyle Creek Switching Station 1 �� Stormwater Calculations J County, North Carolina. A majority of the site was determined to have soils in hydrologic soil group "B". The NRCS Soil Resource Report for the site can be found in Appendix A. The time of concentration for each sub-drainage area were either calculated or assumed to be the minimum of 5 minutes for flow paths that were either short or primarily within the developed area. The procedure for determining the CN and time of concentration can be found in the NRCS, TR-55, Second Edition, June 1986. A hydrologic routing model was developed using the Hydraflow Hydrographs software program. The calculated drainage area size, composite curve number and time of concentration for each sub-drainage area was entered into the software. The total rainfall depths for the 25-year, 24- hour storm event was obtained from the National Oceanic and Atmospheric Administration's website. The total rainfall depth was entered into the model and ran utilizing the NRCS Type II rainfall distribution with a one-minute time interval. The full stormwater peak flow calculations can be found in Appendix B of this report. 2.2 Stormwater Pipe Calculations The site was designed to incorporate as much low impact development as feasible which included utilizing vegetated conveyance for stormwater runoff around the substation pad. The only storm drainage piping designed on the site is an access road culvert to carry runoff from pervious areas under the access drive. The results from the stormwater peak flow calculations were used to determine the required pipe size for the 25-year, 24-hour storm event. The culvert was also analyzed against the 100- year storm to ensure that overtopping of the access drive does not occur. The culvert capacity calculation was completed using the Hydraflow Express software. Hydraflow Express utilizes the Manning's equation to determine the pipe capacity based on gravity flow and utilizes Bernoulli's Energy Equation to calculate the hydraulic grade line. The pipe design criteria (i.e. pipe length, slope, material/manning's N) was input into the software based on the design plans. Then a pipe size was selected that would meet Duke Energy's design requirements. Riprap outlet protection was sized using the results from the stormwater peak flow calculations. The minimum riprap outlet protection size was determined by the using Figure 8.06a from the NCDEQ Erosion and Sediment Control Planning and Design Manual. This figure utilizes the peak discharge to determine the minimum riprap apron size and median stone size (D50). The full stormwater pipe calculations can be found in Appendix C of this report. Rip rap outlet protection sizing charts can be found in Appendix H of this report. 2 Duke Energy I Lyle Creek Switching Station F1J � Erosion&Sediment Control Calculations 2.3 Stormwater Channel Calculations Multiple channels have been designed to convey stormwater run-on that runs off the site. The results from the stormwater peak flow calculations were also used to calculate the normal depth of flow for the 25-year, 24-hour storm event in the proposed channels. The normal depth calculation was completed using North American Green Erosion Control Materials Design Software (web application), as all channels are to be grass lined. Once the normal flow depth was calculated, the freeboard in the channel was evaluated to determine if it met Duke Energy's design requirements. This was done by subtracting the calculated normal flow depth from the depth of the channel. The shear stress was also calculated in the channel for the 25-year storm event to evaluate the need for temporary and permanent channel lining. The procedure for calculating shear stress can be found in Section 8.05.12 of the NCDEQ Erosion and Sediment Control Planning and Design Manual. The shear stress calculation was completed using North American Green Erosion Control Materials Design Software (web application) for all temporary liners and permanent grass lined channels. The software calculates the channel shear stress and determines which channel lining is adequate to protect the channel from erosion. For the purposes of this calculation, North American Green RollMax biodegradable mesh with coir products were chosen for evaluating the temporary channel lining needs. Any other approved equal product may be substituted during construction. The full stormwater channel calculations can be found in Appendix D of this report. 2.4 Stormwater Management The site is located the state permitting authority of North Carolina as shown in Appendix G. This site is located within the Upper Lake Norman (Lyle Creek) watershed, WS-II. The maximum BUA for this watershed is 30%. A Built-Upon-Area (BUA) analysis was performed and resulted in a BUA of 15.09%. The BUA Analysis can be found in the design plans on 44949890DRG05. Due to the BUA being less than 30%, no permanent stormwater management facility is needed for the construction of the switching station. 3.0 Erosion & Sediment Control Calculations The erosion and sediment control calculations were performed based on the site conditions during construction. Runoff drains from the site in the southern direction into 1 drainage area as seen on 44949890DRG04 in a temporary sediment basin. The sediment basin was sized following the requirement as described the NCDEQ Erosion and Sediment Control Planning and Design Manual. The temporary sediment basin calculations can be found in Appendix E of this report. Perimeter erosion control measures include silt fencing, silt fence rock outlets, and silt fence rock outlets with J-hooks. Silt fencing calculations can be found in Appendix I. 3 Duke Energy I Lyle Creek Switching Station 1 1Z Earthwork Calculations J 4.0 Earthwork Calculations The earthwork calculations were performed to minimize excess or insufficient material to grade the substation pad and access drive, while maintaining a pad elevation above the existing grade to ensure drainage flows off the pad. The raw calculation was performed using Autodesk Civil 3D software. The software compares the existing topographic surface to the proposed surface represented by the proposed contours. The cut and fill volumes determined by the software were then utilized in an earthwork calculation spreadsheet. This spreadsheet further analyzes the cut and fill volumes and adjusts these volumes based on topsoil strippings and imported materials. It also applies a fill factor which is based on the shrinkage of cut material when compacted as fill. For this project, the fill factor was assumed to be 15% based on NCDOT published shrinkage factors for Catawba County. The earthwork calculation can be found in Appendix F of this report. 4 Duke Energy I Lyle Creek Switching Station r)� Appendices A Appendix A — Soil Data NCRCS Soil Survey USDA United States A product of the National Custom Soil Resource Department of Cooperative Soil Survey, Agriculture a joint effort of the United Report for States Department of RCS Agriculture and other Catawba County, Federal agencies, State Naturalagencies including the North Carolina Resources Agricultural Experiment Conservation Stations, and local Service participants y.- �w \-- me 4-1 X 6 ' �� S_taff rod t Irfpg 1 . .., __.4. .4. jiA 1. it- ._ - f 0 lirier'is ' %-: ,."•i • * •#* . k $�► Y , l'` a .. j�- 1111. tt f ' A' • A '� N. O, ,�,_ .. • 4fC-'i:•:.„t•.....o-r- _lkII, . ..I.% .. - -' .,...,. l4.i D� _ r s' ., �P 7 ` r_......... 1 r U CH ft a®,, .•, -. .-. November 16, 2023 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/ portal/nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nrcs)or your NRCS State Soil Scientist(http://www.nres.usda.gov/wps/portal/nres/detail/soils/contactus/? cid=nrcs142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require 2 alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice)or(202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3 Contents Preface 2 How Soil Surveys Are Made 5 Soil Map 8 Soil Map 9 Legend 10 Map Unit Legend 11 Map Unit Descriptions 11 Catawba County, North Carolina 13 CsA—Codorus loam, 0 to 2 percent slopes, frequently flooded 13 DaA—Dan River loam, 0 to 2 percent slopes, frequently flooded 15 FaE3—Fairview clay loam, 10 to 25 percent slopes, severely eroded 16 PxF4—Poplar Forest-Udorthents complex, 25 to 45 percent slopes, gullied 17 TmB—Tomlin loam, 2 to 6 percent slopes 19 TmC—Tomlin loam, 6 to 10 percent slopes 20 ToB2—Tomlin clay loam, 2 to 6 percent slopes, moderately eroded 21 ToC2—Tomlin clay loam, 6 to 10 percent slopes, moderately eroded 22 References 24 4 How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil 5 Custom Soil Resource Report scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil-landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and 6 Custom Soil Resource Report identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. 7 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 8 Custom Soil Resource Report Soil Map N N N 4808W 480700 480800 480900 481000 4811W 481200 481300 35°45'6"N , 35°45'6"N ). t'41 \ •- ewikommt� 1/8 CSA )- '� Stafford St �' PxF4 �; P .V ?% 1 FaE3 4 — ToC2.- . CsA� ToB2 .f TmB 8 8 TmB A ToC2 yl TmC • I 1;' Y 1. ELA G`aap nu vp miq L e7,iUp7 as aG-uom,7c,,aOQo • 35°44'33"N - — 35°44'33"N 480600 4807W 480800 4809X 481000 4811W 481200 481300 3 3 Map Scale:1:4,990 if printed on A portrait(8.5"x 11")sheet. N Meters N 0 50 100 200 300 7,1 Feet 0 200 400 800 1200 Map projection:Web Mercator Comer coordinates:WGS84 Edge tics:UTM Zone 17N WGS84 9 Custom Soil Resource Report MAP LEGEND MAP INFORMATION Area of Interest(AOI) 14 Spoil Area The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:15,800. Q Stony Spot Soilsit Very Stony Spot Soil Map Unit Polygons Warning:Soil Map may not be valid at this scale. tl Wet Spot ,..,. Soil Map Unit Lines Enlargement of maps beyond the scale of mapping can cause p Other misunderstandingof the detail of mapping and accuracyof soil p Soil Map Unit Points pp 9 .� Special Line Features line placement.The maps do not show the small areas of Special Point Features contrasting soils that could have been shown at a more detailed Blowout Water Features scale. Streams and Canals kg Borrow Pit Transportation Please rely on the bar scale on each map sheet for map * clay Spot 1.44 Rails measurements. 0 Closed Depression pu/ Interstate Highways Gravel Pit Source of Map: Natural Resources Conservation Service ti US Routes Web Soil Survey URL: Gravelly Spot Major Roads Coordinate System: Web Mercator(EPSG:3857) ® Landfill Local Roads Maps from the Web Soil Survey are based on the Web Mercator • Lava Flow Background projection,which preserves direction and shape but distorts distance and area.A projection that preserves area,such as the 46 Marsh or swamp Aerial Photography Albers equal-area conic projection,should be used if more It Mine or Quarry accurate calculations of distance or area are required. 4 Miscellaneous Water This product is generated from the USDA-NRCS certified data as O Perennial Water of the version date(s)listed below. v Rock Outcrop Soil Survey Area: Catawba County,North Carolina + Saline Spot Survey Area Data: Version 24,Sep 13,2023 Sandy Spot Soil map units are labeled(as space allows)for map scales Severely Eroded Spot 1:50,000 or larger. • Sinkhole Date(s)aerial images were photographed: Apr 22,2022—May 31 Slide or Slip 10,2022 oa Sodic Spot The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps.As a result,some minor shifting of map unit boundaries may be evident. 10 Custom Soil Resource Report Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI CsA Codorus loam,0 to 2 percent 0.0 0.0% slopes,frequently flooded DaA Dan River loam,0 to 2 percent 16.8 20.7% slopes,frequently flooded FaE3 Fairview clay loam, 10 to 25 0.2 0.3% percent slopes,severely eroded PxF4 Poplar Forest-Udorthents 0.8 1.0% complex,25 to 45 percent slopes,gullied TmB Tomlin loam,2 to 6 percent 14.0 17.2% slopes TmC Tomlin loam,6 to 10 percent 9.9 12.2% slopes ToB2 Tomlin clay loam,2 to 6 percent 5.4 6.6% slopes,moderately eroded ToC2 Tomlin clay loam,6 to 10 34.2 42.1 percent slopes,moderately eroded Totals for Area of Interest 81.3 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They 11 Custom Soil Resource Report generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. 12 Custom Soil Resource Report Catawba County, North Carolina CsA—Codorus loam, 0 to 2 percent slopes, frequently flooded Map Unit Setting National map unit symbol: 2mlxw Elevation: 200 to 1,560 feet Mean annual precipitation: 40 to 48 inches Mean annual air temperature: 50 to 59 degrees F Frost-free period: 160 to 200 days Farmland classification: Prime farmland if drained and either protected from flooding or not frequently flooded during the growing season Map Unit Composition Codorus and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Codorus Setting Landform: Flood plains Landform position (three-dimensional):Tread Down-slope shape: Concave Across-slope shape: Linear Parent material: Loamy alluvium derived from igneous and metamorphic rock Typical profile A -0 to 8 inches: loam Bw1 - 8 to 18 inches: silty clay loam Bw2- 18 to 30 inches: loam Bw3-30 to 38 inches: silt loam BCg-38 to 50 inches: silt loam Cg- 50 to 80 inches: silt loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Drainage class: Somewhat poorly drained Runoff class: Low Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table:About 6 to 24 inches Frequency of flooding: Frequent Frequency of ponding: None Available water supply, 0 to 60 inches: High (about 10.7 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4w Hydrologic Soil Group: B/D Ecological site: F136XY110VA- Mesic temperature regime, flood plain forest, wet Hydric soil rating: No 13 Custom Soil Resource Report Minor Components Hatboro, undrained Percent of map unit: 5 percent Landform: Depressions on flood plains Landform position (three-dimensional):Tread Down-slope shape: Concave Across-slope shape: Linear Hydric soil rating: Yes Pfafftown Percent of map unit:2 percent Landform: Stream terraces Landform position (three-dimensional):Tread Down-slope shape: Convex Across-slope shape: Linear Hydric soil rating: No Ronda Percent of map unit:2 percent Landform: Natural levees on flood plains Landform position (three-dimensional):Tread Down-slope shape: Convex Across-slope shape: Convex Hydric soil rating: No Banister Percent of map unit:2 percent Landform: Flats on stream terraces Landform position (three-dimensional):Tread Down-slope shape: Concave Across-slope shape: Linear Hydric soil rating: No Comus Percent of map unit:2 percent Landform: Flood plains Landform position (three-dimensional):Tread Down-slope shape: Convex Across-slope shape: Linear Hydric soil rating: No Dan river Percent of map unit:2 percent Landform: Flood plains Landform position (three-dimensional):Tread Down-slope shape: Convex Across-slope shape: Linear Hydric soil rating: No 14 Custom Soil Resource Report DaA—Dan River loam, 0 to 2 percent slopes, frequently flooded Map Unit Setting National map unit symbol: 2mlzf Elevation: 200 to 1,400 feet Mean annual precipitation: 40 to 48 inches Mean annual air temperature: 50 to 59 degrees F Frost-free period: 160 to 190 days Farmland classification: Prime farmland if protected from flooding or not frequently flooded during the growing season Map Unit Composition Dan river and similar soils: 85 percent Minor components: 5 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Dan River Setting Landform: Flood plains Down-slope shape: Linear Across-slope shape: Linear Parent material: Loamy alluvium derived from igneous and metamorphic rock Typical profile Ap-0 to 18 inches: loam Bw- 18 to 46 inches: loam Cl -46 to 55 inches: sandy loam C2- 55 to 72 inches: clay loam C3- 72 to 80 inches: loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Low Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table:About 30 to 60 inches Frequency of flooding: Frequent Frequency of ponding: None Available water supply, 0 to 60 inches: High (about 10.6 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3w Hydrologic Soil Group: C Ecological site: F136XY120VA- Mesic temperature regime, flood plain forest, moist Hydric soil rating: No 15 Custom Soil Resource Report Minor Components Hatboro, undrained Percent of map unit: 5 percent Landform: Depressions on flood plains Down-slope shape: Concave Across-slope shape: Linear Hydric soil rating: Yes FaE3—Fairview clay loam, 10 to 25 percent slopes, severely eroded Map Unit Setting National map unit symbol: 2mlxr Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 50 to 59 degrees F Frost-free period: 160 to 190 days Farmland classification: Not prime farmland Map Unit Composition Fairview, severely eroded, and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Fairview, Severely Eroded Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across-slope shape: Convex Parent material: Saprolite derived from granite and gneiss and/or schist Typical profile A -0 to 3 inches: clay loam Bt-3 to 29 inches: clay BC-29 to 37 inches: clay loam Cl -37 to 52 inches: clay loam C2- 52 to 80 inches: loam Properties and qualities Slope: 10 to 25 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None 16 Custom Soil Resource Report Available water supply, 0 to 60 inches: Moderate (about 7.7 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 6e Hydrologic Soil Group: B Ecological site: F136XY320VA- Mesic temperature regime, acidic upland forest, moist Hydric soil rating: No PxF4—Poplar Forest-Udorthents complex, 25 to 45 percent slopes, gullied Map Unit Setting National map unit symbol: 2mm0j Elevation: 200 to 1,400 feet Mean annual precipitation: 40 to 48 inches Mean annual air temperature: 50 to 59 degrees F Frost-free period: 160 to 200 days Farmland classification: Not prime farmland Map Unit Composition Poplar forest, gullied, and similar soils: 50 percent Udorthents, gullied, and similar soils:40 percent Minor components: 6 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Poplar Forest, Gullied Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across-slope shape: Convex Parent material: Residuum weathered from mica schist and/or other micaceous metamorphic rock Typical profile A -0 to 6 inches: sandy clay loam Bt- 6 to 26 inches: clay BC-26 to 37 inches: clay loam C-37 to 80 inches: sandy loam Properties and qualities Slope: 25 to 45 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: High Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches 17 Custom Soil Resource Report Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 8.3 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 7e Hydrologic Soil Group: B Ecological site: F136XY320VA- Mesic temperature regime, acidic upland forest, moist Hydric soil rating: No Description of Udorthents, Gullied Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across-slope shape: Convex Parent material: Residuum weathered from mica schist and/or other micaceous metamorphic rock Typical profile C- 0 to 80 inches: sandy loam Properties and qualities Slope: 25 to 45 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Very high Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 5.95 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 7.2 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 7e Hydrologic Soil Group: A Hydric soil rating: No Minor Components Gullied land Percent of map unit: 6 percent 18 Custom Soil Resource Report TmB—Tomlin loam, 2 to 6 percent slopes Map Unit Setting National map unit symbol: 2mm26 Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 50 to 59 degrees F Frost-free period: 160 to 190 days Farmland classification: All areas are prime farmland Map Unit Composition Tomlin and similar soils: 90 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Tomlin Setting Landform: Interfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex Parent material: Saprolite derived from diorite and/or gabbro and/or diabase and/or gneiss Typical profile Ap1 - 0 to 4 inches: loam Ap2-4 to 8 inches: clay loam Bt1 -8 to 30 inches: clay Bt2-30 to 37 inches: silty clay Bt3-37 to 49 inches: silty clay loam BCt-49 to 57 inches: silt loam C- 57 to 81 inches: loam Properties and qualities Slope: 2 to 6 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Low Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Sodium adsorption ratio, maximum: 1.0 Available water supply, 0 to 60 inches: Moderate (about 8.2 inches) Interpretive groups Land capability classification (irrigated): None specified 19 Custom Soil Resource Report Land capability classification (nonirrigated): 2e Hydrologic Soil Group: B Ecological site: F136XY320VA- Mesic temperature regime, acidic upland forest, moist Hydric soil rating: No TmC—Tomlin loam, 6 to 10 percent slopes Map Unit Setting National map unit symbol: 2mm27 Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 50 to 59 degrees F Frost-free period: 160 to 190 days Farmland classification: Farmland of statewide importance Map Unit Composition Tomlin and similar soils: 90 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Tomlin Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across-slope shape: Convex Parent material: Saprolite derived from diorite and/or gabbro and/or diabase and/or gneiss Typical profile Ap1 - 0 to 4 inches: loam Ap2-4 to 8 inches: clay loam Bt1 -8 to 30 inches: clay Bt2-30 to 37 inches: silty clay Bt3-37 to 49 inches: silty clay loam BCt-49 to 57 inches: silt loam C- 57 to 81 inches: loam Properties and qualities Slope: 6 to 10 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Sodium adsorption ratio, maximum: 1.0 Available water supply, 0 to 60 inches: Moderate (about 8.2 inches) 20 Custom Soil Resource Report Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: B Ecological site: F136XY320VA- Mesic temperature regime, acidic upland forest, moist Hydric soil rating: No ToB2—Tomlin clay loam, 2 to 6 percent slopes, moderately eroded Map Unit Setting National map unit symbol: 2mm2d Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 50 to 66 degrees F Frost-free period: 160 to 240 days Farmland classification: All areas are prime farmland Map Unit Composition Tomlin, moderately eroded, and similar soils: 90 percent Minor components: 6 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Tomlin, Moderately Eroded Setting Landform: Interfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex Parent material: Saprolite derived from diorite and/or gabbro and/or diabase and/or gneiss Typical profile Ap- 0 to 10 inches: sandy clay loam Bt1 - 10 to 28 inches: clay Bt2-28 to 48 inches: clay loam CB-48 to 67 inches: loam C- 67 to 80 inches: loam Properties and qualities Slope: 2 to 6 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None 21 Custom Soil Resource Report Sodium adsorption ratio, maximum: 1.0 Available water supply, 0 to 60 inches: Moderate (about 7.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: B Ecological site: F136XY320VA- Mesic temperature regime, acidic upland forest, moist Hydric soil rating: No Minor Components Poplar forest, moderately eroded Percent of map unit: 6 percent Landform: Interfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex Hydric soil rating: No ToC2—Tomlin clay loam, 6 to 10 percent slopes, moderately eroded Map Unit Setting National map unit symbol: 2mm2f Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 50 to 66 degrees F Frost-free period: 160 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Tomlin, moderately eroded, and similar soils: 90 percent Minor components: 8 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Tomlin, Moderately Eroded Setting Landform: Hillslopes Down-slope shape: Linear Across-slope shape: Convex Parent material: Saprolite derived from diorite and/or gabbro and/or diabase and/or gneiss Typical profile Ap- 0 to 10 inches: sandy clay loam Bt1 - 10 to 28 inches: clay Bt2-28 to 48 inches: clay loam CB-48 to 67 inches: loam 22 Custom Soil Resource Report C- 67 to 80 inches: loam Properties and qualities Slope: 6 to 10 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Sodium adsorption ratio, maximum: 1.0 Available water supply, 0 to 60 inches: Moderate (about 7.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: B Ecological site: F136XY320VA- Mesic temperature regime, acidic upland forest, moist Hydric soil rating: No Minor Components Poplar forest, moderately eroded Percent of map unit: 8 percent Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across-slope shape: Convex Hydric soil rating: No 23 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nres.usda.gov/wps/portal/ nres/detail/national/soils/?cid=nres 142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www.nres.usda.gov/wps/portal/nres/detail/national/soils/?cid=nres142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www.nres.usda.gov/wps/portal/nres/detail/national/soils/?cid=nres142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nres142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nres.usda.gov/wps/portal/nres/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 24 Custom Soil Resource Report United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nres.usda.gov/wps/portal/ nres/detail/soils/scientists/?cid=nres142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nres.usda.gov/wps/portal/nres/detail/national/soils/? cid=nres142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf 25 Duke Energy I Lyle Creek Switching Station Appendices B Appendix B — Stormwater Peak Flow Calculations 11/20/23, 11:05AM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 ite$'°`° , Location name: Conover,North Carolina,USA* '',,,u'', Latitude:35.7461°,Longitude: -81.2089° € nonn Elevation:902 ft** �,i *source:ESRI Maps w **source:USGS -"'""`' POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 5-min 0.368 0.436 0.515 0.574 0.646 0.698 0.749 0.798 0.860 0.907 (0.340-0.401) (0.402-0.476) (0.473-0.562) (0.525-0.625) (0.586-0.704) (0.629-0.763) (0.669-0.822) (0.705-0.881) (0.746-0.957) (0.776-1.02) 10-min 0.588 0.698 0.824 0.917 1.03 1.11 1.19 1.26 1.36 1.43 (0.542-0.641) (0.643-0.761) (0.757-0.899)1(0.839-0.999) (0.934-1.12) (1.00-1.22) (1.06-1.31) (1.12-1.40) (1.18-1.51) (1.22-1.60) 15-min 0.735 0.877 1.04 1.16 1.30 1.41 1.50 1.60 1.71 1.79 (0.678-0.801) (0.808-0.957) (0.958-1.14) (1.06-1.26) (1.18-1.42) (1.27-1.54) (1.34-1.65) (1.41-1.76) (1.49-1.90) (1.53-2.01) 30-min 1.01 1.21 1.48 1.68 1.93 2.12 2.30 2.49 2.72 2.90 (0.930-1.10) (1.12-1.32) (1.36-1.62) (1.54-1.83) (1.75-2.11) (1.91-2.32) (2.06-2.53) (2.20-2.74) (2.36-3.03) (2.48-3.26) 60-min 1.26 1.52 1.90 2.19 2.57 2.87 3.18 3.49 3.91 4.24 (1.16-1.37) (1.40-1.66) (1.74-2.07) (2.00-2.38) (2.34-2.81) (2.59-3.14) (2.84-3.48) (3.08-3.85) (3.39-4.35) (3.62-4.75) 2-hr 1.46 1.78 2.24 2.60 3.10 3.50 3.92 4.34 4.95 5.43 (1.34-1.60) (1.63-1.94) (2.05-2.45) (2.37-2.84) (2.81-3.39)_ (3.14-3.83) (3.48-4.30) (3.81-4.80) (4.26-5.52) (4.60-6.10) 3-hr 1.57 1.90 2.40 2.80 3.36 3.81 4.29 4.79 5.51 I 6.09 (1.45-1.72) (1.75-2.09) (2.20-2.64) (2.55-3.07) (3.03-3.68) (3.42-4.19) (3.80-4.73) (4.19-5.32) (4.71-6.17) (5.13-6.89) 6-hr 1.94 2.34 2.94 3.43 4.10 4.66 5.23 5.85 6.71 7.41 (1.79-2.12) (2.16-2.56) (2.70-3.22) (3.14-3.74) (3.73-4.48) (4.20-5.09) (4.66-5.74) I (5.14-6.44) (5.79-7.46) (6.29-8.30) 12-hr 2.38 2.87 3.60 4.19 5.00 5.65 6.33 7.04 8.04 8.83 (2.20-2.59) (2.65-3.13) (3.32-3.92) (3.84-4.55) (4.55-5.43) (5.10-6.14) (5.66-6.88) (6.23-7.68) (6.99-8.80) (7.58-9.71) 24-hr 2.93 3.55 4.50 I 5.25 6.27 7.09 7.93 8.80 10.0 10.9 (2.72-3.18) (3.29-3.86) (4.16-4.89) (4.84-5.69) (5.76-6.80) (6.48-7.69) (7.22-8.61) _(7.97-9.57) (8.99-10.9) (9.80-12.0) 2-day 3.48 4.21 5.28 6.12 7.25 8.15 9.06 10.0 11.3 12.3 (3.22-3.78) (3.89-4.58) (4.88-5.74) (5.64-6.64) (6.65-7.87) (7.45-8.85) (8.26-9.85) (9.07-10.9) (10.2-12.3) (11.0-13.4) 3-day 3.70 4.46 5.57 6.43 7.59 8.51 9.44 10.4 11.7 12.7 (3.44-4.00) (4.14-4.83) (5.16-6.03) I (5.94-6.95) (6.99-8.21) (7.80-9.21) (8.63-10.2) (9.47-11.3) (10.6-12.7) (11.5-13.8) 4-day 3.93 4.72 5.86 I 6.74 7.93 8.87 9.83 10.8 12.1 13.2 (3.65-4.23) (4.39-5.09) (5.44-6.32) (6.24-7.26) (7.32-8.55) (8.16-9.57) (9.00-10.6) (9.87-11.7) (11.0-13.1) (11.9-14.3)_ 7-day 4.53 5.42 6.60 7.51 8.72 9.66 10.6 11.6 12.8 13.8 (4.23-4.85) (5.07-5.80) (6.16-7.07), (7.00-8.04) (8.10-9.34) (8.95-10.3) (9.80-11.4) (10.6-12.4) (11.8-13.8) (12.6-14.9) 10-day 5.18 6.18 7.43 8.37 9.61 10.6 11.5 12.5 13.7 14.7 (4.87-5.52) (5.81-6.58) (6.98-7.91) (7.85-8.92) (8.98-10.2) (9.85-11.3) (10.7-12.3) (11.6-13.3) (12.7-14.7) (13.5-15.7) 20-day 6.92 8.20 9.68 10.8 12.3 13.5 14.7 15.9 17.4 18.6 (6.55-7.33) (7.75-8.68) (9.14-10.2) (10.2-11.5) (11.6-13.1) (12.7-14.3) (13.7-15.6) (14.8-16.8) (16.2-18.5) (17.2-19.8) 30-day 8.57 10.1 11.6 12.7 14.2 15.2 16.3 17.3 18.6 19.6 (8.18-8.99) (9.62-10.6) (11.1-12.2) (12.2-13.4) (13.5-14.9)_ (14.5-16.0) (15.5-17.1) (16.4-18.2) (17.6-19.6) (18.5-20.7) 45-day 10.8 12.6 14.3 15.5 17.0 18.2 19.3 20.3 21.6 22.6 (10.4-11.3) (12.1-13.2) (13.7-14.9) (14.9-16.2) (16.3-17.8) (17.4-19.0) (18.4-20.1) (19.3-21.2) (20.6-22.7) (21.5-23.7) 60-day 12.9 15.0 16.8 18.2 19.9 21.1 22.3 23.5 25.0 26.1 (12.3-13.4) (14.4-15.6) (16.1-17.5) (17.4-18.9) (19.1-20.7) (20.3-22.0) (21.4-23.3) I (22.5-24.5) (23.8-26.1) (24.8-27.3) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates (for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.7461&Ion=-81.2089&data=depth&units=english&series=pds 1/4 11/20/23, 11:05AM Precipitation Frequency Data Server PDS-based depth-duration-frequency (DDF) curves Latitude: 35.7461°, Longitude: -81.2089° Average recurrence 25 • interval (years) c 20 - — 1 — 2 a — 5 v 15 - - — 10 o — 25 ro 10 - Al// — 50 a — 100 V d _..._..-.---..--.,-•••''''''''"L------9111 I 4----- a 5 - rf — 1000200 500 - r I r , c c c c c - - t- I- >, >.>, >, >, >, >, >,>, - •- •- — - -c -c .c .c -cr0 r0 ro r0 ro r0 r0 r0 r0 i N A tb ry 4 -o -a 7 7 7 7 77 u1 . 4 0, s Duration N N14'4 ^ ° N m v 25 - . c 20 - -- ' .� Duration s O. v 15 - - — 5-min — 2-day c — 10-min — 3-day a15-min — 4-day rp a 10 - �— 1� � — 30 min — 7-day w __= l — 60-min — 10-day i ____ �� — 2fir — 20 day 5 � _ — 3-hr — 30-day — 6-hr — 45-day 0 r- — — 12-hr — 60-day ' . t__, . , — 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT) Mon Nov 20 16:05 44 2023 Back to Top Maps & aerials Small scale terrain https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.7461&Ion=-81.2089&data=depth&units=english&series=pds 2/4 11/20/23, 11:05AM Precipitation Frequency Data Server WNW- 1111 __,_ -" -- - 3km 2mi Conover El P Conover 8N " - _ Claremont Large scale terrain V Kingsport• Bristol v Johnson City. 0 0 �', Winston-Sal ty • • Durh ,IF ,,�'^ I Greensboro A s s Ill r:ulch.II r •Asheville NORTH CAROLINA •Charlotte :ill 100km 60mi Large scale map _- Kingsport/,,Eristbl rip JohnsonCity • / instonS lem Greensboro O -' As I North o v Carolina arlotte f' pie J_ 100km i lT: ..r ^ 60mi Large scale aerial https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.7461&Ion=-81.2089&data=depth&units=english&series=pds 3/4 11/20/23, 11:05AM Precipitation Frequency Data Server 1 King orx_.-Bri st old_ • Johnson City • J� Winston-Salem • • Greensboro Durha Asheville • North Carolin a Charlotte g , • Greenville 100km 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions(cnoaa.gov Disclaimer https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.7461&Ion=-81.2089&data=depth&units=english&series=pds 4/4 11/20/23, 11:06 AM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 $'°F\ Location name: Conover,North Carolina,USA* '',,,u'', Latitude: • 35.7461°,Longitude: -81.2089° € nonn Elevation:902 ft** �,i *source:ESRI Maps w **source:USGS -"'""`' POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 5-min 4.42 5.23 6.18 6.89 7.75 8.38 8.99 9.58 10.3 10.9 (4.08-4.81) (4.82-5.71) (5.68-6.74) (6.30-7.50) (7.03-8.45) (7.55-9.16) (8.03-9.86) (8.46-10.6) (8.95-11.5) (9.31-12.2) 10-min 3.53 4.19 4.94 5.50 6.17 6.67 7.15 7.59 8.16 8.57 (3.25-3.85) (3.86-4.57) (4.54-5.39) (5.03-5.99) (5.60-6.73) (6.01-7.29) (6.38-7.84) (6.71-8.38) (7.09-9.08) (7.33-9.61) 15-min 2.94 3.51 4.17 4.64 5.22 5.63 6.02 6.39 6.85 7.17 (2.71-3.20) (3.23-3.83) (3.83-4.55) (4.25-5.06) (4.74-5.69) (5.08-6.15) (5.38-6.60) (5.64-7.05) (5.94-7.62) (6.13-8.04) 30-min 2.02 2.42 2.96 3.36 3.86 4.24 4.61 4.97 5.45 5.81 (1.86-2.20) (2.23-2.64) (2.72-3.23) (3.08-3.66) (3.51-4.21) (3.82-4.63) (4.12-5.06) (4.39-5.49) (4.73-6.06) (4.97-6.51) 60-min 1.26 1.52 1.90 2.19 2.57 2.87 3.18 3.49 3.91 4.24 (1.16-1.37) (1.40-1.66) (1.74-2.07) (2.00-2.38) (2.34-2.81) (2.59-3.14) (2.84-3.48) (3.08-3.85) (3.39-4.35) (3.62-4.75) 2-hr 0.732 0.888 1.12 1.30 1.55 1.75 1.96 2.17 2.47 2.71 (0.672-0.797) (0.815-0.970) (1.03-1.22) (1.19-1.42) (1.40-1.69) (1.57-1.92) (1.74-2.15) (1.90-2.40) (2.13-2.76)_ (2.30-3.05) 3-hr 0.523 0.633 0.800 0.932 1.12 1.27 1.43 1.60 1.83 2.03 (0.481-0.573) (0.582-0.694) (0.732-0.877) (0.849-1.02) (1.01-1.23) (1.14-1.40) (1.26-1.58) (1.39-1.77) (1.57-2.06) (1.71-2.29) 6-hr 0.324 0.390 0.491 0.572 0.685 0.777 0.874 0.976 1.12 1.24 (0.298-0.353) (0.360-0.427) (0.451-0.537) (0.523-0.624) (0.622-0.747) (0.700-0.850) (0.778-0.958) (0.859-1.08) (0.966-1.24) (1.05-1.38) 12-hr 0.197 0.238 0.299 0.347 0.414 0.469 0.525 0.584 0.667 0.733 (0.182-0.214) (0.219-0.259) (0.275-0.325) (0.318-0.377) (0.377-0.450) (0.423-0.509) (0.470-0.571) (0.516-0.637) (0.580-0.729) (0.628-0.805)I 24-hr 0.121 0.148 0.187 0.218 0.261 0.295 0.330 0.366 0.416 0.456 (0.113-0.132) (0.137-0.160) (0.173-0.203) (0.201-0.237) (0.239-0.283) (0.270-0.320) (0.300-0.358) (0.332-0.398) (0.374-0.454) (0.408-0.498) 2-day 0.072 0.087 0.110 0.127 r 0.151 0.169 r 0.188 r 0.208 0.234 0.255 (0.067-0.078) (0.081-0.095) (0.101-0.119) (0.117-0.138)(0.138-0.163) (0.155-0.184), (0.171-0.205) (0.188-0.226) (0.211-0.256) (0.229-0.279) 3-day 0.051 0.062 0.077 0.089 0.105 0.118 1 0.131 0.144 0.162 0.176 (0.047-0.055) (0.057-0.067) (0.071-0.083) (0.082-0.096) (0.097-0.114) (0.108-0.127) (0.119-0.142) (0.131-0.156) (0.147-0.176) (0.159-0.192) 4-day 0.040 0.049 0.061 0.070 0.082 0.092 0.102 0.112 0.126 0.137 (0.038-0.044) (0.045-0.053) (0.056-0.065) (0.064-0.075) (0.076-0.089) (0.084-0.099) (0.093-0.110) (0.102-0.121) (0.114-0.136) (0.124-0.148) 7-day 0.026 0.032 0.039 0.044 0.051 0.057 0.063 0.068 0.076 0.082 (0.025-0.028) (0.030-0.034) (0.036-0.042) (0.041-0.047) (0.048-0.055) (0.053-0.061) (0.058-0.067) (0.063-0.073) (0.070-0.082) (0.075-0.088) 10-day 0.021 0.025 0.030 0.034 0.040 0.044 0.047 0.051 0.057 0.061 (0.020-0.023) (0.024-0.027) (0.029-0.032) (0.032-0.037) (0.037-0.042) (0.041-0.046) (0.044-0.051) (0.048-0.055) (0.052-0.061) (0.056-0.065) 20-day 0.014 0.017 0.020 0.022 0.025 0.028 0.030 0.033 0.036 I 0.038 (0.013-0.015) (0.016-0.018) (0.019-0.021) (0.021-0.023) (0.024-0.027) (0.026-0.029) (0.028-0.032) (0.030-0.035) (0.033-0.038) (0.035-0.041)1 30-day 0.011 0.014 0.016 0.017 0.019 0.021 0.022 0.023 0.025 0.027 (0.011-0.012) (0.013-0.014) (0.015-0.016) (0.016-0.018) (0.018-0.020) (0.020-0.022) (0.021-0.023) (0.022-0.025) (0.024-0.027) (0.025-0.028) 45-day 0.010 0.011 0.013 0.014 0.015 0.016 0.017 0.018 0.020 0.020 (0.009-0.010) (0.011-0.012) (0.012-0.013) (0.013-0.014) (0.015-0.016) (0.016-0.017) (0.017-0.018) (0.017-0.019) (0.019-0.020) (0.019-0.021) 60-day 0.008 0.010 0.011 0.012 0.013 0.014 0.015 0.016 0.017 0.018 (0.008-0.009) (0.009-0.010) (0.011-0.012) (0.012-0.013) (0.013-0.014) (0.014-0.015) (0.014-0.016) (0.015-0.017) (0.016-0.018) (0.017-0.018) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.7461&Ion=-81.2089&data=intensity&units=english&series=pds 1/4 11/20/23, 11:06 AM Precipitation Frequency Data Server PDS-based intensity-duration-frequency (IDF) curves Latitude: 35.7461°, Longitude: -81.2089° 101 _ Average recurrence interval `__ (years) — 10a \ . . . . — 2 •c � � — 5 c \ — 10 - \:_ — 25 o � — 50 m 10-1 - \�.�� — y, 100 a \ , — 200 a \. — 500 �� — 1000 10-2 — - r 1 1 1 1 1 1 1 1 1 1 1 1 1 1 C C C C C - - I- I- I- >, >.>, >, >. >, >, >,>, •— •— •— •— •— -C -C -C -C -Cr0 r0 ra r0 N r0 r0 r0 r0 E Ei N A tb ry -o -a73 7 7 7 7 77 u1 P 4 m $ Duration r" N '41 4 r P N m v 8 101 L - c _ __ - Duration 4' 10u - c — 5-min — 2-day a r — 10-min — 3-day c 15-min — 4-day 10-1 - — 30-min — 7-day ru ii — 60-min — 10-day — 2-hr — 20-day a` — 3-hr — 30-day — 6-hr — 45-day 10-2 - — 12-hr — 60-day i i i r i i - — 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Mon Nov 20 16:06:21 2023 Back to Top Maps & aerials Small scale terrain https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.7461&Ion=-81.2089&data=intensity&units=english&series=pds 2/4 11/20/23, 11:06 AM Precipitation Frequency Data Server 111111.- 1111__,_ Lei , - ____ -rc- Il 3km Claremont 2mi ,Conover Large scale terrain • King sport• Bristol Johnson City. 0 0 ", Winston-Salem • • Dull). ^'' Greensboro 5' s Ill Mitchell t\ 00 \ •Asheville NORTH CAROLINA 'r •Charlotte vill — 100km r60mi . ._. . Large scale map —_ Kingsport/�Eri`t'-'l rip Johnson City • / instonS lem Greensboro 0 \ Asheville North v v Carolina arlotte fpie 100km II fir 1 fi lT: 0mi Large scale aerial https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.7461&Ion=-81.2089&data=intensity&units=english&series=pds 3/4 11/20/23, 11:06 AM Precipitation Frequency Data Server 1 King orx_.-Bri st old_ • Johnson City • J� Winston-Salem • • Greensboro Durha Asheville • North Carolin a Charlotte g , • Greenville 100km 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions(cnoaa.gov Disclaimer https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.7461&Ion=-81.2089&data=intensity&units=english&series=pds 4/4 I-3 Composite SCS Curve Number PROJECT: Lyle Creek DATE: 1/25/2024 SCENARIO: Existing Conditions PREPARED BY: MDB Drainage Area: Pre-DA Total Drainage Area: '" - Hydrologic Soil Group A B C D Area Area Area Area Cover Description (Ac) CN (Ac) CN (Ac) CN (Ac) CN Open space(lawns, parks, golf courses, cemeteries,etc.): IM Poor condition (grass cover<50%) 68 79 86 89 Fair condition (grass cover 50%to 75%) 49 69 79 84 Good condition (grass cover>75%) 39 61 74 80 Impervious areas: Paved parking lots, roofs,driveways, etc. (excluding R/W) 98 98 98 98 Paved streets and roads; curbs and storm sewers(excluding 98 98 98 98 right-of-way) Paved streets and roads; open ditches(including RAN) 83 89 92 93 Gravel streets and roads(including R/W) _ 76 85 89 91 Dirt streets and roads(including R/W) 72 0.37 82 87 1 89 Western desert urban areas: V Natural desert landscaping (pervious areas only) 63 77 85 88 Artificial desert landscaping (impervious weed barrier, desert 96 96 96 96 shrub with 1-to 2-inch sand or gravel mulch and basin Urban districts: Commercial and business 89 92 94 95 Industrial 81 88 91 93 Residential districts by average lot size: 111, 1/8 acre or less(town houses) 77 85 90 92 1/4 acre 61 75 83 87 1/3 acre 57 72 81 86 1/2 acre 54 70 80 85 1 acre 51 68 79 84 2 acres I 46 I 65 I 77 I 82 Pasture,grassland or range: Poor hydrologic condition 68 79 86 89 Fair hydrologic condition 49 5.02 69 0.19 79 84 Good hydrologic condition 39 I 61 I 74 I 80 Woods: Poor hydrologic condition 45 66 77 83 Fair hydrologic condition 36 6.96 60 73 79 Good hydrologic condition I 30 I 55 I 70 I 77 Developing urban areas: Newly graded areas(pervious areas only, no vegetation) 86 91 94 Substation Pad with 6"of Loose Washed Stone 69 79 84 Total HSG Areas: I 12.35 I! 0.19 Calculated Total Drainage Area: 12.54 Ac Calculated Composite Curve Number: 65 FD1 Composite SCS Curve Number PROJECT: Lyle Creek DATE: 8/16/2024 SCENARIO: Offsite DA- DA5 PREPARED BY: MDB Drainage Area: II. Total Drainage Area: d AA Ac Hydrologic Soil Group A B C D Area Area Area Area Cover Description (Ac) CN (Ac) CN (Ac) CN (Ac) CN Open space(lawns, parks,golf courses,cemeteries,etc.): Poor condition (grass cover<50%) 89 Fair condition (grass cover 50%to 75%) 69 7. 84 Good condition (grass cover>75%) 39 .... 61 0.19 7z 80 Impervious areas: 1-1 _ Paved parking lots, roofs,driveways, etc. (excluding R/W) 98 98 98 98 Paved streets and roads; curbs and storm sewers(excluding 98 98 98 98 Paved streets and roads; open ditches(including R/W) 83 89 92 93 Gravel streets and roads(including R/W) 76 0.06 85 89 91 Dirt streets and roads(including R/W) 72 82 87 1, 89 Western desert urban areas: Natural desert landscaping (pervious areas only) 63 77 85 88 Artificial desert landscaping (impervious weed barrier, desert 96 96 96 96 Urban districts: Commercial and business 89 92 94 95 Industrial 81 88 91 93 Residential districts by average lot size: 1/8 acre or less(town houses) 77 85 90 92 1/4 acre 61 75 83 87 1/3 acre 57 72 81 86 1/2 acre 54 70 80 85 1 acre 51 68 79 84 2 acres 46 I 65 I 77 82 Pasture,grassland or range: gni Poor hydrologic condition 68 79 86 89 Fair hydrologic condition 49 69 79 84 Good hydrologic condition 39 61 74 80 Woods: Poor hydrologic condition 45 66 77 83 Fair hydrologic condition 36 1.34 60 73 79 Good hydrologic condition 30 55 70 77 Developing urban areas: Newly graded areas(pervious areas only, no vegetation) 77 86 91 94 Substation Pad with 6"of Loose Washed Stone 49 _ 69 79 84 Total HSG Areas: 4.27 0.19 IM Calculated Total Drainage Area: 4.46 Ac Calculated Composite Curve Number: 62 I-D Composite SCS Curve Number PROJECT: Lyle Creek DATE: 8/16/2024 SCENARIO: Proposed Conditions PREPARED BY: MDB Drainage Area: Culvert 1/West Ditch Total Drainage Area: 3.19 Ac Hydrologic Soil Group A B C D Area Area Area Area Cover Description (Ac) CN (Ac) CN (Ac) CN (Ac) CN Open space(lawns, parks,golf courses,cemeteries,etc.): Poor condition (grass cover<50%) 89 Fair condition (grass cover 50%to 75%) 84 Good condition (grass cover>75%) ., / 80 Impervious areas: _ - Paved parking lots, roofs,driveways, etc. (excluding R/W) 98 98 98 98 Paved streets and roads; curbs and storm sewers(excluding 98 98 98 98 Paved streets and roads; open ditches(including R/W) 83 89 92 93 Gravel streets and roads(including R/W) 76 0.07 85 89 91 Dirt streets and roads(including R/W) 72 82 87 89 Western desert urban areas: Natural desert landscaping(pervious areas only) 63 77 85 88 Artificial desert landscaping (impervious weed barrier, desert 96 96 96 96 Urban districts: Commercial and business 89 92 94 95 Industrial 81 88 91 93 Residential districts by average lot size: ANIL 1/8 acre or less(town houses) 77 85 90 92 1/4 acre 61 75 83 87 1/3 acre 57 72 81 86 1/2 acre 54 70 80 85 1 acre 51 68 79 84 2 acres 46 65 77 82 Pasture,grassland or range: 1.11 Poor hydrologic condition 68 79 86 89 Fair hydrologic condition 49 0.70 69 79 84 Good hydrologic condition 39 61 74 I 80 Woods: Poor hydrologic condition 45 66 77 83 Fair hydrologic condition 36 0.62 60 73 79 Good hydrologic condition 30 55 701. I 77 Developing urban areas: Newly graded areas(pervious areas only, no vegetation) 77 86 91 94 Substation Pad with 6"of Loose Washed Stone 49 - 0.82 69 79 84 Total HSG Areas: 3.19 Calculated Total Drainage Area: 3.19 Ac Calculated Composite Curve Number: 66 Composite SCS I-D Curve Number PROJECT: Lyle Creek DATE: 8/16/2024 SCENARIO: Proposed Conditions PREPARED BY: MDB Drainage Area: East Ditch Total Drainage Area: 3.26 Ac Hydrologic Soil Group A B C D Area Area Area Area Cover Description (Ac) CN (Ac) CN (Ac) CN (Ac) CN Open space(lawns, parks,golf courses,cemeteries,etc.): Poor condition (grass cover<50%) 89 Fair condition (grass cover 50%to 75%) 69 84 Good condition (grass cover>75%) 39 ..... 61 / — 80 Impervious areas: Paved parking lots, roofs,driveways, etc. (excluding R/W) 98 T 98 98 98 Paved streets and roads; curbs and storm sewers(excluding 98 98 98 98 Paved streets and roads; open ditches(including R/W) 83 89 92 93 Gravel streets and roads(including R/W) 76 85 89 91 Dirt streets and roads(including R/W) 72 82 87 89 Western desert urban areas: Natural desert landscaping (pervious areas only) 63 77 85 88 Artificial desert landscaping (impervious weed barrier, desert 96 96 96 96 Urban districts: Commercial and business 89 92 94 95 Industrial 81 88 91 93 Residential districts by average lot size: 1/8 acre or less(town houses) 77 85 90 92 1/4 acre 61 75 83 87 1/3 acre 57 72 81 86 1/2 acre 54 70 80 85 1 acre 51 68 79 84 2 acres 46 I 65 I 77 I 82 Pasture,grassland or range: — Poor hydrologic condition 68 79 86 89 Fair hydrologic condition 49 69 79 84 Good hydrologic condition 39 61 74 80 Woods: illMili Poor hydrologic condition 45 66 77 83 Fair hydrologic condition 36 0.98 60 73 79 Good hydrologic condition 30 55 70 77 Developing urban areas: Newly graded areas(pervious areas only, no vegetation) 77 86 91 94 Substation Pad with 6"of Loose Washed Stone 49 1.42 69 79 84 Total HSG Areas: Iold 3.26 IMP — I — IM Calculated Total Drainage Area: 3.26 Ac Calculated Composite Curve Number: 65 FD1 Composite SCS Curve Number PROJECT: Lyle Creek DATE: 8/16/2024 SCENARIO: Offsite-DA2(To BMP during Construction) PREPARED BY: MDB Drainage Area: Total Drainage Area: 1 F� Ac Hydrologic Soil Group A B C D Area Area Area Area Cover Description (Ac) CN (Ac) CN (Ac) CN (Ac) CN Open space(lawns, parks,golf courses,cemeteries,etc.): Poor condition (grass cover<50%) 89 Fair condition (grass cover 50%to 75%) 69 84 Good condition (grass cover>75%) 39 — .... 61 / — 80 Impervious areas: Paved parking lots, roofs,driveways, etc. (excluding R/W) 98 98 98 98 Paved streets and roads; curbs and storm sewers(excluding 98 98 98 98 Paved streets and roads; open ditches(including R/W) 83 89 92 93 Gravel streets and roads(including R/W) 76 85 89 91 Dirt streets and roads(including R/W) 72 82 87 imp89 Western desert urban areas: Natural desert landscaping(pervious areas only) 63 77 85 88 Artificial desert landscaping (impervious weed barrier, desert 96 96 96 96 Urban districts: Commercial and business 89 92 94 95 Industrial 81 88 91 93 Residential districts by average lot size: 1/8 acre or less(town houses) 77 85 90 92 1/4 acre 61 75 83 87 1/3 acre 57 72 81 86 1/2 acre 54 70 80 85 1 acre 51 68 79 84 2 acres 46 I 65 I 77 82 Pasture,grassland or range: gni Poor hydrologic condition 68 79 86 89 Fair hydrologic condition 49 69 79 84 Good hydrologic condition 39 61 74 80 Woods: Poor hydrologic condition 45 66 77 83 Fair hydrologic condition 36 60 73 79 Good hydrologic condition 30 55 70 77 Developing urban areas: Newly graded areas(pervious areas only, no vegetation) 77 86 91 94 Substation Pad with 6"of Loose Washed Stone 49 0.44 69 79 84_ Total HSG Areas: I 1.63 I IM Calculated Total Drainage Area: 1.63 Ac Calculated Composite Curve Number: 64 I-D Composite SCS Curve Number PROJECT: Lyle Creek DATE: 3/22/2024 SCENARIO: Post Sediment Basin PREPARED BY: MDB Drainage Area: Post Sediment Basin Total Drainage Area: 21.80 Ac Hydrologic Soil Group A B C D Area Area Area Area Cover Description (Ac) CN (Ac) CN (Ac) CN (Ac) CN Open space(lawns, parks, golf courses, cemeteries,etc.): IM Poor condition (grass cover<50%) 68 79 86 89 Fair condition (grass cover 50%to 75%) 49 69 79 84 Good condition (grass cover>75%) 39 61 74 80 Impervious areas: Paved parking lots, roofs,driveways, etc. (excluding R/W) 98 98 98 98 Paved streets and roads; curbs and storm sewers(excluding 98 98 98 98 right-of-way) Paved streets and roads; open ditches(including RAN) 83 89 92 93 Gravel streets and roads(including R/W) _ 76 85 89 91 Dirt streets and roads(including R/W) 72 0.20 82 87 1 89 Western desert urban areas: V Natural desert landscaping (pervious areas only) 63 77 85 88 Artificial desert landscaping (impervious weed barrier, desert 96 96 96 96 shrub with 1-to 2-inch sand or gravel mulch and basin Urban districts: Commercial and business 89 92 94 95 Industrial 81 88 91 93 Residential districts by average lot size: 111, 1/8 acre or less(town houses) 77 85 90 92 1/4 acre 61 75 83 87 1/3 acre 57 72 81 86 1/2 acre 54 70 80 85 1 acre 51 68 79 84 2 acres I 46 I 65 I 77 82 Pasture,grassland or range: 11. Poor hydrologic condition 68 79 86 89 Fair hydrologic condition 49 8.12 69 79 84 Good hydrologic condition 39 61 I 74 I 80 Woods: Poor hydrologic condition 45 66 77 83 Fair hydrologic condition 36 6.49 60 73 79 Good hydrologic condition I 30 I 55 I 70 I 77 Developing urban areas: Newly graded areas(pervious areas only, no vegetation) 77 4.24 86 91 94 Substation Pad with 6"of Loose Washed Stone 49 2.75 69 79 84 Total HSG Areas: I 21.80 I! Calculated Total Drainage Area: 21.80 Ac Calculated Composite Curve Number: 70 I-3 Composite SCS Curve Number PROJECT: Lyle Creek DATE: 3/13/2024 SCENARIO: Post-DA PREPARED BY: PP Drainage Area: Road Side Ditch Total Drainage Area: '.56 Ac Hydrologic Soil Group A B C D Area Area Area Area Cover Description (Ac) CN (Ac) CN (Ac) CN (Ac) CN Open space(lawns, parks, golf courses, cemeteries,etc.): IM Poor condition (grass cover<50%) 68 79 86 89 Fair condition (grass cover 50%to 75%) 49 69 79 84 Good condition (grass cover>75%) 39 61 74 80 Impervious areas: Paved parking lots, roofs,driveways, etc. (excluding R/W) 98 0.35 98 98 98 Paved streets and roads; curbs and storm sewers(excluding 98 98 98 98 right-of-way) Paved streets and roads; open ditches(including RAN) 83 89 92 93 Gravel streets and roads(including R/W) _ 76 85 89 91 Dirt streets and roads(including R/W) 72 0.12 82 87 1 89 Western desert urban areas: V Natural desert landscaping (pervious areas only) 63 77 85 88 Artificial desert landscaping (impervious weed barrier, desert 96 96 96 96 shrub with 1-to 2-inch sand or gravel mulch and basin Urban districts: Commercial and business 89 92 94 95 Industrial 81 88 91 93 Residential districts by average lot size: 111, 1/8 acre or less(town houses) 77 85 90 92 1/4 acre 61 75 83 87 1/3 acre 57 72 81 86 1/2 acre 54 70 80 85 1 acre 51 68 79 84 2 acres I 46 I 65 I 77 82 Pasture,grassland or range: 111. Poor hydrologic condition 68 79 86 89 Fair hydrologic condition 49 4.57 69 79 84 Good hydrologic condition 39 61 I 74 I 80 Woods: t Poor hydrologic condition 45 66 77 83 Fair hydrologic condition 36 2.52 60 73 79 Good hydrologic condition I 30 I 55 I 70 I 77 Developing urban areas: IIMIMIMI Newly graded areas(pervious areas only, no vegetation) 77 ` 86 91 94 Substation Pad with 6"of Loose Washed Stone 49 69 79 84 Total HSG Areas: I 7.56 IIIIIIr Calculated Total Drainage Area: 7.56 Ac Calculated Composite Curve Number: 68 1/25/2024 Time of Concentration Worksheet F3R PROJECT: Lyle Creek _ DATE: 01/25/24 SCENARIO: Erosion and Sediment Control PREPARED BY: MDB - Drainage Area Infor Drainage Area Tc Summary Data - DRAINAGE AREA ID: Basin Pre _ Flow Type Length(ft) Elev.Diff. Tc TOTAL BASIN LENGTH: 988.0 ft Sheet Flow 100.0 10.00 10.9 mins. TOTAL ELEVATION UP: 970.00 Shallow Concentrated Flow 888.0 68.00 13.9 mins. TOTAL ELEVATION DOWN: 892.00 Channel Flow-Rectangular - 0.0 0.00 0.0 mins. TOTAL ACRES: 7.92 _ Channel Flow-Triangular 0.0 0.00 0.0 mins. Channel Flow-Trapezoidal 0.0 0.00 0.0 mins. Channel Flow-Circular 0.0 0.00 0.0 mins. NOTES: Basin Totals 988.0 78.00 24.8 mins. 1. SHEET FLOW = 2. SHALLOW CONCENTRATED FLOW Segment#1 Segment#2 Segment#3 Surface Description Woods I Segment#1 Segment#2 Segment#3 Manning's"n" 0.40 Surface Description Forest Grassed I 2-Year,24-Hr.Rain Fall(In) 3.42 Flow Length(ft) 515.0 ft 373.0 ft Flow Length(ft) 100.0 ft Elevation Up(ft) 960.00 922.00 Elevation Up(ft) 970.00 Elevation Down(ft) 922.00 892.00 Elevation Down(ft) 960.00 Watercourse Slope(ft/ft) 0.074 0.080 Land Slope(ft/ft) 0.100 Average Velocity(ft/Sec) 0.7 4.6 Time Of Concentration(Mins) 10.91 Time Of Concentration(Mins) 12.56 1.36 Total Sheet Flow Tc(Minutes): 10.9 min. Total Shallow Concentrated Tc(Mins): 13.9 min. c:\pwworking\east01\d3569490\ Lyle Creek-Sediment Basin+PRE TOC.xlsm 90%Basin Pre I of 3 1/25/2024 Time of Concentration Worksheet F3R PROJECT: Lyle Creek _ DATE: 01/25/24 SCENARIO: Erosion and Sediment Control PREPARED BY: MDB 3. CHANNEL FLOW-RECTANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Rectangular Channel Tc(Mins): 0.0 mins. 4. CHANNEL FLOW-TRIANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Top Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Triangular Channel Tc 0.0 min. c:\pwworking\east01\d 3569490\ Lyle Creek-Sediment Basin+PRE TOC.xlsm 90%Basin Pre 2 of3 1/25/2024 Time of Concentration Worksheet F3R PROJECT: Lyle Creek DATE: 01/25/24 SCENARIO: Erosion and Sediment Control PREPARED BY: MDB 5. CHANNEL FLOW-TRAPEZOIDAL CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Side Slopes(?H:1V)(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Trapezoidal Channel Tc 0.0 min. 6. CHANNEL FLOW-CIRCULAR CHANNEL(Gravity Flow) Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Pipe Diameter(In) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Circular Channel Tc(Mins): 0.0 min. 7.Total Basin Time of Concentration (Mintues) Total Basin Tc (Mins): 24.8 min. c:\pwworking\east01\d 3569490\ Lyle Creek-Sediment Basin+PRE TOC.xlsm 90%Basin Pre 3 of i 1/25/2024 Time of Concentration Worksheet F3R PROJECT: Lyle Creek _ DATE: 01/25/24 SCENARIO: Erosion and Sediment Control PREPARED BY: MDB - Drainage Area Info Drainage Area Tc Summary Data DRAINAGE AREA ID: Pre-DA _ Flow Type Length(ft) Elev.Diff. Tc TOTAL BASIN LENGTH: 1154.0 ft Sheet Flow 100.0 7.00 22.9 mins. TOTAL ELEVATION UP: 970.00 Shallow Concentrated Flow 1054.0 81.00 14.3 mins. TOTAL ELEVATION DOWN: 882.00 Channel Flow-Rectangular - 0.0 0.00 0.0 mins. TOTAL ACRES: 12.33 _ Channel Flow-Triangular 0.0 0.00 0.0 mins. Channel Flow-Trapezoidal 0.0 0.00 0.0 mins. Channel Flow-Circular 0.0 0.00 0.0 mins. NOTES: Basin Totals 1154.0 88.00 37.3 mins. 1. SHEET FLOW = 2. SHALLOW CONCENTRATED FLOW Segment#1 Segment#2 Segment#3 Surface Description Woods I Segment#1 Segment#2 Segment#3 Manning's"n" 0.80 Surface Description Forest Grassed I 2-Year,24-Hr.Rain Fall(In) 3.12 Flow Length(ft) 552.0 ft 502.0 ft Flow Length(ft) 100.0 ft Elevation Up(ft) 963.00 914.00 Elevation Up(ft) 970.00 Elevation Down(ft) 914.00 882.00 Elevation Down(ft) 963.00 Watercourse Slope(ft/ft) 0.089 0.064 Land Slope(ft/ft) 0.070 Average Velocity(ft/Sec) 0.7 4.1 Time Of Concentration(Mins) 22.94 Time Of Concentration(Mins) 12.27 2.05 Total Sheet Flow Tc(Minutes): 22.9 min. Total Shallow Concentrated Tc(Mins): 14.3 min. c:\pwworking\east01\d3569490\ Lyle Creek-Sediment Basin+PRE TOC.xlsm PRE-DA I of 3 1/25/2024 Time of Concentration Worksheet F3R PROJECT: Lyle Creek _ DATE: 01/25/24 SCENARIO: Erosion and Sediment Control PREPARED BY: MDB 3. CHANNEL FLOW-RECTANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Rectangular Channel Tc(Mins): 0.0 mins. 4. CHANNEL FLOW-TRIANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Top Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Triangular Channel Tc 0.0 min. c:\pwworking\east01\d 3569490\ Lyle Creek-Sediment Basin+PRE TOC.xlsm PRE-DA 2 of 3 1/25/2024 Time of Concentration Worksheet F3R PROJECT: Lyle Creek DATE: 01/25/24 SCENARIO: Erosion and Sediment Control PREPARED BY: MDB 5. CHANNEL FLOW-TRAPEZOIDAL CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Side Slopes(?H:1V)(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Trapezoidal Channel Tc 0.0 min. 6. CHANNEL FLOW-CIRCULAR CHANNEL(Gravity Flow) Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Pipe Diameter(In) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Circular Channel Tc(Mins): 0.0 min. 7.Total Basin Time of Concentration (Mintues) Total Basin Tc (Mins): 37.3 min. c:\pwworking\east01\d 3569490\ Lyle Creek-Sediment Basin+PRE TOC.xlsm PRE-DA 3 013 3/22/2024 Time of Concentration Worksheet F3R PROJECT: Lyle Creek _ DATE: 03/22/24 SCENARIO: Erosion and Sediment Control PREPARED BY: MDB - Drainage Area Information Drainage Area Tc Summary Data M DRAINAGE AREA ID: Basin Post _ Flow Type Length(ft) Elev.Diff. Tc TOTAL BASIN LENGTH: 1515.0 ft Sheet Flow 100.0 3.50 16.6 mins. TOTAL ELEVATION UP: 988.00 Shallow Concentrated Flow 884.0 55.50 15.8 mins. TOTAL ELEVATION DOWN: 885.00 Channel Flow-Rectangular - 0.0 0.00 0.0 mins. TOTAL ACRES: 21.80 _ Channel Flow-Triangular 0.0 0.00 0.0 mins. Channel Flow-Trapezoidal 456.0 43.58 0.4 mins. Channel Flow-Circular 75.0 0.42 0.2 mins. NOTES: Basin Totals 1515.0 103.00 33.0 mins. 1. SHEET FLOW 2. SHALLOW CONCENTRATED FLOW Segment#1 Segment#2 Segment#3 Surface Description I Bare Earth Segment#1 Segment#2 Segment#3 Manning's"n" 0.40 Surface Description Bare Earth Forest Grassed 2-Year,24-Hr.Rain Fall(In) 3.42 Flow Length(ft) 222.0 ft 564.0 ft 98.0 ft Flow Length(ft) 100.0 ft Elevation Up(ft) 984.50 973.00 936.00 Elevation Up(ft) 988.00 Elevation Down(ft) 973.00 936.00 929.00 Elevation Down(ft) 984.50 Watercourse Slope(ft/ft) 0.052 0.066 0.071 Land Slope(ft/ft) 0.035 Average Velocity(ft/Sec) 4.6 0.6 4.3 I Time Of Concentration(Mins) 16.61 Time Of Concentration(Mins) 0.80 14.59 0.38 Total Sheet Flow Tc(Minutes): 16.6 min. Total Shallow Concentrated Tc(Mins): 15.8 min. c:\pwworking\east01\d3569490\ Lyle Creek-Sediment Basin+PRE TOC.xlsm Basin Post_NEW I of 3 3/22/2024 Time of Concentration Worksheet F3R PROJECT: Lyle Creek _ DATE: 03/22/24 SCENARIO: Erosion and Sediment Control PREPARED BY: MDB 3. CHANNEL FLOW-RECTANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Rectangular Channel Tc(Mins): 0.0 mins. 4. CHANNEL FLOW-TRIANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Top Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Triangular Channel Tc 0.0 min. c:\pwworking\east01\d 3569490\ Lyle Creek-Sediment Basin+PRE TOC.xlsm Basin Post_NEW 2 of 3 3/22/2024 Time of Concentration Worksheet F3R PROJECT: Lyle Creek DATE: 03/22/24 SCENARIO: Erosion and Sediment Control PREPARED BY: MDB 5. CHANNEL FLOW-TRAPEZOIDAL CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Grass Grass Bottom Width(ft) 2.0 2.0 Depth(ft) 2.0 2.0 Side Slopes(?H:1V)(ft) 3.0 3.0 Area(Sq.ft) 16.0 16.0 Wetted Perimeter(ft) 14.6 14.6 Hydraulic Radius(ft) 1.1 1.1 Flow Length(ft) 183.0 273.0 Elevation Up(ft) 929.00 914.25 Elevation Down(ft) 914.67 885.00 Channel Slope(ft/ft) 0.078 0.107 Manning's"n" 0.025 0.025 Average Velocity(ft/Sec) 17.7 20.7 Time Of Concentration(Mins) 0.17 0.22 Total Trapezoidal Channel Tc 0.4 min. 6. CHANNEL FLOW-CIRCULAR CHANNEL(Gravity Flow) Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description RCP Pipe Diameter(In) 24 in. Area(Sq.ft) 3.1 Wetted Perimeter(ft) 6.3 Hydraulic Radius(ft) 0.5 Flow Length(ft) 75.0 Elevation Up(ft) 914.67 Elevation Down(ft) 914.25 Channel Slope(ft/ft) 0.006 Manning's"n" 0.013 Average Velocity(ft/Sec) 5.4 Time Of Concentration(Mins) 0.23 Total Circular Channel Tc(Mins): 0.2 min. 7.Total Basin Time of Concentration (Mintues) Total Basin Tc (Mins): 33.0 min. c:\pwworking\east0l\d 3569490\ Lyle Creek-Sediment Basin+PRE TOC.xlsm Basin Post_N EW 3 of 3/18/2024 Time of Concentration Worksheet I-3 PROJECT: Lyle Creek _ DATE: 03/13/24 SCENARIO: Erosion and Sediment Control PREPARED BY: PP Drainage Area Information Drainage Area Tc Summary Data DRAINAGE AREA ID: 6DA-Post/Access Rd Ditch Flow Type Length(ft) Elev.Diff. Tc TOTAL BASIN LENGTH: 883.0 ft Sheet Flow 100.0 2.00 20.8 mins. TOTAL ELEVATION UP: 981.00 Shallow Concentrated Flow 783.0 50.00 6.0 mins. TOTAL ELEVATION DOWN: 929.00 Channel Flow-Rectangular - 0.0 0.00 0.0 mins. TOTAL ACRES: 7.56 Channel Flow-Triangular 0.0 0.00 0.0 mins. Channel Flow-Trapezoidal 0.0 0.00 0.0 mins. Channel Flow-Circular 0.0 0.00 0.0 mins. NOTES: Basin Totals 883.0 52.00 26.8 mins. 1. SHEET FLOW 2. SHALLOW CONCENTRATED FLOW Segment#1 _ Segment#2 Segment#3 Surface Description Bare Earth Segment#1 Segment#2 Segment#3 Manning's"n" 0.40 Surface Description Bare Earth Forest Grassed 2-Year,24-Hr.Rain Fall(In) 3.42 Flow Length(ft) 493.0 ft 192.0 ft 98.0 ft Flow Length(ft) 100.0 ft Elevation Up(ft) 979.00 960.00 936.00 Elevation Up(ft) 981.00 Elevation Down(ft) 960.00 936.00 929.00 Elevation Down(ft) 979.00 Watercourse Slope(ft/ft) 0.039 0.125 0.071 Land Slope(ft/ft) 0.020 Average Velocity(ft/Sec) 4.0 _ 0.9 4.3 I Time Of Concentration(Mins) 20.77 Time Of Concentration(Mins) 2.06 3.60 0.38 Total Sheet Flow Tc(Minutes): 20.8 min. Total Shallow Concentrated Tc(Mins): 6.0 min. c:\pwworking\east01\d3569490\ Lyle Creek-Sediment Basin+PRE TOC West Culvert I of3 3/18/2024 Time of Concentration Worksheet F3R PROJECT: Lyle Creek _ DATE: 03/13/24 SCENARIO: Erosion and Sediment Control PREPARED BY: PP 3. CHANNEL FLOW-RECTANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Rectangular Channel Tc(Mins): 0.0 mins. 4. CHANNEL FLOW-TRIANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Top Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Triangular Channel Tc 0.0 min. c:\pwworking\east01\d 3569490\ Lyle Creek-Sediment Basin+PRE TOC West Culvert 2 of3 3/18/2024 Time of Concentration Worksheet F3R PROJECT: Lyle Creek DATE: 03/13/24 SCENARIO: Erosion and Sediment Control PREPARED BY: PP 5. CHANNEL FLOW-TRAPEZOIDAL CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Side Slopes(?H:1V)(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Trapezoidal Channel Tc 0.0 min. 6. CHANNEL FLOW-CIRCULAR CHANNEL(Gravity Flow) Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Pipe Diameter(In) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Circular Channel Tc(Mins): 0.0 min. 7.Total Basin Time of Concentration (Mintues) Total Basin Tc (Mins): 26.8 min. c:\pwworking\east01\d 3569490\ Lyle Creek-Sediment Basin+PRE TOC West Culvert 3 of 3 8/16/2024 Time of Concentration Worksheet F3R PROJECT: Lyle Creek DATE: 08/16/24 - SCENARIO: Erosion and Sediment Control PREPARED BY: PP - Drainage Area Information Drainage Area Tc Summary Data DRAINAGE AREA ID: 2DA-Post/Rabbit Crossing Flow Type Length(ft) Elev.Diff. Tc TOTAL BASIN LENGTH: 527.0 ft Sheet Flow 100.0 4.00 15.7 mins. TOTAL ELEVATION UP: 980.00 Shallow Concentrated Flow 427.0 25.40 7.6 mins. TOTAL ELEVATION DOWN: 950.60 Channel Flow-Rectangular 0.0 0.00 0.0 mins. TOTAL ACRES: 2.44 Channel Flow-Triangular 0.0 0.00 0.0 mins. Channel Flow-Trapezoidal 0.0 0.00 0.0 mins. Channel Flow-Circular 0.0 0.00 0.0 mins. NOTES: Basin Totals 527.0 29.40 23.3 mins. 1. SHEET FLOW 2. SHALLOW CONCENTRATED FLOW Segment#1 _ Segment#2 Segment#3 Surface Description Asphalt Segment#1 Segment#2 Segment#3 Manning's"n" 0.40 Surface Description Forest Grassed Grassed 2-Year,24-Hr.Rain Fall(In) 3.42 Flow Length(ft) 234.0 ft 98.0 ft 95.0 ft Flow Length(ft) 100.0 ft Elevation Up(ft) 976.00 964.00 958.00 Elevation Up(ft) 980.00 Elevation Down(ft) 964.00 958.00 950.60 Elevation Down(ft) 976.00 Watercourse Slope(ft/ft) 0.051 0.061 0.078 Land Slope(ft/ft) 0.040 Average Velocity(ft/Sec) 0.6 4.0 4.5 I Time Of Concentration(Mins) 15.74 Time Of Concentration(Mins) 6.84 0.41 0.35 Total Sheet Flow Tc(Minutes): 15.7 min. Total Shallow Concentrated Tc(Mins): 7.6 min. c:\pwworking\east01\d3569490\ Lyle Creek-Sediment Basin+PRE TOC Rabbit Crossing Rd Culvert I of 12 8/16/2024 Time of Concentration Worksheet F3R PROJECT: Lyle Creek _ DATE: 08/16/24 SCENARIO: Erosion and Sediment Control PREPARED BY: PP 3. CHANNEL FLOW-RECTANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Rectangular Channel Tc(Mins): 0.0 mins. 4. CHANNEL FLOW-TRIANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Top Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Triangular Channel Tc 0.0 min. c:\pwworking\east01\d 3569490\ Lyle Creek-Sediment Basin+PRE TOC Rabbit Crossing Rd Culvert 2 of 2 8/16/2024 Time of Concentration Worksheet F3R PROJECT: Lyle Creek DATE: 08/16/24 SCENARIO: Erosion and Sediment Control PREPARED BY: PP 5. CHANNEL FLOW-TRAPEZOIDAL CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Side Slopes(?H:1V)(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Trapezoidal Channel Tc 0.0 min. 6. CHANNEL FLOW-CIRCULAR CHANNEL(Gravity Flow) Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Pipe Diameter(In) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Circular Channel Tc(Mins): 0.0 min. 7.Total Basin Time of Concentration (Mintues) Total Basin Tc (Mins): 23.3 min. c:\pwworking\east01\d 3569490\ Lyle Creek-Sediment Basin+PRE TOC Rabbit Crossing Rd Culvert 3 of 13 8/16/2024 Time of Concentration Worksheet F3R PROJECT: Lyle Creek - DATE: 08/16/24 SCENARIO: Erosion and Sediment Control PREPARED BY: PP Drainage Area Info Drainage Area Tc Summary Data DRAINAGE AREA ID: 1 DA-Post/Stafford Rd Culvert Flow Type Length(ft) Elev.Diff. Tc TOTAL BASIN LENGTH: 498.5 ft Sheet Flow 100.0 2.00 20.8 mins. TOTAL ELEVATION UP: 982.00 Shallow Concentrated Flow 253.5 9.64 8.5 mins. TOTAL ELEVATION DOWN: 956.35 Channel Flow-Rectangular - 0.0 0.00 0.0 mins. TOTAL ACRES: 1.50 Channel Flow-Triangular 0.0 0.00 0.0 mins. Channel Flow-Trapezoidal 145.0 14.01 0.1 mins. Channel Flow-Circular 0.0 0.00 0.0 mins. NOTES: Basin Totals 498.5 25.65 29.4 mins. 1. SHEET FLOW = 2. SHALLOW CONCENTRATED FLOW Segment#1 Segment#2 Segment#3 Surface Description Asphalt I Segment#1 Segment#2 Segment#3 Manning's"n" 0.40 Surface Description Paved Grassed Forest I 2-Year,24-Hr.Rain Fall(In) 3.42 Flow Length(ft) 24.0 ft 133.0 ft 96.5 ft Flow Length(ft) 100.0 ft Elevation Up(ft) 980.00 978.00 971.00 Elevation Up(ft) 982.00 Elevation Down(ft) 978.00 971.00 970.36 Elevation Down(ft) 980.00 Watercourse Slope(ft/ft) 0.083 0.053 0.007 Land Slope(ft/ft) 0.020 Average Velocity(ft/Sec) 5.9 _ 3.7 0.2 I Time Of Concentration(Mins) 20.77 Time Of Concentration(Mins) 0.07 0.60 7.85 Total Sheet Flow Tc(Minutes): 20.8 min. Total Shallow Concentrated Tc(Mins): 8.5 min. c:\pwworking\east01\d3569490\ Lyle Creek-Sediment Basin+PRE TOC Stafford Rd Culvert 4 of 12 8/16/2024 Time of Concentration Worksheet F3R PROJECT: Lyle Creek _ DATE: 08/16/24 SCENARIO: Erosion and Sediment Control PREPARED BY: PP 3. CHANNEL FLOW-RECTANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Rectangular Channel Tc(Mins): 0.0 mins. 4. CHANNEL FLOW-TRIANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Top Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Triangular Channel Tc 0.0 min. c:\pwworking\east01\d 3569490\ Lyle Creek-Sediment Basin+PRE TOC Stafford Rd Culvert 5 of 12 8/16/2024 Time of Concentration Worksheet F3R PROJECT: Lyle Creek DATE: 08/16/24 SCENARIO: Erosion and Sediment Control PREPARED BY: PP 5. CHANNEL FLOW-TRAPEZOIDAL CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Stream-Stoney Bottom Width(ft) 2.0 Depth(ft) 2.0 Side Slopes(?H:1V)(ft) 3.0 Area(Sq.ft) 16.0 Wetted Perimeter(ft) 14.6 Hydraulic Radius(ft) 1.1 Flow Length(ft) 145.0 Elevation Up(ft) 970.36 Elevation Down(ft) 956.35 Channel Slope(ft/ft) 0.097 Manning's"n" 0.025 Average Velocity(ft/Sec) 19.7 Time Of Concentration(Mins) 0.12 Total Trapezoidal Channel Tc 0.1 min. 6. CHANNEL FLOW-CIRCULAR CHANNEL(Gravity Flow) Segment#1 _ Segment#2 Segment#3 _ Segment#4 Segment#5 Segment#6 Segment#7 _ Segment#8 Segment#9 Surface Description Pipe Diameter(In) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Circular Channel Tc(Mins): 0.0 min. 7.Total Basin Time of Concentration (Mintues) Total Basin Tc (Mins): 29.4 min. c:\pwworking\east01\d 3569490\ Lyle Creek-Sediment Basin+PRE TOC Stafford Rd Culvert 8/23/2024 Time of Concentration Worksheet F3R PROJECT: Lyle Creek DATE: 08/16/24 SCENARIO: Erosion and Sediment Control PREPARED BY: PP Drainage Area Information Drainage Area Tc Summary Data DRAINAGE AREA ID: West Ditch Flow Type Length(ft) Elev.Diff. Tc TOTAL BASIN LENGTH: 767.69 ft Sheet Flow 100.0 6.24 22.9 mins. TOTAL ELEVATION UP: 971.77 Shallow Concentrated Flow 362.7 49.53 1.3 mins. TOTAL ELEVATION DOWN: 914.48 Channel Flow-Rectangular 0.0 0.00 0.0 mins. TOTAL ACRES: 3.19 Channel Flow-Triangular 0.0 0.00 0.0 mins. Channel Flow-Trapezoidal 305.0 1.52 1.7 mins. Channel Flow-Circular 0.0 0.00 0.0 mins. NOTES: Basin Totals 767.69 57.29 25.9 mins. 1. SHEET FLOW 2. SHALLOW CONCENTRATED FLOW Segment#1 _ Segment#2 Segment#3 Surface Description Woods Segment#1 Segment#2 Segment#3 Manning's"n" 0.80 Surface Description Grassed 2-Year,24-Hr.Rain Fall(In) 3.42 Flow Length(ft) 199.9 ft 162.8 ft Flow Length(ft) 100.0 ft Elevation Up(ft) 965.53 955.30 Elevation Up(ft) 971.77 Elevation Down(ft) 955.30 916.00 Elevation Down(ft) 965.53 Watercourse Slope(ft/ft) 0.051 0.241 Land Slope(ft/ft) 0.062 Average Velocity(ft/Sec) 3.7 7.9 Time Of Concentration(Mins) 22.94 Time Of Concentration(Mins) 0.91 0.34 Total Sheet Flow Tc(Minutes): 22.9 min. Total Shallow Concentrated Tc(Mins): 1.3 min. c:\pwworking\east01\d3569490\ Lyle Creek-Sediment Basin+PRE TOC West Ditch I of6 8/23/2024 Time of Concentration Worksheet F3R PROJECT: Lyle Creek _ DATE: 08/16/24 SCENARIO: Erosion and Sediment Control PREPARED BY: PP 3. CHANNEL FLOW-RECTANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Rectangular Channel Tc(Mins): 0.0 mins. 4. CHANNEL FLOW-TRIANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Top Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Triangular Channel Tc 0.0 min. c:\pwworking\east01\d 3569490\ Lyle Creek-Sediment Basin+PRE TOC West Ditch 2 of 6 8/23/2024 Time of Concentration Worksheet F3R PROJECT: Lyle Creek DATE: 08/16/24 SCENARIO: Erosion and Sediment Control PREPARED BY: PP 5. CHANNEL FLOW-TRAPEZOIDAL CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Grass Bottom Width(ft) 2.0 Depth(ft) 1.0 Side Slopes(?H:1V)(ft) 3.0 Area(Sq.ft) 5.0 Wetted Perimeter(ft) 8.3 Hydraulic Radius(ft) 0.6 Flow Length(ft) 305.0 Elevation Up(ft) 916.00 Elevation Down(ft) 914.48 Channel Slope(ft/ft) 0.005 Manning's"n" 0.025 Average Velocity(ft/Sec) 3.0 Time Of Concentration(Mins) 1.70 Total Trapezoidal Channel Tc 1.7 min. 6. CHANNEL FLOW-CIRCULAR CHANNEL(Gravity Flow) Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Pipe Diameter(In) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Circular Channel Tc(Mins): 0.0 min. 7.Total Basin Time of Concentration (Mintues) Total Basin Tc (Mins): 25.9 min. c:\pwworking\east01\d 3569490\ Lyle Creek-Sediment Basin+PRE TOC West Ditch 7 of6 8/23/2024 Time of Concentration Worksheet F3R PROJECT: Lyle Creek DATE: 08/16/24 SCENARIO: Erosion and Sediment Control PREPARED BY: PP Drainage Area Information Drainage Area Tc Summary Data DRAINAGE AREA ID: East Ditch Flow Type Length(ft) Elev.Diff. Tc TOTAL BASIN LENGTH: 730.0 ft Sheet Flow 100.0 7.50 21.3 mins. TOTAL ELEVATION UP: 972.00 Shallow Concentrated Flow 302.0 47.00 4.8 mins. TOTAL ELEVATION DOWN: 913.50 Channel Flow-Rectangular 0.0 0.00 0.0 mins. TOTAL ACRES: 3.26 Channel Flow-Triangular 0.0 0.00 0.0 mins. Channel Flow-Trapezoidal 328.0 4.00 0.9 mins. Channel Flow-Circular 0.0 0.00 0.0 mins. NOTES: Basin Totals 730.0 58.50 27.1 mins. 1. SHEET FLOW 2. SHALLOW CONCENTRATED FLOW Segment#1 _ Segment#2 Segment#3 Surface Description Woods Segment#1 Segment#2 Segment#3 Manning's"n" 0.80 Surface Description Forest Grassed 2-Year,24-Hr.Rain Fall(In) 3.42 Flow Length(ft) 198.0 ft 104.0 ft Flow Length(ft) 100.0 ft Elevation Up(ft) 964.50 948.50 Elevation Up(ft) 972.00 Elevation Down(ft) 948.50 917.50 Elevation Down(ft) 964.50 Watercourse Slope(ft/ft) 0.081 0.298 Land Slope(ft/ft) 0.075 Average Velocity(ft/Sec) 0.7 8.8 Time Of Concentration(Mins) 21.31 Time Of Concentration(Mins) 4.61 0.20 Total Sheet Flow Tc(Minutes): 21.3 min. Total Shallow Concentrated Tc(Mins): 4.8 min. c:\pwworking\east01\d3569490\ Lyle Creek-Sediment Basin+PRE TOC East Ditch 4 of 6 8/23/2024 Time of Concentration Worksheet F3R PROJECT: Lyle Creek _ DATE: 08/16/24 SCENARIO: Erosion and Sediment Control PREPARED BY: PP 3. CHANNEL FLOW-RECTANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Bottom Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Rectangular Channel Tc(Mins): 0.0 mins. 4. CHANNEL FLOW-TRIANGULAR CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Top Width(ft) Depth(ft) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Triangular Channel Tc 0.0 min. c:\pwworking\east01\d 3569490\ Lyle Creek-Sediment Basin+PRE TOC East Ditch 5 of 6 8/23/2024 Time of Concentration Worksheet F3R PROJECT: Lyle Creek DATE: 08/16/24 SCENARIO: Erosion and Sediment Control PREPARED BY: PP 5. CHANNEL FLOW-TRAPEZOIDAL CHANNEL Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Grass Bottom Width(ft) 2.0 Depth(ft) 1.5 Side Slopes(?H:1V)(ft) 3.0 Area(Sq.ft) 9.8 Wetted Perimeter(ft) 11.5 Hydraulic Radius(ft) 0.8 Flow Length(ft) 328.0 Elevation Up(ft) 917.50 Elevation Down(ft) 913.50 Channel Slope(ft/ft) 0.012 Manning's"n" 0.025 Average Velocity(ft/Sec) 5.9 Time Of Concentration(Mins) 0.93 Total Trapezoidal Channel Tc 0.9 min. 6. CHANNEL FLOW-CIRCULAR CHANNEL(Gravity Flow) Segment#1 Segment#2 Segment#3 Segment#4 Segment#5 Segment#6 Segment#7 Segment#8 Segment#9 Surface Description Pipe Diameter(In) Area(Sq.ft) Wetted Perimeter(ft) Hydraulic Radius(ft) Flow Length(ft) Elevation Up(ft) Elevation Down(ft) Channel Slope(ft/ft) Manning's"n" Average Velocity(ft/Sec) Time Of Concentration(Mins) Total Circular Channel Tc(Mins): 0.0 min. 7.Total Basin Time of Concentration (Mintues) Total Basin Tc (Mins): 27.1 min. c:\pwworking\east01\d 3569490\ Lyle Creek-Sediment Basin+PRE TOC East Ditch G ofG 0 ® ® <6S) Pre Conditions East Ditch Drainage Area to Basin Offsite DA <8S> 0 Culvert 1/West Ditch 0 Rd-Side Ditch Post Sediment Basin Subcat Reach on. Itil Routing Diagram for Lyle Creek Basin Flows Prepared by HDR, Inc, Printed 8/27/2024 HydroCAD®10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Lyle Creek Basin Flows Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area CN Description (sq-ft) (subcatchment-numbers) 546,242 65 (1 S) 146,362 66 (2S) 134,600 64 (3S) 71,003 61 (5S) 194,278 62 (6S) 375,487 76 (7S) 329,314 68 (8S) 1,797,286 67 TOTAL AREA Lyle Creek Basin Flows Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 3 Soil Listing (all nodes) Area Soil Subcatchment (sq-ft) Group Numbers 0 HSG A 0 HSG B 0 HSG C 0 HSG D 1,797,286 Other 1 S, 2S, 3S, 5S, 6S, 7S, 8S 1,797,286 TOTAL AREA Lyle Creek Basin Flows Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 4 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) Cover Numbers 0 0 0 0 1,797,286 1,797,286 1 S 2S 3S 5S 6S 7S 8S 0 0 0 0 1,797,286 1,797,286 TOTAL AREA Lyle Creek Basin Flows Type II 24-hr 1-yr Rainfall=2.93" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 5 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pre Conditions Runoff Area=12.540 ac 0.00% Impervious Runoff Depth>0.41" Tc=24.8 min CN=65 Runoff=4.13 cfs 18,534 cf Subcatchment2S: Culvert 1/West Ditch Runoff Area=3.360 ac 0.00% Impervious Runoff Depth>0.44" Tc=25.9 min CN=66 Runoff=1.21 cfs 5,381 cf Subcatchment3S: East Ditch Runoff Area=3.090 ac 0.00% Impervious Runoff Depth>0.37" Tc=27.1 min CN=64 Runoff=0.84 cfs 4,192 cf Subcatchment5S: Drainage Area to Basin Runoff Area=1.630 ac 0.00% Impervious Runoff Depth>0.29" Tc=5.0 min CN=61 Runoff=0.72 cfs 1,704 cf Subcatchment6S: Offsite DA Runoff Area=4.460 ac 0.00% Impervious Runoff Depth>0.31" Tc=20.0 min CN=62 Runoff=1.13 cfs 5,079 cf Subcatchment7S: Post Sediment Basin Runoff Area=8.620 ac 0.00% Impervious Runoff Depth>0.87" Tc=19.8 min CN=76 Runoff=8.83 cfs 27,184 cf Subcatchment8S: Rd-Side Ditch Runoff Area=7.560 ac 0.00% Impervious Runoff Depth>0.51" Tc=26.8 min CN=68 Runoff=3.30 cfs 14,097 cf Total Runoff Area = 1,797,286 sf Runoff Volume = 76,170 cf Average Runoff Depth = 0.51" 100.00% Pervious = 1,797,286 sf 0.00% Impervious = 0 sf Lyle Creek Basin Flows Type 1124-hr 1-yr Rainfall=2.93" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 1S: Pre Conditions Runoff = 4.13 cfs @ 12.24 hrs, Volume= 18,534 cf, Depth> 0.41" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-yr Rainfall=2.93" Area (ac) CN Description * 12.540 65 12.540 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.8 Direct Entry, TC-Basin Subcatchment 1S: Pre Conditions Hydrograph ❑Runoff 4.13 cfs T4p II 24 hr= - 1-yr Rainfall=2.03" J Runoff AtpaF,12 540�a1c 3-/ Runoff VoIume=r18534 cf Runoff Depth>0.41" 0 g Tc=24 nnin- 2- / CN=165 1 0 e .( 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type 1124-hr 1-yr Rainfall=2.93" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 2S: Culvert 1/West Ditch Runoff = 1.21 cfs @ 12.25 hrs, Volume= 5,381 cf, Depth> 0.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-yr Rainfall=2.93" Area (ac) CN Description * 3.360 66 3.360 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 25.9 Direct Entry, TC Subcatchment 2S: Culvert 1/West Ditch Hydrograph D Runoff 1.21 cfs - Tvp II 24-hr f-yr F int'aI I=2.93" 1-7 Runloff Area-3.360 at Runoff Volume=5,3811 c / Runoff Depth>0.44" - Tc= 5.9 min CN=66 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type 1124-hr 1-yr Rainfall=2.93" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 3S: East Ditch Runoff = 0.84 cfs @ 12.27 hrs, Volume= 4,192 cf, Depth> 0.37" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-yr Rainfall=2.93" Area (ac) CN Description * 3.090 64 3.090 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.1 Direct Entry, TC Subcatchment 3S: East Ditch Hydrograph II II1 ❑Runoff 0.9 0.84 cfs 0.85 L T �1124 hT,_ L 0.8 — — I 0.75/1 Lyrd Riiidai2.193i. 0.7 0.654/ u No fi Ali ea 349Oalc 0.55: V9 1119164 unIoff a!pt i>9-3Z c 0.45/ TC= 71 m i u. 0.44Z 0.35��•1 C41 � 025/� t • 0.157 0.05_ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type 1124-hr 1-yr Rainfall=2.93" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 5S: Drainage Area to Basin [49] Hint: Tc<2dt may require smaller dt Runoff = 0.72 cfs @ 11.99 hrs, Volume= 1,704 cf, Depth> 0.29" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-yr Rainfall=2.93" Area (ac) CN Description 1.630 61 1.630 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, TC Subcatchment 5S: Drainage Area to Basin Hydrograph 0.84 D Runoff 0.75/ 0.72 cfs 0.7 Tpe III 24-hi' I I I r 0.65: L1 1 Rinial12 3i 1 0.67 0.55 u nloffi A-i ea-01163Oal 0.5 1--13unIG1 V9111Tel iThI f / - 3 0.457 04 / un°f# pT>9 2! a 0.35/IC= min 0.15�I 0.1-V 0.05z 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type 1124-hr 1-yr Rainfall=2.93" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 6S: Offsite DA Runoff = 1.13 cfs @ 12.19 hrs, Volume= 5,079 cf, Depth> 0.31" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-yr Rainfall=2.93" Area (ac) CN Description * 4.460 62 4.460 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, TC Subcatchment 6S: Offsite DA Hydrograph D Runoff 1.13 cfs Tvp II 24-hrs 1-/ 1 L yr Rainiall=2.-93" Runbff Atea=4.460 ad Runoff Volume=5,071 c Runoff Depth>0.31" Tc=10.0 min 0 CN=62 0 0 ,. 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18, 19 20 Time (hours) Lyle Creek Basin Flows Type 1124-hr 1-yr Rainfall=2.93" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 7S: Post Sediment Basin Runoff = 8.83 cfs @ 12.14 hrs, Volume= 27,184 cf, Depth> 0.87" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-yr Rainfall=2.93" Area (ac) CN Description 8.620 76 8.620 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.8 Direct Entry, TC Post Basin Subcatchment 7S: Post Sediment Basin Hydrograph ❑Runoff 8.83 cfs — 9� Tope 1124-h r .V 87/ 1 kyr Rainfi3II=2.o3" 71/ Funpff Area=8.620 ac 6� unp f Vplume727i1-84—cf 5�— Runoff Depth>0�7" T� � nii n 4: dN=76 3- 1- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type 1124-hr 1-yr Rainfall=2.93" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment 8S: Rd-Side Ditch Runoff = 3.30 cfs @ 12.25 hrs, Volume= 14,097 cf, Depth> 0.51" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-yr Rainfall=2.93" Area (ac) CN Description * 7.560 68 7.560 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.8 Direct Entry, Subcatchment 8S: Rd-Side Ditch Hydrograph D Runoff 3.30 cfs T,p 1124-h r 3Y 1 Lyr Rainflall=2.03" Runoff Area=7.560 ac - Runoff Volume4�097 cf 2- Runoff Depth>0.51" / Tc=�6.� min - CN=08 /��//�� ,. . .. ,, , 0 1 2 3 4 5 6 7 8 9 10 11 12, 13, 1,4 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 2-yr Rainfall=3.55" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 13 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1S: Pre Conditions Runoff Area=12.540 ac 0.00% Impervious Runoff Depth>0.68" Tc=24.8 min CN=65 Runoff=7.91 cfs 30,999 cf Subcatchment2S: Culvert 1/West Ditch Runoff Area=3.360 ac 0.00% Impervious Runoff Depth>0.73" Tc=25.9 min CN=66 Runoff=2.24 cfs 8,858 cf Subcatchment3S: East Ditch Runoff Area=3.090 ac 0.00% Impervious Runoff Depth>0.64" Tc=27.1 min CN=64 Runoff=1.67 cfs 7,132 cf Subcatchment5S: Drainage Area to Basin Runoff Area=1.630 ac 0.00% Impervious Runoff Depth>0.52" Tc=5.0 min CN=61 Runoff=1.51 cfs 3,068 cf Subcatchment6S: Offsite DA Runoff Area=4.460 ac 0.00% Impervious Runoff Depth>0.55" Tc=20.0 min CN=62 Runoff=2.45 cfs 8,968 cf Subcatchment7S: Post Sediment Basin Runoff Area=8.620 ac 0.00% Impervious Runoff Depth>1.27" Tc=19.8 min CN=76 Runoff=13.14 cfs 39,710 cf Subcatchment8S: Rd-Side Ditch Runoff Area=7.560 ac 0.00% Impervious Runoff Depth>0.82" Tc=26.8 min CN=68 Runoff=5.77 cfs 22,548 cf Total Runoff Area = 1,797,286 sf Runoff Volume = 121,283 cf Average Runoff Depth = 0.81" 100.00% Pervious = 1,797,286 sf 0.00% Impervious = 0 sf Lyle Creek Basin Flows Type II 24-hr 2-yr Rainfall=3.55" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment 1S: Pre Conditions Runoff = 7.91 cfs @ 12.22 hrs, Volume= 30,999 cf, Depth> 0.68" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-yr Rainfall=3.55" Area (ac) CN Description * 12.540 65 12.540 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.8 Direct Entry, TC-Basin Subcatchment 1S: Pre Conditions Hydrograph ❑Runoff 7.91 cfs T,p 1124-h r 71/ 2kyr Rainfall=3. 5" 6-=/—Runoff Arpa=12 549 - Runpff Voilume730Mp cf 5-/ Runoff Depth>0.68" g 41Tc=24.1 min ' 0 0 3��CN=65 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 2-yr Rainfall=3.55" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment 2S: Culvert 1/West Ditch Runoff = 2.24 cfs @ 12.23 hrs, Volume= 8,858 cf, Depth> 0.73" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-yr Rainfall=3.55" Area (ac) CN Description * 3.360 66 3.360 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 25.9 Direct Entry, TC Subcatchment 2S: Culvert 1/West Ditch Hydrograph D Runoff 2.24 cfs - Tvp II 24-hrs 2Y 2-yr Rain1all=3. 5" Runbff Atea=3.360 ac Runoff Volume8,i858 cf Runoff Depth>0.73" Tc 5.6niin 1 - C�NJ66 a 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 2-yr Rainfall=3.55" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment 3S: East Ditch Runoff = 1.67 cfs @ 12.25 hrs, Volume= 7,132 cf, Depth> 0.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-yr Rainfall=3.55" Area (ac) CN Description * 3.090 64 3.090 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.1 Direct Entry, TC Subcatchment 3S: East Ditch Hydrograph D Runoff 1.67 cfs _ Typ II 24-hr 2-yr Rain1'aII=3. 5" Runbff Artea=3.090 ac Runpff Vplume7,13? c 1 ' Run ff D!pt~1>9.6�" Tc=27.1 min k CN=64 p 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 2-yr Rainfall=3.55" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment 5S: Drainage Area to Basin [49] Hint: Tc<2dt may require smaller dt Runoff = 1.51 cfs @ 11.98 hrs, Volume= 3,068 cf, Depth> 0.52" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-yr Rainfall=3.55" Area (ac) CN Description 1.630 61 1.630 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) — 5.0 Direct Entry, TC Subcatchment 5S: Drainage Area to Basin Hydrograph ❑Runoff 1.51 cfs Type II 24-hr 2-yrI Rainfall=3.155" Runloff Area=1 .630 ad 1y Runlo#f Vzplume=3,06 cf Runpff Depth>9.5?" / Tc=5.0 min CNJ61 zz 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 2-yr Rainfall=3.55" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment 6S: Offsite DA Runoff = 2.45 cfs @ 12.17 hrs, Volume= 8,968 cf, Depth> 0.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-yr Rainfall=3.55" Area (ac) CN Description * 4.460 62 4.460 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, TC Subcatchment 6S: Offsite DA Hydrograph ❑Runoff 2.45 cfs - Tvp II 24-hr r/ 2. r in 'aII=3. 5" _ 2Y Runbff Arfea=4.460 ac Runoff Volume8,968 cf Runoff! Depth>0.55" Tc= 0.0 m i n 1- 6NJ62 0 o 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 2-yr Rainfall=3.55" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 19 Summary for Subcatchment 7S: Post Sediment Basin Runoff = 13.14 cfs @ 12.13 hrs, Volume= 39,710 cf, Depth> 1.27" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-yr Rainfall=3.55" Area (ac) CN Description * 8.620 76 8.620 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.8 Direct Entry, TC Post Basin Subcatchment 7S: Post Sediment Basin Hydrograph / 1 1 _J _ ■Runoff 14_ 13.14 cfs 13_ T,p� II 124-hr t r I - 12_ 2 y-r Ralinf�II=3. 5" 1 I 11_ —RunofflAia=8.620rac 1 I rt 10- 9 unoff iVOume=3971 Ecf 8/ Runoff Depth>1 .27" 0 71/Tc=19.8 min F37/ 2= jit 1 I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 2-yr Rainfall=3.55" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment 8S: Rd-Side Ditch Runoff = 5.77 cfs @ 12.24 hrs, Volume= 22,548 cf, Depth> 0.82" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-yr Rainfall=3.55" Area (ac) CN Description * 7.560 68 7.560 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.8 Direct Entry, Subcatchment 8S: Rd-Side Ditch Hydrograph ❑Runoff 6=Z TIpI 5.77 cfs 1124-h r I 5/ 2-yr RAinfaII Runoff Area=7. 60 ac 4Y Runoff�Iume=2254cf - Runoff Depth>0.82" 3 A Tc=26.i m in ' H- H- - dN=168 2_ I � 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 5-yr Rainfall=4.50" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 21 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pre Conditions Runoff Area=12.540 ac 0.00% Impervious Runoff Depth>1.18" Tc=24.8 min CN=65 Runoff=14.94 cfs 53,890 cf Subcatchment2S: Culvert 1/West Ditch Runoff Area=3.360 ac 0.00% Impervious Runoff Depth>1.25" Tc=25.9 min CN=66 Runoff=4.13 cfs 15,188 cf Subcatchment3S: East Ditch Runoff Area=3.090 ac 0.00% Impervious Runoff Depth>1.12" Tc=27.1 min CN=64 Runoff=3.25 cfs 12,584 cf Subcatchment5S: Drainage Area to Basin Runoff Area=1.630 ac 0.00% Impervious Runoff Depth>0.96" Tc=5.0 min CN=61 Runoff=3.00 cfs 5,676 cf Su bcatchment 6S: Offsite DA Runoff Area=4.460 ac 0.00% Impervious Runoff Depth>1.01" Tc=20.0 min CN=62 Runoff=5.01 cfs 16,327 cf Subcatchment7S: Post Sediment Basin Runoff Area=8.620 ac 0.00% Impervious Runoff Depth>1.95" Tc=19.8 min CN=76 Runoff=20.30 cfs 60,875 cf Subcatchment8S: Rd-Side Ditch Runoff Area=7.560 ac 0.00% Impervious Runoff Depth>1.37" Tc=26.8 min CN=68 Runoff=10.19 cfs 37,671 cf Total Runoff Area = 1,797,286 sf Runoff Volume = 202,210 cf Average Runoff Depth = 1.35" 100.00% Pervious = 1,797,286 sf 0.00% Impervious = 0 sf Lyle Creek Basin Flows Type II 24-hr 5-yr Rainfall=4.50" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 22 Summary for Subcatchment 1S: Pre Conditions Runoff = 14.94 cfs @ 12.20 hrs, Volume= 53,890 cf, Depth> 1.18" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 5-yr Rainfall=4.50" Area (ac) CN Description * 12.540 65 12.540 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.8 Direct Entry, TC-Basin Subcatchment 1S: Pre Conditions Hydrograph / 1 16/ 0 Runoff _ , 14.94 cfs 157 T if12Jhr T 14= 134/ 5.yr R inf`aII-4. O" 1 I 12 RunofIa1 Z54p1 - - 11/ •10 RiulnrINf uTe7_3 9Q--cf- 9_ Runoff Depth>1.18" 0 8/ Tc=14Ai r ri n— r10 - IL - 6 dN= 1I 0 - 4- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 5-yr Rainfall=4.50" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 23 Summary for Subcatchment 2S: Culvert 1/West Ditch Runoff = 4.13 cfs @ 12.22 hrs, Volume= 15,188 cf, Depth> 1.25" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 5-yr Rainfall=4.50" Area (ac) CN Description * 3.360 66 3.360 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 25.9 Direct Entry, TC Subcatchment 2S: Culvert 1/West Ditch Hydrograph ❑Runoff 4.13 cfs T4p II 24hr4 5-yr Rainfall=4.50" Runoff Ara=3.L 0 ac 3-./ Runoff VoIume=r15188 cf Runoff Depth>1.25" / 2�Tc=25 J rain± - CN=166 0 e 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 5-yr Rainfall=4.50" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 24 Summary for Subcatchment 3S: East Ditch Runoff = 3.25 cfs @ 12.24 hrs, Volume= 12,584 cf, Depth> 1.12" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 5-yr Rainfall=4.50" Area (ac) CN Description 3.090 64 3.090 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.1 Direct Entry, TC Subcatchment 3S: East Ditch Hydrograph D Runoff 3.25 cfs - Tp�1F24-hr l 3= 5-yr Rainfall=4. 0" I/ - Runoff Area=3.090 ac Rlunpff Vo,lurne284 cfI 2 Runoff Depth>1.12" 0 Tc=27.'� nu i n 0 _ C N=164 0 / 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 5-yr Rainfall=4.50" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment 5S: Drainage Area to Basin [49] Hint: Tc<2dt may require smaller dt Runoff = 3.00 cfs @ 11.97 hrs, Volume= 5,676 cf, Depth> 0.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 5-yr Rainfall=4.50" Area (ac) CN Description 1.630 61 1.630 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, TC Subcatchment 5S: Drainage Area to Basin ` Hydrograph / D Runoff 3.00 cfs 3 Type II 24-hr 5-yr�Rainfall=4.50" - Runloff Artea=1.630 ad 2-/ Rumor p-ff V-plurne=5,67-cf - Runpff Depth>9.9!" 3 / Tc=5.0 min CNJ61 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 5-yr Rainfall=4.50" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 26 Summary for Subcatchment 6S: Offsite DA Runoff = 5.01 cfs @ 12.15 hrs, Volume= 16,327 cf, Depth> 1.01" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 5-yr Rainfall=4.50" Area (ac) CN Description * 4.460 62 4.460 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, TC Subcatchment 6S: Offsite DA Hydrograph 2 Runoff 5.01 cfs 5:A Tip II 24-hrs j T 5 yr Rainf II 4. 0" 47 F unpff Area=4.460 ac I:tun?ff Volume=r16327 cf 3i Runoff Depth>LOI"- Tc= O.) nin 2-yh--CM=162- / - IL40 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 5-yr Rainfall=4.50" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment 7S: Post Sediment Basin Runoff = 20.30 cfs @ 12.13 hrs, Volume= 60,875 cf, Depth> 1.95" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 5-yr Rainfall=4.50" Area (ac) CN Description * 8.620 76 8.620 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.8 Direct Entry, TC Post Basin Subcatchment 7S: Post Sediment Basin Hydrograph — 1 1 — I - 4 •Runoff 21 22, 20.30 cfs —1 —h - /— tfiI- 1 1 1 20_, T 24-h 18 /_51.y-r aiir ii 4.�A" I I I _ 1 rz 164< u n off lAroa 8.6420[a l 1 1 1 1 - 4 - 15 _ ,2iz—Runoff De th>'I-.95"- - - 0 11t Tc='�9 rr�`i n 1 I - i— ' i I 10: 94/-c'N=I7 -1 4 4 4 I— I— in 7 I I - 4 - 81< 7%— S�— II fifih � fi � lI H � - 4V- 0 7 3V— 01 VZ/-, / /, -/ 7 .( Z '" . .. . .,.. ..(.. . ,. ,: .. (. ( 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 5-yr Rainfall=4.50" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 28 Summary for Subcatchment 8S: Rd-Side Ditch Runoff = 10.19 cfs @ 12.22 hrs, Volume= 37,671 cf, Depth> 1.37" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 5-yr Rainfall=4.50" Area (ac) CN Description * 7.560 68 7.560 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.8 Direct Entry, Subcatchment 8S: Rd-Side Ditch Hydrograph 10.19 cfs ■Runoff 10� T /p II 12�ht i I - - 91/ 5-yr Ralinf Il 4.&0" I I 4 81/ Runpff 1Aroa=7.560 ac Rfunpfif iN o7ume=37671—cf Runoff l: th>13 7" 0 = Tc= 6.8 min 5_ 4_ 2y -ii , ii 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type 1124-hr 10-yr Rainfall=5.25" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 29 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pre Conditions Runoff Area=12.540 ac 0.00% Impervious Runoff Depth>1.64" Tc=24.8 min CN=65 Runoff=21.21 cfs 74,437 cf Subcatchment2S: Culvert 1/West Ditch Runoff Area=3.360 ac 0.00% Impervious Runoff Depth>1.71" Tc=25.9 min CN=66 Runoff=5.81 cfs 20,833 cf Subcatchment3S: East Ditch Runoff Area=3.090 ac 0.00% Impervious Runoff Depth>1.56" Tc=27.1 min CN=64 Runoff=4.68 cfs 17,510 cf Su bcatchment 5S: Drainage Area to Basin Runoff Area=1.630 ac 0.00% Impervious Runoff Depth>1.37" Tc=5.0 min CN=61 Runoff=4.36 cfs 8,081 cf Subcatchment6S: Offsite DA Runoff Area=4.460 ac 0.00% Impervious Runoff Depth>1.42" Tc=20.0 min CN=62 Runoff=7.36 cfs 23,067 cf Subcatchment7S: Post Sediment Basin Runoff Area=8.620 ac 0.00% Impervious Runoff Depth>2.52" Tc=19.8 min CN=76 Runoff=26.25 cfs 78,775 cf Subcatchment8S: Rd-Side Ditch Runoff Area=7.560 ac 0.00% Impervious Runoff Depth>1.86" Tc=26.8 min CN=68 Runoff=14.04 cfs 51,000 cf Total Runoff Area = 1,797,286 sf Runoff Volume = 273,703 cf Average Runoff Depth = 1.83" 100.00% Pervious = 1,797,286 sf 0.00% Impervious = 0 sf Lyle Creek Basin Flows Type 1124-hr 10-yr Rainfall=5.25" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 30 Summary for Subcatchment 1S: Pre Conditions Runoff = 21.21 cfs @ 12.20 hrs, Volume= 74,437 cf, Depth> 1.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.25" Area (ac) CN Description * 12.540 65 12.540 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.8 Direct Entry, TC-Basin Subcatchment 1S: Pre Conditions Hydrograph /— 11 — 23/ - ■Runoff 21 — t I1 21.21 cfs _ 1 1 H _ 20V T�/p�iF2hrfi— Ifr 18 16-ir-Rai-nfa+ 5125 1 I 1 I- 1 I -14 - 17 IA-rea 1 40-ap- 1 = t — 1 - — — 16 — 1145 -1:2utio#IVuTe 4 31 - 1 13V/ Runof# p�p th>1-:64-- - 0 11 Tc�24:3 rain - 1 0 1 1 1 81 74Z/— — 1 —1 4 I— 1— ' 1 0 1— 1 — —1 4 — 4'i fi �� 3'_ 2 /////// / 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type 1124-hr 10-yr Rainfall=5.25" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 31 Summary for Subcatchment 2S: Culvert 1/West Ditch Runoff = 5.81 cfs @ 12.21 hrs, Volume= 20,833 cf, Depth> 1.71" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.25" Area (ac) CN Description * 3.360 66 3.360 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 25.9 Direct Entry, TC Subcatchment 2S: Culvert 1/West Ditch Hydrograph D Runoff 6-/ 5.81 cfs Type 1124-h r 5- 1 byr-Rairifall=5 25"- Runoff Arpa=3. 60 ac 4:/ Runoff Viume=�0&33 cf Runoff Depth>1.71" 3 / Tc=25.6 / dN=166 Or 2_ I / 1 % izizzz 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type 1124-hr 10-yr Rainfall=5.25" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 32 Summary for Subcatchment 3S: East Ditch Runoff = 4.68 cfs @ 12.23 hrs, Volume= 17,510 cf, Depth> 1.56" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.25" Area (ac) CN Description * 3.090 64 3.090 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.1 Direct Entry, TC Subcatchment 3S: East Ditch Hydrograph 5-/ ❑Runoff 4.68 cfs T4p 1124=h r / 4��1 b=ylri��a'mfall=5�25� Runoff Area=3.090 ac I unpff Volume=17 519cf_ 3_ Runoff Depth>1.56" o - Tc=27. Min 2- dN=164 0 T 1_ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type 1124-hr 10-yr Rainfall=5.25" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 33 Summary for Subcatchment 5S: Drainage Area to Basin [49] Hint: Tc<2dt may require smaller dt Runoff = 4.36 cfs @ 11.97 hrs, Volume= 8,081 cf, Depth> 1.37" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.25" Area (ac) CN Description 1.630 61 1.630 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, TC Subcatchment 5S: Drainage Area to Basin ` Hydrograph / ❑Runoff 4.36 cfs TypJ124-hr 4 10-ylr kairifall=5.2 " Runloff Artea=1 .630 ad 3- I4unpff Vplurne78,081 cf Runoff Depth>1.37" Tc5.-Om n - O II 2— GIN�61 1- ,, 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16, 17, 18, 19, 20 Time (hours) Lyle Creek Basin Flows Type 1124-hr 10-yr Rainfall=5.25" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 34 Summary for Subcatchment 6S: Offsite DA Runoff = 7.36 cfs @ 12.14 hrs, Volume= 23,067 cf, Depth> 1.42" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.25" Area (ac) CN Description * 4.460 62 4.460 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, TC Subcatchment 6S: Offsite DA Hydrograph 8- 2 Runoff 7.36 cfs 7]/ 11-24 h ri 1 Rainfali=5125F' 6� Runoff Area 4.460 ac 5lz unpff VrAur e=r23 -67—cf Runoff Dep�th>1.42" Tc= 0.6 ni i nT 31/ dl j 2 1Y 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type 1124-hr 10-yr Rainfall=5.25" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 35 Summary for Subcatchment 7S: Post Sediment Basin Runoff = 26.25 cfs @ 12.13 hrs, Volume= 78,775 cf, Depth> 2.52" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.25" Area (ac) CN Description * 8.620 76 8.620 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.8 Direct Entry, TC Post Basin Subcatchment 7S: Post Sediment Basin Hydrograph ❑Runoff 28--/ 26.25 cfs 26 / T,p� II 124-hr fi 24- 1b-y�- �ainkfal�=55 I — 1 22- —FtrimOfflArea=8.620rac 20- 18_ —RiunpffiVo�ume=787 cf 16/ Runoff Depth>2.52" 141/Tc=19.8 min 121/ dN=7-6-1 I —L - 10- 8 - I 00 rt 4_ 2= 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type 1124-hr 10-yr Rainfall=5.25" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 36 Summary for Subcatchment 8S: Rd-Side Ditch Runoff = 14.04 cfs @ 12.22 hrs, Volume= 51,000 cf, Depth> 1.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.25" Area (ac) CN Description * 7.560 68 7.560 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.8 Direct Entry, Subcatchment 8S: Rd-Side Ditch Hydrograph 157 ■Runoff 14.04 cfs 14/ T a 124h r - I— I 13� b y-iR�ainEfall=5125 4 - 11/—13unPIFIA 'ea#7.5-601 ac 10 1 10z RIIIJ)nQ V�ur�e�51 O�f - 9�-Runoff Depth>1-6� — 7 ma .c= m i n 64/ dN=I681 T T I— I d0 4_ 3/ i 2= 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 25-yr Rainfall=6.27" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 37 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pre Conditions Runoff Area=12.540 ac 0.00% Impervious Runoff Depth>2.31" Tc=24.8 min CN=65 Runoff=30.43 cfs 105,004 cf Subcatchment2S: Culvert 1/West Ditch Runoff Area=3.360 ac 0.00% Impervious Runoff Depth>2.39" Tc=25.9 min CN=66 Runoff=8.26 cfs 29,195 cf Subcatchment3S: East Ditch Runoff Area=3.090 ac 0.00% Impervious Runoff Depth>2.22" Tc=27.1 min CN=64 Runoff=6.81 cfs 24,873 cf Subcatchment5S: Drainage Area to Basin Runoff Area=1.630 ac 0.00% Impervious Runoff Depth>1.98" Tc=5.0 min CN=61 Runoff=6.38 cfs 11,727 cf Subcatchment6S: Offsite DA Runoff Area=4.460 ac 0.00% Impervious Runoff Depth>2.05" Tc=20.0 min CN=62 Runoff=10.86 cfs 33,238 cf Subcatchment7S: Post Sediment Basin Runoff Area=8.620 ac 0.00% Impervious Runoff Depth>3.33" Tc=19.8 min CN=76 Runoff=34.69 cfs 104,292 cf Subcatchment8S: Rd-Side Ditch Runoff Area=7.560 ac 0.00% Impervious Runoff Depth>2.57" Tc=26.8 min CN=68 Runoff=19.64 cfs 70,574 cf Total Runoff Area = 1,797,286 sf Runoff Volume = 378,902 cf Average Runoff Depth = 2.53" 100.00% Pervious = 1,797,286 sf 0.00% Impervious = 0 sf Lyle Creek Basin Flows Type 1124-hr 25-yr Rainfall=6.27" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 38 Summary for Subcatchment 1S: Pre Conditions Runoff = 30.43 cfs @ 12.19 hrs, Volume= 105,004 cf, Depth> 2.31" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-yr Rainfall=6.27" Area (ac) CN Description * 12.540 65 12.540 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.8 Direct Entry, TC-Basin Subcatchment 1S: Pre Conditions Hydrograph 34 1 I 1 T ■Runoff 32 - 30.43 cfs - 30 T113_e� r ' . — 28 26-yi f in1al1 6.2-7" I 0 4 — 26 24 Runpfp4r�a=1 2. 40 ac 1 ' ' 1 A 22 _ tunptf VLoa!ume=1D5PII04_c - 7 7 1 7 7 a 20,8 Runoff-Depth>2.31" 0 16 T =24.81 min fi / 1 4 IS 14 C O5-1 1 1 - 4 — 12 10 - 0% , 1 A 6 - I- 7 i 4 0 f , .1/1� .1 . iiiiiii . . ' , . .. .. . .. . 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type 1124-hr 25-yr Rainfall=6.27" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 39 Summary for Subcatchment 2S: Culvert 1/West Ditch Runoff = 8.26 cfs @ 12.20 hrs, Volume= 29,195 cf, Depth> 2.39" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-yr Rainfall=6.27" Area (ac) CN Description * 3.360 66 3.360 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 25.9 Direct Entry, TC Subcatchment 2S: Culvert 1/West Ditch Hydrograph ❑Runoff 8.26 cfs 8- T4p 1124h r= - 25-yll- Rainfall=6!27� un ff Ara=3. 60 ac / 6� F unpff Volume7!9L9p cf 5Y Runoff Depth>2.39" 4�Tc=�5J rain 3Y 2'017 immeregriereoP0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type 1124-hr 25-yr Rainfall=6.27" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 40 Summary for Subcatchment 3S: East Ditch Runoff = 6.81 cfs @ 12.22 hrs, Volume= 24,873 cf, Depth> 2.22" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-yr Rainfall=6.27" Area (ac) CN Description * 3.090 64 3.090 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.1 Direct Entry, TC Subcatchment 3S: East Ditch Hydrograph ❑Runoff 6.81 cfs 7� T4pe 1124-h r 61/ 2 -ylr RiairWifafi 6-7 I 51/ R3unpff Area 3.Q�90Lac N I�un?ff Volume�2487�3 cf 41/—Runoff Depth>2:22 O Tc= 7.'� 3- dN=64 0 -/ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type 1124-hr 25-yr Rainfall=6.27" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 41 Summary for Subcatchment 5S: Drainage Area to Basin [49] Hint: Tc<2dt may require smaller dt Runoff = 6.38 cfs @ 11.96 hrs, Volume= 11,727 cf, Depth> 1.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-yr Rainfall=6.27" Area (ac) CN Description 1.630 61 1.630 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, TC Subcatchment 5S: Drainage Area to Basin Hydrograph 7 0 Runoff 6.38 cfs 6- Typ� -24-hr c 25-ylr Rainfali=6127" 5Y Runoff Area=1.630 ac 4� Runoff Volume=11 27 cf • - Runoff Depth>1.98 LL 3_1/ CN=61 2/ 7 T T T T T - 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type 1124-hr 25-yr Rainfall=6.27" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 42 Summary for Subcatchment 6S: Offsite DA Runoff = 10.86 cfs @ 12.14 hrs, Volume= 33,238 cf, Depth> 2.05" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-yr Rainfall=6.27" Area (ac) CN Description * 4.460 62 4.460 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, TC Subcatchment 6S: Offsite DA Hydrograph 12 i ■Runoff 10.86 cfs 11_ T p 11I24,hr_ 10� I - Run Of Aripa4.460 4 — � p#flV�unlume= 3 23 c _ - 7= _Runoff Depth>2.O5" 6=o Tc-10 Sarin - 57/ a hL=1fi2l 3- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type 1124-hr 25-yr Rainfall=6.27" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 43 Summary for Subcatchment 7S: Post Sediment Basin Runoff = 34.69 cfs @ 12.12 hrs, Volume= 104,292 cf, Depth> 3.33" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-yr Rainfall=6.27" Area (ac) CN Description * 8.620 76 8.620 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.8 Direct Entry, TC Post Basin Subcatchment 7S: Post Sediment Basin Hydrograph 38/ H Runoff 36 , 34.69 cfs H 34 Tff 11411- 301z-26=p' intalt-6.17"1— 1 1 1 1 1 H H _ 28Y_RumpffH°`rela 4.6O , _ 1 1 H H �2un ff Vort me= 4-29 241— I H 22 -Runoff-Deytl 3. " 20 / ~F � H H H H 1 1 H Tc19 018- = min f H $01w. -H 1— H - 14/ 12 H H H - 10� 4i/ 2 / 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type 1124-hr 25-yr Rainfall=6.27" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 44 Summary for Subcatchment 8S: Rd-Side Ditch Runoff = 19.64 cfs @ 12.21 hrs, Volume= 70,574 cf, Depth> 2.57" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-yr Rainfall=6.27" Area (ac) CN Description * 7.560 68 7.560 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.8 Direct Entry, Subcatchment 8S: Rd-Side Ditch Hydrograph /— - 4 - 21 _ — ■Runoff �— 19.64 cfs 1920 T�p�Jll2hl� ,; =2 .1fI-Riainfal b'-1-271- I - — 4 4 - 15 —Ran off IAr+ a,-7.460rac I - N 14-3 � IVue 07 12= _Runoff pept#>2,57 10 Tc6 rain 9/—cII=16 -1 fi I— Or 74— — - — 54/— II — / I 347 17,1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 50-yr Rainfall=7.09" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 45 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1S: Pre Conditions Runoff Area=12.540 ac 0.00% Impervious Runoff Depth>2.88" Tc=24.8 min CN=65 Runoff=38.28 cfs 131,282 cf Subcatchment2S: Culvert 1/West Ditch Runoff Area=3.360 ac 0.00% Impervious Runoff Depth>2.98" Tc=25.9 min CN=66 Runoff=10.34 cfs 36,359 cf Subcatchment3S: East Ditch Runoff Area=3.090 ac 0.00% Impervious Runoff Depth>2.78" Tc=27.1 min CN=64 Runoff=8.62 cfs 31,225 cf Subcatchment5S: Drainage Area to Basin Runoff Area=1.630 ac 0.00% Impervious Runoff Depth>2.52" Tc=5.0 min CN=61 Runoff=8.11 cfs 14,907 cf Subcatchment6S: Offsite DA Runoff Area=4.460 ac 0.00% Impervious Runoff Depth>2.60" Tc=20.0 min CN=62 Runoff=13.87 cfs 42,076 cf Subcatchment7S: Post Sediment Basin Runoff Area=8.620 ac 0.00% Impervious Runoff Depth>4.01" Tc=19.8 min CN=76 Runoff=41.56 cfs 125,525 cf Subcatchment8S: Rd-Side Ditch Runoff Area=7.560 ac 0.00% Impervious Runoff Depth>3.18" Tc=26.8 min CN=68 Runoff=24.35 cfs 87,235 cf Total Runoff Area = 1,797,286 sf Runoff Volume = 468,610 cf Average Runoff Depth = 3.13" 100.00% Pervious = 1,797,286 sf 0.00% Impervious = 0 sf Lyle Creek Basin Flows Type II 24-hr 50-yr Rainfall=7.09" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 46 Summary for Subcatchment 1S: Pre Conditions Runoff = 38.28 cfs @ 12.19 hrs, Volume= 131,282 cf, Depth> 2.88" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-yr Rainfall=7.09" Area (ac) CN Description * 12.540 65 12.540 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.8 Direct Entry, TC-Basin Subcatchment 1S: Pre Conditions Hydrograph 42_ — — - ■Runoff 40V 38.28 cfs 38V Typ 11_ 41rrt fi I- l 1 1 - 1 1 rt = 36- 34V—50—yi Rijn all 7.0.1 1 1 132 30V un9ff p`rea 2. 01Ac0 — —I 4 - 28 �u11 fVL mE= 31�8 c! 4 _ ,_ 1 _ _14 244/_tun ff-Dept 2. 22= LL m fi I— 1- 0 20V�1:=2 min Li 18i/ Or 14 :/ 1 1 i 12=/ 8 — — 1- 1- 1 Ij - 1 - 1 - 6v zr 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 50-yr Rainfall=7.09" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 47 Summary for Subcatchment 2S: Culvert 1/West Ditch Runoff = 10.34 cfs @ 12.20 hrs, Volume= 36,359 cf, Depth> 2.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-yr Rainfall=7.09" Area (ac) CN Description * 3.360 66 3.360 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 25.9 Direct Entry, TC Subcatchment 2S: Culvert 1/West Ditch Hydrograph / ■Runoff 117 10.34 cfs 10_ 4p�TL2 hr 4 I-Riaififal7f09 / 4 9_ 5b� $= Runofflikroa3.360 ac 4 Rfunpffyo ume=36p-5 cf 64 Runoff Depth>2 98. / - g Tc=25 6 min- i - i" 51 4 3_ 2 / , !�Zy 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 50-yr Rainfall=7.09" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 48 Summary for Subcatchment 3S: East Ditch Runoff = 8.62 cfs @ 12.22 hrs, Volume= 31,225 cf, Depth> 2.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-yr Rainfall=7.09" Area (ac) CN Description 3.090 64 3.090 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.1 Direct Entry, TC Subcatchment 3S: East Ditch Hydrograph ❑Runoff 9� 8.62 cfs 8/ T peA-24-hr' 503n- Rainfal1=710e Runoff Aroa3.Q90 ac 6 / Runoff Volurne=r31 22p cf 5y Runoff Depth>278`L Tc=27 n4in dN=I64 0 3_ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 50-yr Rainfall=7.09" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 49 Summary for Subcatchment 5S: Drainage Area to Basin [49] Hint: Tc<2dt may require smaller dt Runoff = 8.11 cfs @ 11.96 hrs, Volume= 14,907 cf, Depth> 2.52" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-yr Rainfall=7.09" Area (ac) CN Description 1.630 61 1.630 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, TC Subcatchment 5S: Drainage Area to Basin Hydrograph •Runoff 8.11 cfs 8� Type II 2hrt r/ w� kf,��0=y �a at7f09" - _Runoff Area=1.630 ac 6 Fun toff Vollume=1407 cf - 5 Runoff Dept2.52" LL 4:/ To= .�m �i 3-7 1-/ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15, 16, 17, 18, 19, 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 50-yr Rainfall=7.09" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 50 Summary for Subcatchment 6S: Offsite DA Runoff = 13.87 cfs @ 12.14 hrs, Volume= 42,076 cf, Depth> 2.60" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-yr Rainfall=7.09" Area (ac) CN Description * 4.460 62 4.460 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, TC Subcatchment 6S: Offsite DA Hydrograph — 4 4 — - - 4 4 - Runoff 15- 13.87 cfs 14/ T p�1124-ham - 13 12 —5 ir-RilWat 7f09 I 4 11 13unofflAr a tt.t04c1 / J I Vol 8 —Runoff Dept 2-60� - 0 7 /—T& o:K6 mlrin 6� cI N_ 1621 5/ 4� I 0 2/ I _i IL / ,' a 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 50-yr Rainfall=7.09" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 51 Summary for Subcatchment 7S: Post Sediment Basin Runoff = 41.56 cfs @ 12.12 hrs, Volume= 125,525 cf, Depth> 4.01" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-yr Rainfall=7.09" Area (ac) CN Description * 8.620 76 8.620 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.8 Direct Entry, TC Post Basin Subcatchment 7S: Post Sediment Basin Hydrograph 46(— H - ■Runoff as 41. cs 40 � � t1J24r� „� �— 56f 36 5034 nFalt 7.O9 I— j7 1— 1 4 4 34 —Ru11 ff a s 30 —Ru-n?fLVLoe=�}25�21 26 —Runof- epth4.81" - = 24�— v~ o224T�=19.Slmnrtfirl 1- I- I H -L 18y20� - 16� 14✓ H H 4 12�— 8 — - — E 64/— 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 50-yr Rainfall=7.09" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 52 Summary for Subcatchment 8S: Rd-Side Ditch Runoff = 24.35 cfs @ 12.21 hrs, Volume= 87,235 cf, Depth> 3.18" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-yr Rainfall=7.09" Area (ac) CN Description * 7.560 68 7.560 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.8 Direct Entry, Subcatchment 8S: Rd-Side Ditch Hydrograph /— 1 1 - _I J — ■Runoff 26� 24.35 cfs 24 T4p� 1112 7h r� H I— I 1 I —I H 224/ 5b-y-Riaintali=7109t' 1 1 1 _ I 1 1 201/ 1816� #1V I 0ffI a •P601 1 I ' I 1 4 - uno ume 7 3 E - 7 7 1 71 7 - 3 14�4 Tc.-= rni n� 3�18 H 1— _I _L - LT 12 10I/—d 16$I H H H / - H —L - 4 I I Ii / I I 1 4 / ro 24 1 — - i 0 !�� �/!fir/�l�/!��/ ... . !,�, . ... ,.. i��ii // 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 100-yr Rainfall=7.93" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 53 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1S: Pre Conditions Runoff Area=12.540 ac 0.00% Impervious Runoff Depth>3.50" Tc=24.8 min CN=65 Runoff=46.61 cfs 159,437 cf Subcatchment2S: Culvert 1/West Ditch Runoff Area=3.360 ac 0.00% Impervious Runoff Depth>3.61" Tc=25.9 min CN=66 Runoff=12.54 cfs 44,018 cf Subcatchment3S: East Ditch Runoff Area=3.090 ac 0.00% Impervious Runoff Depth>3.39" Tc=27.1 min CN=64 Runoff=10.54 cfs 38,048 cf Su bcatchment 5S: Drainage Area to Basin Runoff Area=1.630 ac 0.00% Impervious Runoff Depth>3.10" Tc=5.0 min CN=61 Runoff=9.97 cfs 18,348 cf Subcatchment6S: Offsite DA Runoff Area=4.460 ac 0.00% Impervious Runoff Depth>3.19" Tc=20.0 min CN=62 Runoff=17.09 cfs 51,617 cf Subcatchment7S: Post Sediment Basin Runoff Area=8.620 ac 0.00% Impervious Runoff Depth>4.72" Tc=19.8 min CN=76 Runoff=48.67 cfs 147,773 cf Subcatchment8S: Rd-Side Ditch Runoff Area=7.560 ac 0.00% Impervious Runoff Depth>3.82" Tc=26.8 min CN=68 Runoff=29.32 cfs 104,966 cf Total Runoff Area = 1,797,286 sf Runoff Volume = 564,207 cf Average Runoff Depth = 3.77" 100.00% Pervious = 1,797,286 sf 0.00% Impervious = 0 sf Lyle Creek Basin Flows Type II 24-hr 100-yr Rainfall=7.93" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 54 Summary for Subcatchment 1S: Pre Conditions Runoff = 46.61 cfs @ 12.19 hrs, Volume= 159,437 cf, Depth> 3.50" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=7.93" Area (ac) CN Description * 12.540 65 12.540 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.8 Direct Entry, TC-Basin Subcatchment 1S: Pre Conditions Hydrograph r 52_/ I I - li Runoff 50; — — — — ✓ 46.61 cfs 48 46yp II- 44i r ' - 1 1- I -I -h 440�21z T-1 bO r-Rai-rhfailt=7 93� - j H 1 1 —1 - - , - 38; 36��uln�ff- a�`• OC I 34 -Run�ff-Vot�u rrre= 9-43 c f_ 1 32; — LL 0 30 -Runoff-De th3. ' 28; 26t TC�14 min 1- I- I H I- I - H 4 - 0 24 201: _clo I1 1 / 7_ 184/ 14;16 12=' 1 H - H —LI 1 1 # ..,,, / 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 100-yr Rainfall=7.93" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 55 Summary for Subcatchment 2S: Culvert 1/West Ditch Runoff = 12.54 cfs @ 12.20 hrs, Volume= 44,018 cf, Depth> 3.61" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=7.93" Area (ac) CN Description * 3.360 66 3.360 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 25.9 Direct Entry, TC Subcatchment 2S: Culvert 1/West Ditch Hydrograph 14_/— J ■Runoff 137 12.54 cfs 12�T�p�1t 24 h r� H H - 11_ — _ I I 1��-�yr�tainfa�il �.93� I rt 10z Runoff IAr a_3.1!0 Ac J - m ff V ' u e-44 1 - 8� -Ru-noff Dept1P3..61 1/ 5 /—C'N=166-1 H4 4 - 21/ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 100-yr Rainfall=7.93" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 56 Summary for Subcatchment 3S: East Ditch Runoff = 10.54 cfs @ 12.22 hrs, Volume= 38,048 cf, Depth> 3.39" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=7.93" Area (ac) CN Description 3.090 64 3.090 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.1 Direct Entry, TC Subcatchment 3S: East Ditch Hydrograph — — — 2 Runoff 11 Y 10.54 cfs 10_; Tkp1t1244hr- J 9y 1 be- taiinfal l=7 9 ' I 8� I3u-n0f,Arga=3.Q90 ac Rfu-n gaff Il u m e 8 048-e f 6 Runoff Depth>3 9" — - Tc—= 7'` resin00 51/ 1 1 4- 3_/ 217 _ o //���!/��/� ��/���/���/���/���//�,ii!!. .,,, ,, .,,�. . ,, 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 100-yr Rainfall=7.93" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 57 Summary for Subcatchment 5S: Drainage Area to Basin [49] Hint: Tc<2dt may require smaller dt Runoff = 9.97 cfs @ 11.96 hrs, Volume= 18,348 cf, Depth> 3.10" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=7.93" Area (ac) CN Description * 1.630 61 1.630 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, TC Subcatchment 5S: Drainage Area to Basin Hydrograph 11 I ❑Runoff 9.97 cfs Tkp II124-hr F 97 1 b0-yr Faihfalll=tr.9t3" $� R u noff lArea 1.030 ac 7 IRunpff IV•uTe-18 348 61/ Runoff De th>3 10" 0 51/ T c= .0 LL 41/-dN=61 H- H- H - 3- 2-' 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 100-yr Rainfall=7.93" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 58 Summary for Subcatchment 6S: Offsite DA Runoff = 17.09 cfs @ 12.13 hrs, Volume= 51,617 cf, Depth> 3.19" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=7.93" Area (ac) CN Description * 4.460 62 4.460 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, TC Subcatchment 6S: Offsite DA Hydrograph 19 - ■Runoff 18 17.09 cfs 17 f124-ham I - 1615±= 1 b0-�fr FtainfaiI .9 1 1j an 3 o I ,4•4601ac / rt ffA a 12_ unp#f V_olume=51 fi17_cf if H rt ,ate Runoff Depth>3- 19' 9i/= Tc=10-0 n i n 8 7±/ d161 fi 0/ IH t = 50 1— —1 - fi - 4 H 2= H 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 100-yr Rainfall=7.93" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 59 Summary for Subcatchment 7S: Post Sediment Basin Runoff = 48.67 cfs @ 12.12 hrs, Volume= 147,773 cf, Depth> 4.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=7.93" Area (ac) CN Description 8.620 76 8.620 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.8 Direct Entry, TC Post Basin Subcatchment 7S: Post Sediment Basin Hydrograph 2 Runoff 50= Typ� 11_ 4 1 r 48.67 cfs 45= 100-yr Rairhfall=71.93 ' 40� Runpff i4r al.6 0 arc j 35 Run?ff LVolume=147�773 cf 4 301/ Runoff Depth>4.72" ' '— T�=1Mil min I 4 - 0 25-20�—CI=76 15- 10- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 100-yr Rainfall=7.93" Prepared by HDR, Inc Printed 8/27/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 60 Summary for Subcatchment 8S: Rd-Side Ditch Runoff = 29.32 cfs @ 12.21 hrs, Volume= 104,966 cf, Depth> 3.82" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=7.93" Area (ac) CN Description * 7.560 68 7.560 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.8 Direct Entry, Subcatchment 8S: Rd-Side Ditch Hydrograph 32/ ■Runoff 30�T 1-14 rH _H H I 29.32 cfs H H - 2s� 1 26/ 1 b0-ir I aifa11=7T93 I I I _ I I H H _ HZ/ —Ru119 )°` -T•5 1 1 1 ' H227 H 204/—Run?ffLVot�ume= // - w 184/ RunoffDe th 3.82' " 14:z —C14=08-1 H fi fi H 1 1 I H 1 1 H H 127- 10//— I / H I- I I I - -I 4 0 2� ///////// l��/1/l'/!��/1/�� ,.(:. ,,. . ... .,� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Duke Energy I Lyle Creek Switching Station Appendices C Appendix C — Stormwater Pipe Calculations Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Monday,Aug 26 2024 Stafford Culvert Crossing (Q10 min - Q100 max) Invert Elev Dn (ft) = 948.75 Calculations Pipe Length (ft) = 72.67 Qmin (cfs) = 3.20 Slope (%) = 7.22 Qmax (cfs) = 4.20 Invert Elev Up (ft) = 954.00 Tailwater Elev (ft) = Normal Rise (in) = 15.0 Shape = Circular Highlighted Span (in) = 15.0 Qtotal (cfs) = 3.20 No. Barrels = 1 Qpipe (cfs) = 3.20 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 11.26 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 4.37 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 949.10 HGL Up (ft) = 954.72 Embankment Hw Elev (ft) = 955.04 Top Elevation (ft) = 956.00 Hw/D (ft) = 0.83 Top Width (ft) = 42.00 Flow Regime = Inlet Control Crest Width (ft) = 20.00 Elev(ft) Stafford Culvert Crossing(Q10 min-Q100 max) Hw Depth(ft) 957.00 3.00 ME 956.00 2.00 ,, 955.00 _ r _ . . 1.00 ;op 954.00 r .00 953.00 -1.00 952.00- J --2.00 951.00 -3.00 950.00 -4.00 949.00 -5.00 948.00 -w= 4.23" illi --s.00 947.00 -7.00 0 5 10 15 20 25 30 35 40 46 50 55 60 65 70 75 80 85 90 95 Circular Culvert HGL Embank Reach(ft) Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Friday,Aug 23 2024 Rabbit Xing Culvert Crossing (Qmin 10Y - Qmax 100Y) Invert Elev Dn (ft) = 943.50 Calculations Pipe Length (ft) = 101.00 Qmin (cfs) = 4.96 Slope (%) = 0.99 Qmax (cfs) = 10.32 Invert Elev Up (ft) = 944.50 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 18.0 Shape = Circular Highlighted Span (in) = 18.0 Qtotal (cfs) = 4.96 No. Barrels = 1 Qpipe (cfs) = 4.96 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 3.33 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 4.76 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 944.68 HGL Up (ft) = 945.36 Embankment Hw Elev (ft) = 945.78 Top Elevation (ft) = 949.00 Hw/D (ft) = 0.85 Top Width (ft) = 51.50 Flow Regime = Inlet Control Crest Width (ft) = 0.00 Elev(ft) Rabbit Xing Culvert Crossing(Qmin 10Y-Qmax 100Y) Hw Depth(ft) 950.00 5.50 949.00 -4.50 948.00 3.50 947.00 2.50 946.00 1.50 Inlet con rd 945.00 0.50 Nli 1 944.00AillE ___---- .0 50 943.00 -1.50 942.00 -2.50 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 Circular Culvert HGL Embank Reach 00 Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Tuesday,Aug 27 2024 Culvert (Rd-Side + West Ditch) (Qmin:10Y Storm. - Qmax:100Y Storm) Invert Elev Dn (ft) = 914.10 Calculations Pipe Length (ft) = 64.45 Qmin (cfs) = 19.55 Slope (%) = 0.54 Qmax (cfs) = 41.23 Invert Elev Up (ft) = 914.45 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) = 19.55 No. Barrels = 2 Qpipe (cfs) = 19.55 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 3.72 Culvert Entrance = Groove end projecting (C) Veloc Up (ft/s) = 5.39 Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 HGL Dn (ft) = 915.66 HGL Up (ft) = 915.57 Embankment Hw Elev (ft) = 916.06 Top Elevation (ft) = 917.25 Hw/D (ft) = 0.81 Top Width (ft) = 28.00 Flow Regime = Inlet Control Crest Width (ft) = 32.00 Elev(ft) Culvert(Rd-Side+West Ditch)(Qmin:10Y Storm.-Qmax:100Y Storm) Hw Depth(ft) 918.00 3.55 917.00 2.55 91500 hintnnntrd 155 915.00 0.55 914.00 -0.45 913.00 -1.45 0 5 10 15 20 25 30 35 40 45 50 55 60 55 70 75 80 85 Circular Culvert HGL Embank Reach 00 Duke Energy I Lyle Creek Switching Station r)� Appendices D Appendix D — Stormwater Channel Calculations 41 East Ditch 11 Culvert 1 /West Ditch Subcat Reach on. Link Routing Diagram for Lyle Creek Basin Flows �____ Prepared by HDR, Inc, Printed 8/23/2024 HydroCAD®10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Lyle Creek Basin Flows Prepared by HDR, Inc Printed 8/23/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 2 Area Listing (selected nodes) Area CN Description (sq-ft) (subcatchment-numbers) 138,956 66 (2S) 142,006 65 (3S) 280,962 65 TOTAL AREA Lyle Creek Basin Flows Prepared by HDR, Inc Printed 8/23/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 3 Soil Listing (selected nodes) Area Soil Subcatchment (sq-ft) Group Numbers 0 HSG A 0 HSG B 0 HSG C 0 HSG D 280,962 Other 2S, 3S 280,962 TOTAL AREA Lyle Creek Basin Flows Prepared by HDR, Inc Printed 8/23/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 4 Ground Covers (selected nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) Cover Numbers 0 0 0 0 280,962 280,962 2S 3S 0 0 0 0 280,962 280,962 TOTAL AREA Lyle Creek Basin Flows Type 1124-hr 10-yr Rainfall=5.25" Prepared by HDR, Inc Printed 8/23/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 5 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment2S: Culvert 1/West Ditch Runoff Area=3.190 ac 0.00% Impervious Runoff Depth>1.71" Tc=25.9 min CN=66 Runoff=5.51 cfs 19,779 cf Subcatchment3S: East Ditch Runoff Area=3.260 ac 0.00% Impervious Runoff Depth>1.63" Tc=27.1 min CN=65 Runoff=5.20 cfs 19,331 cf Total Runoff Area = 280,962 sf Runoff Volume = 39,110 cf Average Runoff Depth = 1.67" 100.00% Pervious = 280,962 sf 0.00% Impervious = 0 sf Lyle Creek Basin Flows Type 1124-hr 10-yr Rainfall=5.25" Prepared by HDR, Inc Printed 8/23/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 2S: Culvert 1/West Ditch Runoff = 5.51 cfs @ 12.21 hrs, Volume= 19,779 cf, Depth> 1.71" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.25" Area (ac) CN Description * 3.190 66 3.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 25.9 Direct Entry, TC Subcatchment 2S: Culvert 1/West Ditch Hydrograph 6- D Runoff 5.51 cfs - T,p 1124-h r I 5-/ 1 b-y II- Rainfali=5!25 ' - I3unpff Ara=3.190 ac 4� I�un?ff Volume�1977�9 cf - TE_Runoff Dvpth> 1" 3-'' Tc= 5.6 min dN=I6B_ 2- 1 izzzzz 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type 1124-hr 10-yr Rainfall=5.25" Prepared by HDR, Inc Printed 8/23/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 3S: East Ditch Runoff = 5.20 cfs @ 12.23 hrs, Volume= 19,331 cf, Depth> 1.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.25" Area (ac) CN Description * 3.260 65 3.260 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.1 Direct Entry, TC Subcatchment 3S: East Ditch Hydrograph D Runoff 5.20 cfs 5:/"1413 2 hrs 1 b-ylr Riainfall=5125 ' 4:z Runoff Area=3.Z60-ac Run?ff Voilume=r19331 cf 3: Runoff D-epth>t63" Tc= 7. nil i n / 2-,HCN=165- iL // 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 100-yr Rainfall=7.93" Prepared by HDR, Inc Printed 8/23/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 8 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment2S: Culvert 1/West Ditch Runoff Area=3.190 ac 0.00% Impervious Runoff Depth>3.61" Tc=25.9 min CN=66 Runoff=11.91 cfs 41,790 cf Subcatchment3S: East Ditch Runoff Area=3.260 ac 0.00% Impervious Runoff Depth>3.50" Tc=27.1 min CN=65 Runoff=11.49 cfs 41,411 cf Total Runoff Area = 280,962 sf Runoff Volume = 83,202 cf Average Runoff Depth = 3.55" 100.00% Pervious = 280,962 sf 0.00% Impervious = 0 sf Lyle Creek Basin Flows Type II 24-hr 100-yr Rainfall=7.93" Prepared by HDR, Inc Printed 8/23/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 2S: Culvert 1/West Ditch Runoff = 11.91 cfs @ 12.20 hrs, Volume= 41,790 cf, Depth> 3.61" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=7.93" Area (ac) CN Description * 3.190 66 3.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 25.9 Direct Entry, TC Subcatchment 2S: Culvert 1/West Ditch Hydrograph 13 ■Runoff 11.91 cfs 12 T,p�41124,hr I P 1111 b0- r-Ftaibfall=7.9 " I J - 10 R4unpff,Arpa=3.1,90 ac - 1 —I - - 9 8 unpff,V urne741-99-cf- / 1 w 7 -Runoff Depth>361"- 0 6 Tc= 5 9 min I 4 - 5 dN='i66 I T 1:____ fi 1— — I — —I -r - 4 I I I I I I 31 _L 1 2 / 1 1 P 1 1 1 ,„ 0 , _...........i im pA.1 m..A im mil 0•----i v-, 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Lyle Creek Basin Flows Type II 24-hr 100-yr Rainfall=7.93" Prepared by HDR, Inc Printed 8/23/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 3S: East Ditch Runoff = 11.49 cfs @ 12.21 hrs, Volume= 41,411 cf, Depth> 3.50" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=7.93" Area (ac) CN Description * 3.260 65 3.260 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.1 Direct Entry, TC Subcatchment 3S: East Ditch Hydrograph /— — ■Runoff 121/ 11.49cfs 11��Yp�rtC2�hr J - 10� 1 be-�yr ainfa411=t -9tr -I -h 9/ F unpitArea 3. 601ac1 // I I I N 8 Run�ff IV ure-�41 �411 c / — Runoff Depth> 0 0 6� Tc-�7 '� min / ItN=1651 4� I — 3/ 1/ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Monday,Aug 26 2024 West Ditch - 10Y Storm Trapezoidal Highlighted Bottom Width (ft) = 2.00 Depth (ft) = 0.55 Side Slopes (z:1) = 4.00, 4.00 Q (cfs) = 5.510 Total Depth (ft) = 1.00 Area (sqft) = 2.31 Invert Elev (ft) = 914.47 Velocity (ft/s) = 2.39 Slope (%) = 1.00 Wetted Perim (ft) = 6.54 N-Value = 0.030 Crit Depth, Yc (ft) = 0.46 Top Width (ft) = 6.40 Calculations EGL (ft) = 0.64 Compute by: Known Q Known Q (cfs) = 5.51 Elev (ft) Section Depth (ft) 916.00 1.53 915.50 _ 1.03 915.00 V 0.53 /./t 914.50 0.03 914.00 -0.47 913.50 -0.97 0 1 2 3 4 5 6 7 8 9 10 11 12 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Monday,Aug 26 2024 West Ditch - 100Y Storm Trapezoidal Highlighted Bottom Width (ft) = 2.00 Depth (ft) = 0.78 Side Slopes (z:1) = 4.00, 4.00 Q (cfs) = 11.91 Total Depth (ft) = 1.00 Area (sqft) = 3.99 Invert Elev (ft) = 914.47 Velocity (ft/s) = 2.98 Slope (%) = 1.00 Wetted Perim (ft) = 8.43 N-Value = 0.030 Crit Depth, Yc (ft) = 0.68 Top Width (ft) = 8.24 Calculations EGL (ft) = 0.92 Compute by: Known Q Known Q (cfs) = 11.91 Elev (ft) Section Depth (ft) 916.00 1.53 915.50 , 1.03 'V' /// 915.00 0.53 914.50 0.03 914.00 -0.47 913.50 -0.97 0 1 2 3 4 5 6 7 8 9 10 11 12 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Monday,Aug 26 2024 East Ditch - 10Y Storm Trapezoidal Highlighted Bottom Width (ft) = 2.00 Depth (ft) = 0.53 Side Slopes (z:1) = 4.00, 4.00 Q (cfs) = 5.200 Total Depth (ft) = 1.00 Area (sqft) = 2.18 Invert Elev (ft) = 914.00 Velocity (ft/s) = 2.38 Slope (%) = 1.00 Wetted Perim (ft) = 6.37 N-Value = 0.030 Crit Depth, Yc (ft) = 0.45 Top Width (ft) = 6.24 Calculations EGL (ft) = 0.62 Compute by: Known Q Known Q (cfs) = 5.20 Elev (ft) Section Depth (ft) 916.00 2.00 915.50 1.50 915.00 1.00 914.50 _ - 0.50 914.00 0.00 913.50 -0.50 0 1 2 3 4 5 6 7 8 9 10 11 12 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Monday,Aug 26 2024 East Ditch - 100Y Storm Trapezoidal Highlighted Bottom Width (ft) = 2.00 Depth (ft) = 0.77 Side Slopes (z:1) = 4.00, 4.00 Q (cfs) = 11.49 Total Depth (ft) = 1.00 Area (sqft) = 3.91 Invert Elev (ft) = 914.00 Velocity (ft/s) = 2.94 Slope (%) = 1.00 Wetted Perim (ft) = 8.35 N-Value = 0.030 Crit Depth, Yc (ft) = 0.67 Top Width (ft) = 8.16 Calculations EGL (ft) = 0.90 Compute by: Known Q Known Q (cfs) = 11.49 Elev (ft) Section Depth (ft) 916.00 2.00 915.50 1.50 915.00 1.00 \N 'V' / 914.50 0.50 914.00 0.00 913.50 -0.50 0 1 2 3 4 5 6 7 8 9 10 11 12 Reach (ft) Duke Energy I Lyle Creek Switching Station Appendices E Appendix E — Sediment Basin Calculations 11 Sedime t Basin 2P Sediment Basin Subcat Reach Pon MU Routing Diagram for Sediment Basin Model Prepared by HDR, Inc, Printed 3/22/2024 HydroCAD®10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Sediment Basin Model Prepared by HDR, Inc Printed 3/22/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 2 Project Notes Defined 4 rainfall events from NC-Conover IDF Sediment Basin Model Prepared by HDR, Inc Printed 3/22/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 3 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 21.800 70 (1S) 21.800 70 TOTAL AREA Sediment Basin Model Prepared by HDR, Inc Printed 3/22/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 4 Soil Listing (all nodes) Area Soil Subcatchment (acres) Group Numbers 0.000 HSG A 0.000 HSG B 0.000 HSG C 0.000 HSG D 21.800 Other 1 S 21.800 TOTAL AREA Sediment Basin Model Prepared by HDR, Inc Printed 3/22/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 5 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 0.000 0.000 0.000 21.800 21.800 1 S 0.000 0.000 0.000 0.000 21.800 21.800 TOTAL AREA Sediment Basin Model Prepared by HDR, Inc Printed 3/22/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 6 Pipe Listing (all nodes) Line# Node In-Invert Out-Invert Length Slope n Diam/Width Height Inside-Fill Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) 1 2P 883.00 882.00 49.0 0.0204 0.013 18.0 0.0 0.0 Sediment Basin Model Type 1124-hr 2-yr Rainfall=3.55" Prepared by HDR, Inc Printed 3/22/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 7 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentlS: Sediment Basin Runoff Area=21.800 ac 0.00% Impervious Runoff Depth>0.92" Tc=33.0 min CN=70 Runoff=16.63 cfs 1.672 af Pond 2P: Sediment Basin Peak Elev=887.67' Storage=41,140 cf Inflow=16.63 cfs 1.672 af Primary=2.85 cfs 0.769 af Secondary=0.00 cfs 0.000 af Outflow=2.85 cfs 0.769 af Total Runoff Area = 21.800 ac Runoff Volume = 1.672 af Average Runoff Depth = 0.92" 100.00% Pervious = 21.800 ac 0.00% Impervious = 0.000 ac Sediment Basin Model Type II 24-hr 2-yr Rainfall=3.55" Prepared by HDR, Inc Printed 3/22/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 1S: Sediment Basin Runoff = 16.63 cfs @ 12.31 hrs, Volume= 1.672 af, Depth> 0.92" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-yr Rainfall=3.55" Area (ac) CN Description * 21.800 70 21.800 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 33.0 Direct Entry, TC Subcatchment 1S: Sediment Basin Hydrograph - - _ I I I I _ I I I I 18 -' ,_ 1 I I 1 I I I I I ■Runoff 17 1 I _ 116.63 cfs I 1 I 1 I 1 I 16 1 it I I 1 Type1r24*Ilr 15 - T2 14aitlfaNr410J-114O 13 -/ ,_ 1 I R i of A e_a 2 L.RO�J c - 12� 7 T 7 RanoffrVohume='t 672iaf 0 7 7 / 0 1 _Rtmofi Depth*0.94 9� I V —I 1 -r 1 T� 1.O 1111 n Li8- /+ww'' 7I � t _I I ± I 1hr1=7 O 6; ,_ - - -I - - I- 1 - - '- - + I I ov����. �1� „ ( . . , (, , . . ( I , _ 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Sediment Basin Model Type 1124-hr 2-yr Rainfall=3.55" Prepared by HDR, Inc Printed 3/22/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 9 Summary for Pond 2P: Sediment Basin Inflow Area = 21.800 ac, 0.00% Impervious, Inflow Depth > 0.92" for 2-yr event Inflow = 16.63 cfs @ 12.31 hrs, Volume= 1.672 of Outflow = 2.85 cfs @ 13.43 hrs, Volume= 0.769 af, Atten= 83%, Lag= 66.8 min Primary = 2.85 cfs @ 13.43 hrs, Volume= 0.769 af Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 887.67'@ 13.43 hrs Surf.Area= 17,360 sf Storage= 41,140 cf Plug-Flow detention time=202.5 min calculated for 0.769 af(46% of inflow) Center-of-Mass det. time= 110.3 min ( 943.2 - 833.0 ) Volume Invert Avail.Storage Storage Description #1 885.00' 75,443 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 885.00 13,481 0 0 886.00 14,882 14,182 14,182 887.00 16,340 15,611 29,793 888.00 17,854 17,097 46,890 889.00 19,425 18,640 65,529 889.50 20,231 9,914 75,443 Device Routing Invert Outlet Devices #1 Primary 883.00' 18.0" Round Culvert L= 49.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 883.00'/882.00' S= 0.0204 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.77 sf #2 Device 1 887.50' 36.0" x 36.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Secondary 888.50' 20.0' long x 4.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.38 2.54 2.69 2.68 2.67 2.67 2.65 2.66 2.66 2.68 2.72 2.73 2.76 2.79 2.88 3.07 3.32 Primary OutFlow Max=2.83 cfs @ 13.43 hrs HW=887.67' (Free Discharge) L1=Culvert (Passes 2.83 cfs of 20.01 cfs potential flow) L2=Orifice/Grate (Weir Controls 2.83 cfs @ 1.36 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=885.00' (Free Discharge) L3=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Sediment Basin Model Type 1124-hr 2-yr Rainfall=3.55" Prepared by HDR, Inc Printed 3/22/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 10 Pond 2P: Sediment Basin Hydrograph I I I I I I /L L L L L L _ ' _ _l _ ■Inflow / j / H L t _L _H116.63 cfs I •Outflow Inflow Area=21.80-0 ac o Primary 18� / / /- I- t t t -k - ❑Secondary 17" / / ' /- H 1- H H t t + -F Peak Elev=887.67' - / / /- - I- - I- - t - t - t - - t - - 154/ / / / /' T I- T T T T T Storage=41,140 cf �14 / // / /I I I I I I I I I I I I 13 -/ / / / /I I I I I I I I I I I I 124/ / / / /I I I I I I I I I I I I a 11 / / / /I c3 10 / / / /1_ I I I o 9i/ / / / /I L L L L L L 1 1 1 1 1 _E _ gam / / / 5_ / / / /- H I- H H -H ' 2.85 cfs / H — H H- / / n I- t t t t t 2 85 cfs r -i/K./ 3- A, 2-/ ./ % / o Y i / %.ii iiiiiiiiiiii 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Sediment Basin Model Type 1124-hr 10-yr Rainfall=5.25" Prepared by HDR, Inc Printed 3/22/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 11 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentlS: Sediment Basin Runoff Area=21.800 ac 0.00% Impervious Runoff Depth>2.01" Tc=33.0 min CN=70 Runoff=38.40 cfs 3.650 af Pond 2P: Sediment Basin Peak Elev=888.42' Storage=54,598 cf Inflow=38.40 cfs 3.650 af Primary=21.73 cfs 2.734 af Secondary=0.00 cfs 0.000 af Outflow=21.73 cfs 2.734 af Total Runoff Area = 21.800 ac Runoff Volume = 3.650 af Average Runoff Depth = 2.01" 100.00% Pervious = 21.800 ac 0.00% Impervious = 0.000 ac Sediment Basin Model Type II 24-hr 10-yr Rainfall=5.25" Prepared by HDR, Inc Printed 3/22/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment 1S: Sediment Basin Runoff = 38.40 cfs @ 12.29 hrs, Volume= 3.650 af, Depth> 2.01" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-yr Rainfall=5.25" Area (ac) CN Description * 21.800 70 21.800 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 33.0 Direct Entry, TC Subcatchment 1S: Sediment Basin Hydrograph + L _I I L L - I + I I L 42H - - 4 - -I - - I - - - - -I- - 1- - -I - - - I I 4- - ■Runoff 40H ,- - + - -I - - I + - _1 - - I 138.40 cfs I— —1 — — r — + I 1 n 4- — — 38 - - t - -I - - t - -1 - - I 0 -1 - - H - -H 7 T y "mp-II-L4 - 36 - - I r 1 34 - / 1-01 Yr Oa i}if al*54C�� _ 32� - N Ay 30 I I RU Fof_A ea�2t8n O ac v 1 I I l I I I 28_ r 26= 1 I I I RLtnoff IYb u ,e=3J6 -t a1 _ 2a : + 4 dI/ o Dp-th u 22; 020 - + I + -I + - I I- + T`+1=331m n - LL 18. - - t I t - H - - I- t - -I - - H - H I /I+w' t - 16 ,- - rt I 1- 1 ' 1 -r I C1 =i e - 14 -/ - - T 7 - T T I r 124-/ - I I I I II I 10 - 8H -61 I 1 - - I _ 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Sediment Basin Model Type 1124-hr 10-yr Rainfall=5.25" Prepared by HDR, Inc Printed 3/22/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 13 Summary for Pond 2P: Sediment Basin Inflow Area = 21.800 ac, 0.00% Impervious, Inflow Depth > 2.01" for 10-yr event Inflow = 38.40 cfs @ 12.29 hrs, Volume= 3.650 af Outflow = 21.73 cfs @ 12.60 hrs, Volume= 2.734 af, Atten= 43%, Lag= 18.3 min Primary = 21.73 cfs @ 12.60 hrs, Volume= 2.734 af Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 888.42'@ 12.60 hrs Surf.Area= 18,520 sf Storage= 54,598 cf Plug-Flow detention time= 100.8 min calculated for 2.725 of(75% of inflow) Center-of-Mass det. time= 39.6 min ( 856.6 - 817.1 ) Volume Invert Avail.Storage Storage Description _ #1 885.00' 75,443 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 885.00 13,481 0 0 886.00 14,882 14,182 14,182 887.00 16,340 15,611 29,793 888.00 17,854 17,097 46,890 889.00 19,425 18,640 65,529 889.50 20,231 9,914 75,443 Device Routing Invert Outlet Devices #1 Primary 883.00' 18.0" Round Culvert L= 49.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 883.00'/882.00' S= 0.0204 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.77 sf #2 Device 1 887.50' 36.0" x 36.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Secondary 888.50' 20.0' long x 4.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.38 2.54 2.69 2.68 2.67 2.67 2.65 2.66 2.66 2.68 2.72 2.73 2.76 2.79 2.88 3.07 3.32 Primary OutFlow Max=21.73 cfs @ 12.60 hrs HW=888.42' (Free Discharge) L1=Culvert (Barrel Controls 21.73 cfs @ 12.30 fps) L2=Orifice/Grate (Passes 21.73 cfs of 34.82 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=885.00' (Free Discharge) L3=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Sediment Basin Model Type II 24-hr 10-yr Rainfall=5.25" Prepared by HDR, Inc Printed 3/22/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 14 Pond 2P: Sediment Basin Hydrograph AL - - H - I- - 1- - t - t I - t - t - t - t - -F - -1 - -1 - - ■Inflow 38 40 cfs L L T T T l T •7 Prima ■outflow 42: / / z , / _ I In'TI�rea1-•0VV-aC - •Se ondary 40- / / / /- L L I- I- 1- 4 4 Vw - 4 Peak E1ev8.42 - 36t i i i I Storage=54,598 Icf 32 / i z /I L L L L L L / 1 1 1 1 1 I I 30� / / / /- - I- - I- - I- - 4 - 4 - 4 4 - I - I - 4 - 4 - - - - - - 28i/ i / / /- r L fi 1- 4 ® -r -r 7 rt rt rt 4 - 265" / i 7 i 1 I I I I 1 1 21.73 cfs I I I I I I I 24 zz /I L L L LI I 22� ! L 1 1 1 1 A A c20� / i z /- - I- - 1 - 4 - I- - I - / - 4 - 4 - 4 - 4 - 4 - -4 - - u- 18 --/ / / L L F I T /. ' 7 7 4 4 A A 16/ i i i i1 I I I I I 1 1 1 1 1 1 124-' / / / /1 LLLL - 10 i i , /I - - H - ♦- - 1 - � /ri��� -,������� hi' i i Z�� 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Sediment Basin Model Type 1124-hr 25-yr Rainfall=6.27" Prepared by HDR, Inc Printed 3/22/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 15 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentlS: Sediment Basin Runoff Area=21.800 ac 0.00% Impervious Runoff Depth>2.75" Tc=33.0 min CN=70 Runoff=52.94 cfs 4.991 af Pond 2P: Sediment Basin Peak Elev=888.98' Storage=65,059 cf Inflow=52.94 cfs 4.991 af Primary=22.92 cfs 3.643 af Secondary=17.06 cfs 0.426 af Outflow=39.98 cfs 4.069 af Total Runoff Area = 21.800 ac Runoff Volume = 4.991 af Average Runoff Depth = 2.75" 100.00% Pervious = 21.800 ac 0.00% Impervious = 0.000 ac Sediment Basin Model Type II 24-hr 25-yr Rainfall=6.27" Prepared by HDR, Inc Printed 3/22/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment 1S: Sediment Basin Runoff = 52.94 cfs @ 12.29 hrs, Volume= 4.991 af, Depth> 2.75" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-yr Rainfall=6.27" Area (ac) CN Description * 21.800 70 21.800 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 33.0 Direct Entry, TC Subcatchment 1S: Sediment Basin Hydrograph I I I — 1 I 1 I L — ■Runoff 55L/ I 1 52.94 cfs I 1 I 1 Imp 1 I de - ,— — 7 050� 45- -n 0 1 -251 7' OainfaII 6.47" — 40� s Ri rnof Atea=2t800 4ac 7 I 7 RurrofflrVolume=4.1991-af — .. 35= 1 1 RLnoff D"Ipth2/ Jrr — 3 30� 1 o _ 4— — 7 — I — — 1— — ' — IIIII t 7 — 1 — — 7 Tc1-331.0 m n — LL 25= 1 / /h�}. 20- 1 1 I 1 I 1�N=70 15� � 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Sediment Basin Model Type 1124-hr 25-yr Rainfall=6.27" Prepared by HDR, Inc Printed 3/22/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 17 Summary for Pond 2P: Sediment Basin Inflow Area = 21.800 ac, 0.00% Impervious, Inflow Depth > 2.75" for 25-yr event Inflow = 52.94 cfs @ 12.29 hrs, Volume= 4.991 af Outflow = 39.98 cfs @ 12.49 hrs, Volume= 4.069 af, Atten= 24%, Lag= 11.9 min Primary = 22.92 cfs @ 12.49 hrs, Volume= 3.643 af Secondary= 17.06 cfs @ 12.49 hrs, Volume= 0.426 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 888.98'@ 12.49 hrs Surf.Area= 19,387 sf Storage= 65,059 cf Plug-Flow detention time=82.2 min calculated for 4.069 af(82% of inflow) Center-of-Mass det. time= 31.4 min ( 842.1 - 810.7 ) Volume Invert Avail.Storage Storage Description _ #1 885.00' 75,443 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 885.00 13,481 0 0 886.00 14,882 14,182 14,182 887.00 16,340 15,611 29,793 888.00 17,854 17,097 46,890 889.00 19,425 18,640 65,529 889.50 20,231 9,914 75,443 Device Routing Invert Outlet Devices #1 Primary 883.00' 18.0" Round Culvert L= 49.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 883.00'/882.00' S= 0.0204 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.77 sf #2 Device 1 887.50' 36.0" x 36.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Secondary 888.50' 20.0' long x 4.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.38 2.54 2.69 2.68 2.67 2.67 2.65 2.66 2.66 2.68 2.72 2.73 2.76 2.79 2.88 3.07 3.32 Primary OutFlow Max=22.91 cfs @ 12.49 hrs HW=888.97' (Free Discharge) L1=Culvert (Barrel Controls 22.91 cfs @ 12.97 fps) L2=Orifice/Grate (Passes 22.91 cfs of 52.57 cfs potential flow) Secondary OutFlow Max=16.81 cfs @ 12.49 hrs HW=888.97' (Free Discharge) L3=Broad-Crested Rectangular Weir(Weir Controls 16.81 cfs @ 1.78 fps) Sediment Basin Model Type 1124-hr 25-yr Rainfall=6.27" Prepared by HDR, Inc Printed 3/22/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 18 Pond 2P: Sediment Basin Hydrograph - ❑Inflow i I I I 152.94 cfs I 1 ❑Outflow Inflow Area=21.800 ac ❑Primary - I I ❑Secondary /55- / / I- I- 1- r fi 1 d - F 1 Peak Elev=888.98' - / / I I I I I I I 50� , ' I I I 39.98cfs I Storage=65,059 cf 45 -/ / i[ I- r F T T T 'I T 7 7 7 7 F - 40-/ / /- I- I- /1 � - 1 _i - _i - - w 35i/ / i1 I I I I I 4 1 1 3o - i zz.e„� �� u- 25� / '� z 20� z i 1- ~ I- H t I 17.06 cfs t t - -r -r - - z „, / ///o 101! 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Sediment Basin Model Type II 24-hr 100-yr Rainfall=7.93" Prepared by HDR, Inc Printed 3/22/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 19 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentlS: Sediment Basin Runoff Area=21.800 ac 0.00% Impervious Runoff Depth>4.03" Tc=33.0 min CN=70 Runoff=77.88 cfs 7.330 af Pond 2P: Sediment Basin Peak Elev=889.42' Storage=73,894 cf Inflow=77.88 cfs 7.330 af Primary=23.84 cfs 4.741 af Secondary=47.44 cfs 1.656 af Outflow=71.28 cfs 6.397 af Total Runoff Area = 21.800 ac Runoff Volume = 7.330 af Average Runoff Depth = 4.03" 100.00% Pervious = 21.800 ac 0.00% Impervious = 0.000 ac Sediment Basin Model Type 1124-hr 100-yr Rainfall=7.93" Prepared by HDR, Inc Printed 3/22/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment 1S: Sediment Basin Runoff = 77.88 cfs @ 12.28 hrs, Volume= 7.330 af, Depth> 4.03" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=7.93" Area (ac) CN Description * 21.800 70 21.800 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 33.0 Direct Entry, TC Subcatchment 1S: Sediment Basin Hydrograph _ 1 _ _ L _ J _ _I_ _ L _ 1 _ _1 1 I 1 L - 854 I I I I I I I I I I I I _ ■Runoff 804/ I I I I 177.88 cfs I 1 1 I 1 I 1 I 75 1 I I I/ I I I I Type1r24*I1r 70 I 110 11 140017yr kal faN 7: 3" 654/ y 60� T T -1IRUnoffArea 2T.8O��ac 00 - 4- T I fi - ± I I T I 1 t 554 _ - + I 4 / 1 Runoff-Vokjme=7.13301af11 - • 45� _ t / 11:1 i1noff DOpth 4O3u 0 40� / �6131-0n T. 35� I I I I I 1 I 1 1 30� 1 I I 1 I 1 I L,IY—I/ o 25i" I I I 1 1 I 1 I T I T -1T I 1 T 20� T 1 1- —1I /- -r 1 1 1 - _k - -I - - 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Sediment Basin Model Type II 24-hr 100-yr Rainfall=7.93" Prepared by HDR, Inc Printed 3/22/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 21 Summary for Pond 2P: Sediment Basin Inflow Area = 21.800 ac, 0.00% Impervious, Inflow Depth > 4.03" for 100-yr event Inflow = 77.88 cfs @ 12.28 hrs, Volume= 7.330 af Outflow = 71.28 cfs @ 12.39 hrs, Volume= 6.397 af, Atten= 8%, Lag= 6.3 min Primary = 23.84 cfs @ 12.39 hrs, Volume= 4.741 af Secondary= 47.44 cfs @ 12.39 hrs, Volume= 1.656 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 889.42'@ 12.39 hrs Surf.Area= 20,107 sf Storage= 73,894 cf Plug-Flow detention time=64.0 min calculated for 6.397 af(87% of inflow) Center-of-Mass det. time=25.2 min ( 827.9 - 802.7 ) Volume Invert Avail.Storage Storage Description _ #1 885.00' 75,443 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) _(cubic-feet) 885.00 13,481 0 0 886.00 14,882 14,182 14,182 887.00 16,340 15,611 29,793 888.00 17,854 17,097 46,890 889.00 19,425 18,640 65,529 889.50 20,231 9,914 75,443 Device Routing Invert Outlet Devices #1 Primary 883.00' 18.0" Round Culvert L= 49.0' RCP, groove end projecting, Ke= 0.200 Inlet/ Outlet Invert= 883.00'/882.00' S= 0.0204 '/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.77 sf #2 Device 1 887.50' 36.0" x 36.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Secondary 888.50' 20.0' long x 4.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.38 2.54 2.69 2.68 2.67 2.67 2.65 2.66 2.66 2.68 2.72 2.73 2.76 2.79 2.88 3.07 3.32 Primary OutFlow Max=23.83 cfs @ 12.39 hrs HW=889.42' (Free Discharge) L1=Culvert (Barrel Controls 23.83 cfs @ 13.48 fps) L2=Orifice/Grate (Passes 23.83 cfs of 60.03 cfs potential flow) Secondary OutFlow Max=47.10 cfs @ 12.39 hrs HW=889.42' (Free Discharge) L3=Broad-Crested Rectangular Weir(Weir Controls 47.10 cfs @ 2.56 fps) Sediment Basin Model Type 1124-hr 100-yr Rainfall=7.93" Prepared by HDR, Inc Printed 3/22/2024 HydroCAD® 10.00-25 s/n 07102 ©2019 HydroCAD Software Solutions LLC Page 22 Pond 2P: Sediment Basin Hydrograph I- I- t- 4 _ - I 4 - 4 - 4 - 4 - 7 - 7 - _I - _I - - ■Inflow i r I- H H -L t 177.88 cis I -L -L -[ •Outflow � � ■Prima In oW Ar a= 1. G0 ac Primary — I— I— -H ■Secondary 80 -/ , / / /- - - - — — — V,.z8 cfs 4 — 4 Peatcfteir=889.42' - 75 ,/ i / / /- I- I- 11 4 4 4 - - 4 -I - 70 i ' , i- - I- - I- - A- - 1- - -h - t 0 - + - + Storage_F73,894-+Cf - 64/ / i ,- - F- - F- - - - - 4 I + - 4 - -I + - 4 - -I - -I - - 60 ' / / / /- - H - F- - 1 - 4- - 4- - 4 /I + - 4 - 4 - 4 - 4 - -I - 4 - - 55 -/ / / / /- - H - I- - -H - -H - -h - + + - 4 - 4 - -F - 4 - -I - -I - - w 504,,, / i z- 1- 1- t 47.44 cfs + t fi —[ —[ - � 45� - - r - r - t - r - Ø I fi - fi - fi - fi - -I - -I - -• 40� z r r r r trtrtrtrtrt4 - LL 35� • z /- r r r if 0 i' rt rt rt rt 1 1 - 304-" / / / r r r r r �. 1� rt rt rt rt 25 / / • / /- - r - r - r - r - -r ��ii ,, r - r - rt - rt - 1 - 1 - - / 1 - - 20; � / I- 104 i �����������������//�__����� 1� 10 , 5-: 7 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) RISER SEDIMENT BASIN CALCULATIONS 1-) Duke-Lyle Creek HDR PROJECT NO.:- DATE: 3/21/2024 BY: MDB REVISED: RVW: JP Riser Sediment Basin: Sediment Basin Scenario: Erosion Control Phase I Drainage Area Characteristics Required Storage Volume Total drainage area(TDA)1 18.65 ac 2 Yr Peak Flow(02) 16.63 cfs _ Disturbed area(DA) 7.33 ac 10 Yr Peak Flow(Q10) 38.40 cfs Req'd Min.Surface Area (435 sf per cfs of Q70)5 16,704 sf Req'd Min.Storage Volume (1800 cf per ac of DA)5 13,194 cf Design Criteria Basin Size Bottom Elevation 885.00 msl Elev.(msl) Depth(ft) Area(sf) Cumulative Volume(cf) Depth of Storage Volume 2.50 ft 885.00 _ 0.00 13,481 0 Depth of Flow over Riser(1 ft min)5 1.00 ft 886.00 1.00 14,882 14,176 Depth of Flow over Emergency Spillway 0.50 ft 887.00 2.00 16,340 29,781 10 Yr Storm Freeboard(1 ft req'd)5 1.00 ft 888.00 3.00 17,854 46,872 889.00 4.00 19,425 65,506 889.50 4.50 20,231 75,420 Basin Configuration Bottom Elevation 885.00 msl Sediment Storage Elevation 887.50 msl Riser Crest 887.50 msl Emergency Spillway Crest 888.50 msl Top of Berm 889.50 msl Skimmer Outlet Basin Size Check Desired Skimmer Drawdown Time(td)6 72 hrs Basin Surface Area Provided at Spillway Crest 17,097 sf Desired Skimmer Drawdown Rate(Qd) 4,398 ft3/day Basin Storage Volume Provided Below Spillway Crest 38,140 cf Skimer Size 3.0 in Head on Orifice(H)5 0.250 ft Calculated Orifice Diameter' 1.951 in Actual Orifice Diameter' 2.000 in 2.855844156 Actual Skimmer Drawdown Time' 69 hrs Riser and Barrel Spillway Design Riser Dimension,X"by X"(15 in min)5 36 in Riser Flow as Weir13 37.20 cfs Barrel Diameter' 18 in Riser Flow as Orifice74 43.33 cfs Barrel Invert Elevation 883.00 msl Barrel Length 40.00 ft Barrel Flow as Orifice14 18.54 cfs Barrel Manning's N10 0.013 Barrel Flow as Pipe15 18.71 cfs Sharp Crested Weir Coefficient(C)11 3.1 Orifice Coefficient(C)12 0.6 Controlling Flow through Riser and Barrel Spillway 18.54 cfs Emergency Spillway Design Minimum Allowable Spillway Length16 20 ft Difference b/n 10 Yr Peak Flow and Riser/Barrel Flow 19.86 cfs Broad Crested Weir Coefficient(C)17 2.80 Design Spillway Length13 21 ft Riser Concrete Anchor Design Length of Exposed Outlet Pipe 6 ft Buoyancy78 2066 lbs Concrete Anchor Width 6.0 ft Weight of Concrete Anchor 7830 lbs Concrete Anchor Length 6.0 ft Concrete Anchor Thickness 1.50 ft Safety Factor19 3.8 Page 1 of 1 Duke Energy I Lyle Creek Switching Station Appendices F Appendix F — Earthwork Calculations EARTHWORK CALCULATIONS Lyle Creek PROJECT NO.: 41716222 DATE: 1/23/2024 BY: PP REVISED: 03/12/24 RVW: MDB Base Surface: Existing Comparison: Proposed SITE DATA TABLE I CUT (CY) (+) FILL (CY) (-) NET (CY) VOLUME FROM CIVIL 3D I 42329.0 32654.0 9675.0 STRIPPINGS SQUARE FEET THICKNESS (FT) CUBIC FEET CUBIC (SF) (CF) YARDS (CY) DISTURBED AREA IN CUT 150,242 75,121 2,782 % USABLE 696 75 % DISCARDED 2,087 DISTURBED AREA IN FILL 149,323 74,662 2,765 25 % USABLE 691 75 % DISCARDED 2,074 TOTAL DISTURBED AREA I 299,565 TOTAL STRIPPINGS HAULED OFF= 4,161 IMPORTED MATERIAL MATERIAL SQUARE FEET THICKNESS*(IN) CUBIC FEET CUBIC (SF) (CF) YARDS (CY) IMPORTED MATERIALS IN CUT ACCESS ROAD (CRUSHER RUN STONE) 17599 12 17599 652 0 0 0 0 - 0 0 0 0 - 0 0 0 0 IMPORTED MATERIALS IN FILL ACCESS ROAD (CRUSHER RUN STONE) 18940 12 18940 701 0 0 0 0 - 0 0 0 0 - 0 0 0 0 TOTAL IMPORTED MATERIAL (CY) 1353 SITE DATA TABLE I CUT (CY) (+) FILL (CY) (-) NET (CY) AFTER STRIPPINGS 39,547 35,419 4,128 IMPORT MATERIAL IN CUT(+) 652 IMPORT MATERIAL IN FILL (-) 701 % FILL FACTOR (+) ADJUSTED NUMBERS I 40,199 39,925 273 VOLUME TOTALS (Without Strippings) TOTAL IMPORT (CY) VOLUME TYPE YARDS GOOD 0 ADJUSTED CUT (+) 40,199 TOTAL 0 ADJUSTED FILL (-) -39,925 w/Strippings I 0 TOTAL (+ = CUT, - = FILL) I 273 TOTAL EXPORT (CY) GOOD 273.1 STRIPPINGS 4160.6 TOTAL 4433.8 " NOTE: The calculations presented above do not account for caissons, spread footings, mat foundations, basements, or any excavation associated with utility installation. These quantities are for estimation only and are not intended to represent final cut/fill values. Topsoil depth and fill factors are subject to change per Geotechnical Site Evaluation. Duke Energy I Lyle Creek Switching Station Appendices Appendix G — NCDEQ Post- Construction Stormwater Permitting Map Post-Construction Stormwater Permitting Map Identifies stormwater permitting authorities for development projects in NC.Use the SEARCH button to find a location or address,and then click on the map for guidance.NOTE:Please contact DEQ staff to determine if a property is within a watershed or area that requires special considerations(SA,HOW,ORW,Special Management Strategies). V LEGEND t 8 X County CATAWBA Where am I? CATAWBACO Permitting State Type Phase II MSI or UA Basis In Urbanizing Area or Phase II MSI Notes Inside CATAWBA CO Contact DWQ Central Office DEC Region Mooresville Category Phase II Area c< Phase I Info Subject to Phase =c . /✓ �o L`' Construct on SW n/f. �1 A y �'. Zoom to fq 7 ft 144,6 0 3011 . G H Appendix H — Rip Rap Outlet Calculations Stafford Culvert Tailwater = Normal Depth (Assumed for culvert analysis) = 4.23" < 0.5Do 0.5 Do = 0.5*15 = 7.5" 3 ° . , . 11i 1 1,': Outlet W = Do + La 90 `on iin 1 111 pipe I. IIIII IIIII 1 iiiiiiiiinn nlullll 1 .1' diameter (Do) 80 l 1. • 11II11111�1= I . lyi IIIIIIIIIIIII • A,.Iti1' La —s1 i i- .- -- ,. - II111111111 llAiin uunlluu �f,!�rn�ur T i lwater < 0.5Do ._ _. l-_ '-- uullul N iron lr r l — _ _-- - IIIIIII �aiill�'li �' �1 7C IIII * #,;i'lli!111' ' I a\ I �nou Ir a . ��. _ � j- I •�ill.lil�l' N pt - -_� _- 1 , 5;d:111F. ll' !III t P 60 I - 11111:r.r5■i '1 •YI■ O111 /.1111S,P111 1 II■ �� tr 1 �, �1 _Ti lbi 7 1IPi1 •. . , in egg _- r-- y r i:uai s um■ `,i roil • non■ J 5 I 6 '// roil/1111111111■ \(� _ _ _. _ MAI �, / Ir11111111II1111111 \� _ ___- -. - -I r� I!li pluwmunlnu� `h - 3 � 1111141111 11111 111111■ -I-- i umnuu■luu In ors, IU!;/r 4 40 +- ii►S+_+i—mmu1Ol D.i.,,IIWII_ uumu iwurunuu nl Ifinuauu,►ir �nii 111111111r -, i �i i 1111111111oraU,WSd■r l + cs1 _� a/%6V ��41111111111 IIII 56 IIII Ir1iiJ111IP174 ��� ill WIII",IP/IL 20 ��■ 111 1 MI� 1.5 }d-./:il l MN 1Pili rniiIluan=nI? l i I i�i ��iu� 2 — , ;jam'/�' % - - nnu ::nr■ tip"ir 3 La 9ft l r _MOW;1111111M1=1 I 1, .,lluir!�.�: w O I- 4 ME NM / i� • r lllll!d11;IL�ll;lln 2 N ��� NI I' — �! i111;1111r,111i141 •. Nom=EI ____ — �,' �'/.ii1111r im:. II `m SIM u _ / 11';iII', A.11.11.: IIII■ i ii�rll:no:millllllIII■ OttoiArA �:LaRII 1111i11illllllllllllll■ 1 — Vcc = �—il •iiiiin11111IIIIIIIIIIII■ - Q }` .I ' '�ry 4r �IIIIIIIIIII■IIIIIIIIII111■ il- � ii munuuuuunuum■ o -_ --- - v_20 , /I�� l_uuu innii unuuu■ �� ' IIIIIIIinin1 niiiiIIII■ �"'"' %�� IIIIII 1 11IIIIIIII■ 1 — — -- �, d50 - 0.6ft .11 v = 5 i'. .,1 it-0 3 5 10 20 50 100 200 500 1000 Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). FES-1.2 Outlet Protection V = 11.26 ft/s Do = 15" = 1.25 ft d50 = 0.6 ft = 7.2 ft = Class B Q10 = 3.2 cfs Width @ Pipe Outlet (3Do) = 3.75 ft La = 9 ft Width @ FES (Do+La) = 10.25 ft Rev.12/93 8.06.3 Rabbit Xing Culvert Per NCDEQ Manual, Appendix 8.06: Pipes that outlet onto wide flat areas with no defined channel are assumed to have a minimum tailwater condition unless reliable flood stage elevations. 3o . , . III l 1,!: . ,Y. 1 l I 1 -H.. Outlet W = Do + La 90 'im II 1 '• Ill i, nnuw 1 pipe ' ;nuluulil , diameter (Do) 80 ' iiiiiiri�ill� I . I;, 11 111111111111 • A,.ItiI/ La —+4 i - - .. -- ,. iiiiii l * fP!Iiir.Ir �u11u■ �f,!�r �ul� T ilwa__ter < 0.5Do 4..- - --- --._ _. -_ '-- Iuuu1 N11r1' r I--_- -- _ _-- 6 IIIIII 'aaii ii II �1 7 1 111 * APV/!111' ' 11 \ i_. _ Avower II r;1!;11011. .a dill , ° 1 -1 • . /.III!iP1 r1 .1 ' 11■11 �r ill 1 - - ptl. 7 ISIl,i1 ., . , 1111■11 VeC4 _ _ - 1 1�10 _- r_- y r /11I'i i 11111■11 ��� Il UM nnI■t �C�JCC\ SQ 1 M�■ =l=-- 6 '// M11/1uuu111■11 O\n - 111111111111 �� A 1 0 a'p r ►1ifiiI a mil mii=ii ,� nihr11111 11111 IIIIII■II r 11II11111111 IIII 111111!', 40 ` _+ I - I t.'i=►S tir���i�lu11111 D.4.,,u11ra IIPAPA 4 Iu1nu el,uurul F -� IIIIIIIII i1111S fiu711 .1911 4- "I- ►i Ilnl ,Iii :R1171ir3i 1 .% I 1 Ai- 11111IIIIIIIIIIIJP!;tl■11 E. 1 M uI - - L-`;% I �ri IIIIIII 1111Pdi'll[IM I ,; i - ._i//'I tnlJlll!Il:�11 11 III I m� i�.� P -il_1_ .IIi11III4IIII.il II:IA 20 0I rn■I� .1 II�� 1 .+di; � 1 1AlI� �'.',. � � 1 I lliililrin.,nP luelra l I�■/�It , .4.r%0L' 1 -I _ • IIIiIIi:ar IP. ti•' ir 3 La=11.25 ft 10 � uIIlI1�■�'r.II �in■■riMil �� � �1� I. -- a iArig ,1;1ap .6 ,�i �llli�il_ II r - _I '� /.�'r V:..11110!'..1 �Siil�■ �_I _ 4'. /'•'�II!III! I!i Wil II ■ 1l - MilliltlEili '":;,i1P lriil tl. e1 0 INION _ 1 / �� .•ii !inniLipm.. 11 2 N_II ■/�I MI I �! 111;IIIII,IIri1!ll! 11 �_11 ! _ i� I /0441111:11:11;1P4 mil 11 mml • - Ell — 1�I �•.,- �/IIIII;i11/fir �7 1■11 II ■/ I _1 / Ili.;,„�1:11:11.: IIII■11 U- =E II�1i■�i t �iiu ' 1 i� r�� 'l1P i�u;iiiiiiiiiiiiiiiii `�i�1 Ili _'I - {v�ffrr�' ''� .._I�. Co ��ir i.Il.�nmmnnnm■u � II It _— 1 li. ill ,,,, ..'�i� .Ir ,"���r-IIIIIIIIIIIIIIIIIIIIIiIuI■11 E II II 20. I;) a !tr 111111111M1 1111111111■11 II�� V- �� �'/' =� � 1111111111111111111111111■11 4) l - - /+ ` _ 11111 1 1 11'1111111■11 1 13 II- HI �� [ V c 15 - Li imp � ,/i4ll� Iboiioviioiit . I 1 IIII II■11 I Iji' ' 'H i i . i , 3 5 10 20 50 100 200 500 1000 Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). FES-7 Outlet Protection V = 3.33 ft/s Do = 18" = 1.5 ft d50 = 0.4 ft = 4.8 ft = Class A Q10 = 4.96 cfs Width @ Pipe Outlet (3Do) = 4.5 ft La = 11.25 ft Width @ FES (Do+La) = 12.75 ft Rev.12/93 8.06.3 Culvert @(Rd-Side Ditch + West Ditch) Per NCDEQ Manual, Appendix 8.06: Pipes that outlet onto wide flat areas with no defined channel are assumed to have a minimum tailwater condition unless reliable flood stage elevations. 3 . , . 11, l ll': I l I: IIII. Outlet W = Do + La 90� ' • • `IIII iim I I in ii 1, 1ul nul 1 pipe 111111illlllll .. ! diameter (Do) ' iliiiiiiikill� 1 ' it 80 111inium' .ii, 4lil La —' 1 f_ _ +. 11111111111 i, 11;!11:1r.1r1 I _ 111111111111 df,!d!111A1/1 T ilwater < 0.5Do -_ '-- mooiiiiiiin Nflrl'1r, �l 7C li IIII ,) it ril!f111' ' 11 ��. I 'Iill.lil/1' I� j- 4I1IdII' 'it= tOr =_� 1 .,i;iilll►.I,Ir'. !1111�� 0\PC 60 I — 'rir:li11�15Ir5 �I •111111 O /.illl!IPI 11 1 IIINII �� it 1 T i[ r _Ti pl• 7 r!illa •, . , 111In11 egg _- r-- y r "rill 5 uuu11 � 'll• Illil • 111111111� J 5I 6 '// r1151 lluuumlln • \(� _ 1=1 ,, ', / 1111111111111111111 In\c , .% v i!I1ri1111111111111111111i1n_ - _ 1 p a .r Juldunl nul uuuun —h /.r.CAr 1111111111111i1111 i1111111r5 ►' uuulnmmi !wan n 40 . 1 - sr�ri�mmlllm ,or.,,ulra 4 F Mill .m,uurul mem IIIIII111 111111ror_ AndiMiiiiiiiin ii iliii ir, �n i '• �� 111111111111/4111'JI!d111/ _9-... a - 1. I/i 11111111 IIIIP'ell,lllllP MINI - 1.- 1 ,� �. i1IIISulr'imlly III —� }d --' - MOM -!I_ ,11imISP!iiilrlll'd 20 �IIII� ■� 15 ..::i, l M I P1111111r0''i111r iijNrl1 till _ , ./�r- • IIIIIIii AP 11, 'l;''i/ 3 La=16 ft •*1017 ' -- �� L. — — _ IIII I ■I w /U`i I I' e`I III IIIIIMMIIII 10 mmilll��':%.11ill M�11111P�i1..��I r _ i * %�/i;��' IIIli .1: '' tr:iil __- N'. %�•'�II?III! I!i m�II im / —. • r 1111Clllrill:Ilill1i ; II N 0 M�II�� I �!� IIII:IIIII,IIISIi!ll! 11 2 Mil 11 - � - —,-�I��, � iiii:li kt;i e_, n111 Q ��/.iIIIU:111iP;;�]Ilr1111111 ��Il _I — / Iu':!: A.11,11.: 111111I1 :r ll_ __._� — , �� i ..0.4.,1. 'Slni!;ini liumu Nuru cz MIMIII . M Al. SL4Rll'al115lrallllllllll1111111 8_ wil T {v= it Mi�Sr /'d11:d111111111I11111111I111 -r II - if_.t`I- l�% Pr •�r�� �IIIIIIIIIIIIIIIIIIIIIIIIIIIIII CC i -' Milr■ii =2° /� liiiiiiiiii "ilii i s �� 1 - ' IIIIII1 111111111111111 �>.� _ i I�1I 1Illi IIn1111II,IiI MiIl11Iv_�o d� ,,/'' •:111.71.'Hh, 1. I ;� I t1 v s I —. 1 I 1 I , d50 - 0.4ft . I i; • '' ill - :,i 1 1 ... I • i .,I , I I I I I I •I 1 3 5 10 20 50 100 200 500 1000 Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). FES-5 & 9 Outlet Protection V = 3.62 ft/s Do = 24" = 2ft d50 = 0.4 ft = 4.8 ft = Class A Q10 = 18.92 cfs Width @ Pipe Outlet (3Do) = 6 ft La = 16 ft Width @ FES (Do+La) = 18 ft Rev.12/93 8.06.3 Sediment Basin Outfall 30 . , . I11 i il!: I l I II.�I�. Outlet W Do + La 90 `iiil iin I III II pipe I. ',milling 1 diameter (Do) I. -I jinn . - 1111111111111� 1 ,i 80 IIIIIIIIIIIIII �d�Siilil La —+1 1_ _ ,. 11111111111 " !I;!11;I111 I _ - 111111111111 df,!d!11111/1 T ilii__ < 0.5Do ,..- - --- --._ _. i-_ '-- uullul i.PrPlrlr i — _ _-- I_ inn 'eSIliot151' .�111 �tl 7C no , #,WAd1111' ' 11 a\� ;_. _. 1 Ii111So fP II ��. I •,il1AiIlI' IU 411111i►,11 .a II= <Pp 60 I — 'r 1;lin,r51n .I *VI o �11u!Inl hi l wm �� tr `—1 - j@ll _ _ ' p l• 7 WIN! .. . , m11111 egg y r "11:1 i 111111/1 � 'II roil 11111111II J 5 I - 6 '// UM 1111111111111u \(� I ,, ', / Ir11711111111111111III `1��� I__` '_' .a rioii ii111111iiiiii11111111 \v` - _ 1111111111 A 1 .�Q unWdlnll luu uu11W/ A 111111111111111111 ilIlird I/ �► uuwuuuu n1!an1 40 I I - i=►S+—+i—IIIIIIIIIl1I ,or'.,,hula 4 F uumu : �uemrul __ �4 ' , ,.4dou mm1111 J AIUIIIII:m ��I Illlll 111 IIIIIIP/'IIIJli/ N. I '�� � Illlll IIIIIIIIIIISII dl�l1 . il I a -. 1. / �Ii IIIIIIII 1111P';dllll 111' 1 �` —� I 4 AJIII;IP!'i11 I -- .d --,.if- It .- 'I_ ,11101I'0;',uhI 111'A 20 �w�w�ww 1 �� , \5 ../:/. I�ii� I rlliilhlran,lIir tuJIvl1 —_—11_ _ , aii%.'M — — • 11111Nndr Il!�'ti• ,r 3 lilli :41*".•`1 La=10 10 IMM�IM.—;""I"'�n 000%dddmumkomIINII - 4 �. 1'�uiII?III! k; moo0 IMIMIMIIIIIIIIIIIIIII--� __. _ .. I �! '1111:111U Ilillt/I! •' 11 2 II 19.j) �� 01Eni _, i0E-4,r It 11;11111Ii1Rllr� 111 •NN- ...1,. /0""" . ,, /.iIIIU!dlliP:.;. I11111 — I /ir'lIV'Ilrlt!Iltllllll auto cis -r� — i �' MIMI . I -_-'- / �:Leiid:d iiiii1111111111I1111111 Q ow M. I — V=25 /`— r : �—i/ /'dICd1111111111111111111iiiimiimminimmil111 rairA :r i.._ p'n, / fir/CAI �1II1111111111111111111IIIII11II oC irt_. m imm v =v. f.•— � iiii miii"illiiiiiiiiiiiiii o - ,� - �p�,,.._. im — loll)I 1 1 i iiill ni II 1 -a 5-J ,lam - 1111I1 11111LIII11l:11 v�— uula�nEllunnnll d50 = 0.6 ft �� i I •.I -i 1 i 1 • • • •• I .- , 1 . I I HillI II. ., . , I I -1 0 3 5 10 20 50 100 200 500 1000 Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). FES-6 Outlet Protection V = 12.97 ft/s Do = 18" = 1.5ft d50 = 0.6 ft = 7.2 ft = Class B Q10 = 22.91 cfs Width @ Pipe Outlet (3Do) = 4.5 ft La = 10 ft Width @ FES (Do+La) = 11.5 ft Rev.12/93 8.06.3 I Appendix I — Silt Fence Calculations 0 r� ! 5_. . �, ,%/O\\\\ \l`1l\ \ \\ I� \I J( 4t\<rI I \l j\\\ 111\ \ \ \ \\ i rll �i� 0 A �L�>1V 1 t71 A 1 I) C AA \\tib�I I —A e' wags / \ b\\\ I II XI I 1 I �� \ II11 \\I ' I l �""',y1�' Q1� \V 11 �y v ((I1 �l l� 9 V w \ 1 I �v / 1\\\\\\ �\IIIII\\\\\�,\ \ \ C` �� � �Z. '��\ \ \\ l \ `\ 1\ \\ \�\ _-- �� 1 /- �,/ c i i , *NOTES: \>>III11 \\\\\ \ \ ) )RCP 1 ,1P r 7\ \\\\\\ 1111 \ \ \ \ / 1 )1 \\\\\ \\' -- \\ 4 @�, \l\\ 1 \ 1 \ \_— \ '\ -N\ \ \ \ ! // 7 7 / / P-�'1 1. REQUIRED SILT FENCE IS PER THE NCDEQ EROSION AND SEDIMENT \\\\ 1\ ` \ \ \ q \ pV \ \ \ \ \ \ \ \ \ 1 I J 1 / / CONTROL PLANNING AND DESIGN MANUAL,SECTION 6.62,WHICH 1 I l 1) ) \ \\ \ l 1 ` \ \\\ \ \\ \\\ \ \ ///NN \ \ 1 / / / \\\\ \\ \\ \��\ \\ 1 1 I I I I I / = P-'A' / 0.25 AC OF DRAINAGE AREA. \\\\ \:\ I/‘ 1 \° '-‘\\ \'\\*)\N k,S, \ 6,1-\‘ \ -'-'-:-.--' '-..-'4''' .--_.7' \1 `�.\ t \ \\ �\ - \\ \ \\ I\ \ \ \ . . . . . . . . . . . . . . . J/\\1jll, Il \ l \ \l\ .A\ \\ \ \��� _ \��'1\\ -\ \ \ \ \ \\ y.„2:2-‘,..\\\\ 1UW,\t9 \ -r`. i ' ''l'd \.- . . . - . . . cy%III IAAA\\ \ V 1' \ � � v vvv v vy v��A vt sus' w v N.v / ll\\\SILT FENCE C DRAINAGE AREAL `,�� \ \\ \ \ \• \\ ,,\„_-- :tee; \\ ,\W VMttS. / \ \ (1\ \ 1 AREA:0.44 ACRES \\\ \\\ \\ .a. / .>��r,,�\\ R'\ `\ �/� \ PROVIDED REQUIRED SILT FENCE 630 LF' , . ill, \ , i\ -- \ Gs,0 \ \ �� \ \ \ \ - SFWD. i /I 1 I`' �ql� 1 \ \ � �p+���'UU\�R a � "\ \ .\ f \ r ��A E aD?� a�+' �� \ �\ . . . . . . . . . . . . . . . . . V1e�(\Ntv�A�,C',., �'��IIG i►I = t�yi�vv !l \— A\\v Avg v vvA \ �i ° \`\ c•� IFS" Il..,e E �s° ` • bOA 7�. a CVA\t �� �\ � I0. �s ■ • /..,,)4' ♦� �vv vv ell A� % e�� A\\� W - -` ,....; ", ,--- \--\, )„ Ails,s -.`„-' \\ •:'-''.. --_„...-_,..----.4.. .\\,_-,_'...4...N.,S"---, ‘' \--'\ '--.,s\,-t1-'-'\\ t •.•.•.•.•.•.•.•.•.•.•.•.•.•.•. .•.•. ____, , \ ,' -, S-‘---- --•:,\,,\‘\\\ ifil.WAIgt, --\V '\\ _.•,.:-.0.:'--%--... .._,.....- -.,,,:;.... .......---.114_ ''''',."-s:4-. N A--,<\<„, --4../,_,,,, • • • • • • • •..,—• • • • • • )\\, 40..1,,c \_ __.,,,,4,, .-i•/41.4:''' .i.;$\: -.I..---_1:;...,-.-- --.:V)....-.,...S,i; _..... . \\\\\\4‘..;_,___T-_-:=1:-.\ --,;11.1k5_ Eye. T.4U1- w��\���, 5,1 #�� .,. . .l I . ,. v�v1ilAv�yvyy i 1Yv .. r �!�" ::� * _ �v�\%VA�ty _- ,fvI,,v" ', t' P• . ) :�' .1 �e�:° ���. ♦ ice. 4 . ,, k� -\\-`1 11 Milk Anil 'it•AN- s. • • /# �� v � � �/ ��� � � � A1� \ : % /v fi� � t � '�� i / fv 1\. . ._ ' 4 �V V � �1i vv � � �/ (�j��I 1'11; Eiii, f - \ I V A .. � � 1, .‘m .ft.iiiir , „.._ % �� _ :� ym. • • UM / � \ al soft♦r w P.To, aoD i \ \ - \------:-. f\ - II 51 a 9e / � .. Q A \‘. '�— �� \ \ \ ��— I 111 t 9. <N yf 1 • . . • . . . A A .� '� _v ���� VA '`ti I lA\�F V l�— oft��5 6a/ \ 'I '� , \q(G ��� _ \ \\',_,�`���_ � \\\ \\\4 \\ LLL I `�R/WJ . .4 ���.� vV� v ���� -\V`— ''� V�AV A A�tV A'�v1 III ' W` �I� \� S LT FENCE A DRAINAGE AREA \,\\ \ �� \_ A (.\\� 1 N ' ---- ' ' ...... ,---i\-........ _ - — :\-... N‘..\,,..;..1„.•,:, \.mi'` 'I$1, ,,,, -tr' REQUIREDAREA a5 LT FENCE 1.555 I `� '.'� � �`� s` '�' PROVIDED SLT FENCE I,586 LF�� \ F., \\l \ \`\=\`\ '�_-k \ \L IN aIIIIIIIIIIIIII.M.I . . . . . . . . . . . . . . .; . .- - 4.,;:etA *11N, 14 Rill' ..4 aiiiiiii ram _________- . . . . . . . . . . . . . . . • • • • •>• .. ��. �X V 11 a 'iC �ye�I J1\VAI o •...., 2.::,7,7, 1 ,,.1,:ifki‘ I4>�_ 97:. . 1 . j,e-zke,_______':" ::::!:..,,::,\;__ i • • • • ��4y �, c®_____— -____, • • • • • • • • • • • . 410i- --,t,,,,p-_,-•;'-';,‘ ft IN � � � � •= \ n AAA NIP • v V . .-a !\ 4 1I\ar 1 l -----\ •.. ' ' '• ' ' ' ' •••.• •.• • • • •••'' .144:4;A****7.44w44•611111:4*,,,,,irA47,0 , . • .... . . . '' 1 •...1.. •" \ 1 l Lu I Ct w..�� � 'i 0•`��►�► 4 . \ GRAPHIC SCALE et� / / /j7 Try U� \t (IN FEET) (31 CO . . . . . . . . . . �� ..���< $' cinch=f00 ft. al 7r al cr SEAL THIS DRAWING OR • PRELIMINARY TIRE SITE DEVELOPMENT 1 BILL OF MATERIAL IS ❑ AS BUILT pQ',��p AND,FunDENor BE �ntrea: SILT FENCE CALL EXHIBIT , 1-)1 HDR Engineering Inc. �.• LOANED.REPRODUCED of the Carolinas J THER WHOLLYOR ORINI PART, Company:N.C.B.E.LS.#F-0116 DUKE LOCATION. O Q- OR MADE PUBLIC,N LYLE CREEK SW STA 4., 440 S.Church St.Suite 1200 AAY M.4HNER WITHOUT ENERGY. CITY CONOVER couNrr: CATAWBA STATE: NC Charlotte,NC 28202-2075 �� THE WRITTEN phone: SHEET SIZE: REGION: STATION NUMBER: DRAWING NUMBER: REV 704.338.6700 OF DOKE ENERGY Date: ARCH D NC-SC 2089 44949890XXX00 0 BEFORE YOU DIG!CALL 811 G GORPORATIOA. FILENAME:4494989-SfLIFE/WEDWL FUSION FILE NAME:449498.9850V HDR Engineering, Inc. of the Carolinas 440 South Church Street, Suite 1200 Charlotte, NC 27601-3034 919.232.6600 NC License F0116 hdrinc.com © 2020 HDR, Inc., all rights reserved