Loading...
HomeMy WebLinkAboutNC0027286_CEI Response Letter_20240905This letter is in response to the NOV's at The Town of Stowing Rock Wastewater Treatment Plant acquired on 8/26/24. Permit Violation 1. We currently have Mc Oill, �)i 11 (Inginvoring firrr7, lemking at strategies and action to achieve con)pbonc e will) tho now ammotlill Irevnls. rhi�t wllotlirl Alsr) includO CAP for approval. Permit Violation 2. An electrician) has been contacted and is scheduled to begin ropairs r)n gpro.rator the week of 9/2/24. Permit Violation 3. The effluent composite sampler temperature was corrected the day of the inspection. It now measures 3 degrees Celsius. 8/25/24 A receptacle has been placed at the bar screen to collect screenings. The dumpster has been moved underneath shelter day after inspection 8/25/24 The clarifiers have been cleared of all duckweed. 8/26/24 Item of Concern 1. We now have a complete copy of the permit given by the inspector. Item of Concern 2. We now sign in and out on the daily log including time of entry and exit, and also name of operator. Item of Concern 3. The influent flow meter has been calibrated. 8116/24 Town of Blowing Rock Wastewater Treatment Punt ORC lames Townsend