HomeMy WebLinkAboutNCG110143_Inspection_20248030 nn
GOY COOPER
Gorenror
ELISABETH RISER
SPCYeIaIy '✓ '_�� I ' 2Cj
WILLIAM E.TOBY VINSON,JR. -.,,..
haerim Director NORTH CAROLINA
Environmental Qualify
August 30, 2024
City of Reidsville
Attention: Summer Woodard, City Manager
230 W Morehead St.
Reidsville, NC 27320
Subject: Compliance Evaluation Inspection
Reidsville WWTP
NPDES Certificate of Coverage—NCG110143
Rockingham County,North Carolina
Dear Sir or Madam,
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection we conducted at the Reidsville WWTP on August 28, 2024. Please note that in the
stormwater inspection report summary we ask that you update the Stormwater Pollution
Prevention Plan (SWPPP) to include the current list of spills, with notation confirming that no
spills have occurred. Additionally, please revise your records to reflect the accurate number of
outfalls observed during the inspection.
The report should be self-explanatory; however, should you have any questions, please
do not hesitate to contact Margeory Castellanos at (336)776-9724 or by E-mail at
Margeoi-y.castellanos@deq.ne.gov.
Sincerely,
amera Epli , PE
Regional Engineer
Land Quality Section
Enclosure: Compliance Inspection Report
c: Laserfiche
North Carolina Department of Environmental Quality I Eimsion of Energy,Mineral and Land Resources
Winston-Salem Regional Office 1450 Hanes Mill Road,Suite 300 1 Winston-Salem,North Carolina 27105
�'D E 336-776.9800
v«m c+w-+xw 11
`w'rc.�*.arwvaeq�
Compliance Inspection Report
Permit:NCG110143 Effective: 03/01/24 Expiration: 02/28/29 Owner: City of Reidsville
SOC: Effective: Expiration: Facility: Reidsville WIMP
County: Rockingham 407 Broad St
Region: Winston-Salem
Reidsville NC 27320
Contact Person:Josh Beck Title: Phone: 336-349-1042
Directions to Facility:
System Classifications: SWNC,
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
Related Permits:
Inspection Date: 08/28/2024 Entry Time 01:15PM Exit Time: 02:15PM
Primary Inspector:Margeory Castellanos Phone: 336-776-9800
Secondary Inspector(s):
Ashley J Vikara
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Municipal WWTP> 1 MGD, Stormwater Discharge, COC
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG110143 Owner-Facility:City of Reidsville
Inspection Date: 08/28/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On August 28, 2024, this facility was inspected to assess compliance. During the inspection, we met with plant
superintendent Mourice Brothers. The facility had most of the required documents in place, but the Stormwater Pollution
Prevention Plan (SWPPP)was found to be incomplete. Specifically,the SWPPP was missing the current list of spills(with
notation that no spills have occurred).
We visited all outfalls on the property and observed that there are more outfalls than what is currently listed in our system
Please update your outfall information to reflect the accurate number of outfalls.
If you have any questions or need further assistance, please feel free to contact me at(336) 776.9724.
Page 2 of 3
Permit: NCG110143 Owner-Facility:City of Reidsville
Inspection Date: 08/28/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑
#Does the Plan include a General Location (USGS)map? 0 ❑ ❑ ❑
#Does the Plan include a "Narrative Description of Practices'? N ❑ ❑ ❑
#Does the Plan include a detailed site map including outfall locations and drainage areas? N ❑ ❑ ❑
#Does the Plan include a list of significant spills occurring during the past 3 years? ❑ E ❑ ❑
#Has the facility evaluated feasible alternatives to current practices? ❑ ❑ N ❑
#Does the facility provide all necessary secondary containment? ❑ ❑ N ❑
#Does the Plan include a BMP summary? N ❑ ❑ ❑
#Does the Plan include a Spill Prevention and Response Plan(SPRP)? 0 ❑ ❑ ❑
#Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑
#Does the facility provide and document Employee Training? N ❑ ❑ ❑
#Does the Plan include a list of Responsible Party(s)? 0 Cl ❑ ❑
#Is the Plan reviewed and updated annually? E ❑ ❑ ❑
#Does the Plan include a Stormwater Facility Inspection Program? E ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑
Comment: See summary for more information
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑
Comment: See summary for more information
Permit and Outfalls Yes No NA NE
#Is a copy of the Permit and the Certificate of Coverage available at the site? N ❑ ❑ ❑
#Were all outfalls observed during the inspection? 0 ❑ ❑ ❑
#if the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ N ❑
#Has the facility evaluated all illicit(non stormwater)discharges? 0 ❑ ❑ ❑
Comment: See summary for more information
Page 3 of 3