Loading...
HomeMy WebLinkAboutNCC242719_Site Plan or Location Map_20240904 I vase A SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY 5a-' / \ \ \�'''''''',/-. NCGS 113A-54.11S AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR 4 ® / / ` \ -1 �� �\ \ CONSTRUCTION SCHEDULE COMPLETED AS AN EXCEL SPREADSHEET. � �� // ob m l necessary r and plan approv Erosion vaSediment Cov rol(e&6C)p rut a Certificate of Coverage AN ALTERNATIVE IS TO MAKE NOTATIONS ON HE COPY OF THE APPROVED / \ .......\ \ \\ plan)mast be obtained before any land permits b activities o¢Pr.A copy of the ion, permit,the COC and a Fab copy of Me EROSION AND .� mmt be kept vnsim,PrefmblyivE permiiltfen endazforcededodog inspection, SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A 2.Install gaveland cttles.go eouaoces£bMm si¢Gmws,re road silt farina NCAC 04B.0131 STATES THAT"...DOCUMENTATION SHALL BE ACCOMPLISHED BY 1\ / outlets and wattles. INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE _ a ego \ 1 �/ \ 3.Finish clearing and grubbing any necessary areas on Me lots as they are started. APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, "� / N. \ \ \\\\\� C.Been lot grading and excavationI,ecthmes DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, �Fo'� iBegio or eooevue wiM House<ooswc' PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION $' S4A0 10 / 6.Finish all mugM1 grading and house mnattuctiovs All areas nM dismrbM rot]days needs m M1ave temporary or permanml CONTROL PLAN.• 'b ° ,p° 9 _ \ \� gmmmoverinaalm. .Ina Wlddeeways,wagsandpados. QS' -----. /J B.Begi!v gMing ofla areaz _ \ 9.Final graeemg,mulcM1ing and stabilizin%of roc In mart cases tM1ia will ivvolve tM1e installation of and on[M1e lOt.TM1e silt knce will iv place writ[he lot is soadea or ffiassvg is skbilizea aM likes bold. 'CO \ 10.The connacmr aM1ell conduct self-inspections of Ne erosion eM aedimmmtion control mwames and comp4k Me following SODDING O qy \ 11 \ \ combined self-inspection form found an Me DEMLR website V \ _heps://www.deq.nc.gov/abouUdivisiovs/energy-mineraland-laud-resumed/stormwakr/smrmwamr-pro®vm/vpdes-consvucnov-pmgmm • 11 1 CONSTRUCTION \ \\ \- Tvelve monlM1s ofcomplek inacecdov forme aM1Sll be kept ov site and available for inspetion et all timee.It is recommendeda ®: \ �O LIMITS \\\ copy be kept in a permits box.Ref G.S.I IJA-56.1 MrougM1 G.S.113A-5]Sections ISA NCAC OgA 0101 Mrougb ISA NGC 04E.0506 Gearel Permit NCG 010000 NPDES fin Cdvstrvctiov Acivitia. \ I I _ Il.6elr-insptttiana fgrerosion age udimenn+ion control measures are to be performed allure[once every seven wlendm days and •^'•' i I \ . \ \ witFin 24 M1oars ofvery min event of greater[M1anlinch.Any neWed repeim aM1all be made immediatelym maimsin measures as MONTRO$B ROAo SR 12j5 O �r i " aces.CgC�WyRO \11I I \ 12 ` a\ Rt3 I / of Plan Play. cr DEMLRw ruin he he o out view ectiwrecorecnv.I I � " CONSTRUCTION � cerMtteeo pJecte p port,tbepetmlttee shall vlelt LIMITS / "deg.nc.::0701"msu an e0pelectronic Noticeaftclo.00n(e-NOT1.A3120annval genemlpermitf will be cM1argedillialitilal cr'ItN,w .: � uvxl tlteeNOT hasbew idledout.SITE �' I j ,\� �'3 • // /1 ( ( C__ ___ __ ___ __ _____A ,w 5� 9� - m .Fs l - :r - - �� - /41lPillre44:40PIHP�;h / \�° - eCp 3/ id SPACEN Now...3EJ.�I Nor - _ LYTn w.taatnAOamx(my 37 = o A �� _ J u,7 m" oIL coma. alp TM so LL Riaxl,al. Mnwee o a sx-txa Z •\\ \ / \ / ill; AP j 11: EI s°nonxwOD ..�" < O I RANC OF GOOD SIvIcINT ' MAP "'N ,„,,,,,1Y""' \\ \\i -_ / / \ - �\ \/\ / I 396� YI I4�� xoxsvm. :o r \.S. / VA - / N - �; 24 23 ream omae r..r DATE: PAGE: g 1*". SILT FENCE aT 25 {`\� / v DATE: PAGE: MIN .� \ ) , I 26 \ , hP 64 iIIIIIIIIIIIIIIIIIIIIIIIIiJ / ,,i. a D E F N _ • AsovE rnE Too // �30 / I r / / qv ¶ D -' x- R d' Ji I ✓! ✓! `L 1l TNswnsNEDs 1 \� //2 - - (47 J I Ohs / 19 4 1I ll Il �' 1Hous HOUSE AY HARMIRE FENCE DWARE CLOTH FRONT VIEW STEEL FENCE POST \\ ///\ - as I �� 27 See G / I, aA. =era a L_ n N ,. AY kDAr2_1,' J T 4� NBAI NR E \TER FABRIC. �� /� �� _/ 4 \ / WO" / G LCux Av/EOGEGFcuRe AY Note6: AY a `' ,. FILTER OF 457WASHED STONET E INTO SOLID GROUND oNINrRENCN �� / /off / l7ve / CURB GOundryand/1.If needed,Tree Proound Protecngtion should be i dinalled gaalongius the buffer zone,wetland �// 50 \ / bountlary and/or around protected trees,providing a radius of at least 1.25 feet for each D �:;' ,. e• / LEGEND inch of tank tlSinetar. gg NOTES: y SOST TEEL HARDWARE / 1 29 2.Install Silt Fence on the low elevation sides of each lot.Install Silt Fence outlets shown on "''a�'••s ON GROUND / /11 6chematiGtl'a and adjusted,if necessary,for points.If lots are +' :r 7 I 1.inches. H Hardware cloth and gravel should overlay the silt fence at least 12 \ / / / / N gram an jus a ry, placement at low contiguous and have different land owners or builders,each lot should have individual Silt . . Alt,*o=1C):11I e. be I j �° ®. Fen es. ...::s:o:.:.si.d:•i I 2.Stone outlets should ndplaced on low elevation areas of silt fence 3. • Install required Silt Fence whin 10 feet of property line to ensure there is no conflict with CONSTRUCTION`\ and based on Feld conditions. HARDWARE BURY WIRE FENCE AND I eURr I Ql/ 30/ / CURB INLET ENTRAId septic system.Itthe responsibility impact ttef the builderm and repairre installation of sediment MAINTENANCE: / '� \ central one Construction not septic be installed repair area(s). CLOTH Or 1.Per N r rainfall Inspect outlet le lest once a week and after each 1 Inch or I /. ry /.At least one Construction Entrance/Exit is to be installed per lot. nLrEN FABRIC IN TRENCH greater rainfall event.Complete any required repairs immediately. 5.Waste bins and other areas dedicated for managing building material waste shall be at 2.Freshen stone when sediment accumulation exceeds 6 inches. ry / / least 50 feet away from storm drain inlets or drainage ditches unless it can be shown that 3.Keep mesh free of debris to prOvitle adequate flow. // / ,9/ :D.. o other alternative exists.If this separation cannot be achieved,these areas must be 4.Remove sediment when half of stone outlet is covered. \ / A �- oontainetl behlntlSiltFence.5.ReDlacestone es needed to facilitate de-wa[erinA� 6.Inlentstloewnstreamoftllst eh'ances shoultl be ..\NC-Envirpmieu ui./pay secnoxwew / / / / / / protected;streets should be swept when s pte.ry. L___-- J SILT FENCE OUTLET / / 6edimento-DmFenc the enSiltFenceetlwyi,Constru,p / / y�' / \NC-Environmental.jpeg ].Dataiedon a Feional sh Fence Outlets,Construction EMmncas and otherenot measures are \` /// /// provided on additional sheets.Erosion and sediment control details are not drew,[o stele. °T€11:12.'202E TYPICAL LOT IAVOUT WITH CURB AND GUTTER \ \ // // / / -� ' , / % ATE: PAGE: DATE PAGE: I I 55 ,, \40 / s SIR S k/Wattle Silt S k/Wattle oTE: I \ BSI nGwy �I ba .I oM ega.aant...ion I / '� / Oa -•, . - ]l . ,- m may besubstmtedfor / I Q n= , III II""I.. s�nmm�y wire compost I �J�O A .QOG gJ'Mdt yTo 11 11 1 I \ / I f co, IT=n.II- 2. E - 12 2 2 t2 2 x 2 red length such Met logs do not deform. 356 OPEN ° / Qs). 'M h,' Stakes Slakes > () a Le ran ed parallelto -reo SECTION SECTION m„a;s�a�o GROUND STABILIZATION � \ drnat areas should be lo.tecl at the edge.theG SPACE �� \ \ /� ,y la.disturbance,T.ends[Lite silt SITE AREA STABILIZATION e y A,,ka+• �a a,M,.. sock(wattle() slightly DESCRIPTION TIME FRAME EXCEPTIONS \ / / ,'-,r .-ate t l PERIMETER DIKES, 7 DAYS NONE QJ I 6 Mn "`-11rtriacin,:inotnh:gpr.abv,e,01 ' `l� III, Ill din.x2- SWALES,DITCHES U / \ ZA ti;=:::: ':::"..t-,e-/ � W W ...4w &SLOPES kt, 3' \ ~`�.ti ~ ^�`ss nHIGH QUALITY 7 DAYS NONE ° - -`hha} Tren"n'n Min. ch,8 N.it te silt '" n WATER ZONES Wood Mulch or eom st ground A To 1/2 height of o9 s, In ...king-s no - 1- (HOW) 65E .� Construction: Maintenance: urvTRENCNED INSTALLATION R'N'm'o-`are Ogee° g j inspect et least once a week and after each 1 inch or ENTRENCHED INSTALLATION. used Ibehind thesilt 1.Clear the entrance and exit area of all vegetation,look,end other Db ecfonable Per NCG-01 '"'A•"`""MI`"n°"""°""" rBO""1V1A1XN1' iw,ema mkt shall reaa'gro°eve.. SLOPES STEEPER 7 DAYS IF SLOPES ARE 60 material and properly grader reater rainfall;make any required repairs immediately ISOMETRIC VIEW THAN 3:1 10'OR LESS IN 2.Place the gravel to the specific grade and dimensions shown on the plans,and l padlnacondition to prevent mud or sediment l'ii"1111:Sn''''''''': actorLENGTH AND ARE smooth it. mavin the construction site.This may require periodic NANC: 3.Provitla dreina a to ca water to a cetliment tra or other suitable outlet. with 2 inch stone. spect sltsacktwanle atIeaatweeoneCOMPOST ee«INIT.FLOW RATESn,inm n,geefar reinfall.Ram ` NOT STEEPER I a try p >dsinmalkd seaimem aria any aen as I�61 4.Use 9eo[eetile fabrics in order to improve stability of the fountlafion in locations 3. mate remove all ob t ble materials s II d,washe3 or avnv°ssreaI"`" tz rimto rum aaa manor,m,aaag°akna.. THAN 2:1, 14 .__ ' iec ions Piesn tFl Proteuee Orrimmet« ^200 (soon,,)Gilt)(soon) nmxanlemu.barapl.. doggeawDAYS ARE ir / subjacttoseepageorhighwatertable. roedweys. '° ALLOWED oak/° eu(=o i `mi iva`mi '+:° 'f«° 'r:« sLOPES s:1 oR 4 DAYS DAYS FOR 35a �. CONSTRUCTION ENTRANCE/EXIT wa,xAa fwane (dos m) (see mI (ado mI - FLATTER SLOPESGREATER;u�,'�z,„: ]:n ';ina'm0n =.," e'o..ns. g,L,ok aama>,.,.:g a:d.,,ell,NTHAN50'IN \Vim) Ii'/m> Iim/m) /m/m) Iim/ml eaaureeeesb�en°ce ma�amive�eorreae ` LENGTH �� 10. ALL OTHER AREAS 14 DAYS NONE(EXCEPT \ \ SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION WITH SLOPES FOR PERIMETERS �� I_ - FLATTER THAN 4:1 \ AND HOW ZONES) DATE: Wye Fence Filter Fabric PAGE: OPEN I \ / SPACE areal Post a.Max.Ears Standard fienhT nhout.mfen Wire Fence Woo Bockfill and Steel Post .... thoroughly General Erosion Control Notes • • • PAGE 1 of 2 Plastic or S ' I -�m 1.Only the areas shown shall be d'sturbed erg,. 2. All disturbed areas shall be grassed and TOTAL DISTURBED ACREAGE: 0.46 ACRES Wire tea r HPd, had as soon as possible and ma nto Hart ,mulched in. u t I pemanent cover s established. ` ) LOT EROSION CONTROL PLAN y ,. ,, ter'g eom d \ LOT 12 i Fabric / CAROLINA CROSSING Constructon: r 2.1.Construct sediment barrier a ex.strength synthetic filter RaaaaEGEa"VIEW MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION PHASE TWO sufficientmay impound volumes of water lure of the �re) Hig mn�a 3.Construct the>eaaly fasten the°eI rtiot onl la a+u'1wort post of Met minimum oveint,owhe neixttposh FOR strength naertsbdc bvvnre mean fastened securely to the uPsione a...Ppsn.Extend General-All measures will be inspectedand corrections made after runoff producing rainfalls, per weekanypaadverselyany a...re standardrt ° vpon to.bottom..trench,Fasten the Wire reinforcement,then mbrin on...Pe tpro g rain a s,or at least once minimum.The builder will insure that the construction activities on particular lot do not affect of the installed erosion control measures.If lot construction dictates,measures will be R. side of Me fen. ties should k:nyequre�pelnim alter relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. A&G RESIDENTIAL LLC M1POsuPO rtfencesis used.spase poets a maximum of a feet apart sulppors should be driven 2.Sh,,,,,,per.,r,c�of allseMmentfence collap,tear,decompose, secuGravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all restreng"OIfe ee..5rooPst;pacing does not requirea Are meshsupport.....dy objectionable materials spilled,washed,Dr tracked onto public roadways. QUEWHIFFLE TOWNSHIP HOKE COUNTY e.0050nMemlterfabricdirectlytoposts.Wereorplasticalptiesshouldha000elvmumof50paundtensua Remove eepressureonMe Slit Fence-Sedimentfencesshouldbeinspectedatleastonceaweekandaftereachrainfallevent.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure ALE:1n=1D a AUGUST 24 Excavate m y inches v e proposed line of Ma pasta and a e°ea°nom°k°°romevoieundarmimreMeferureaOring that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. SC UGUS 0 Exoa ins gen. osi kI di mRernoveSodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth GRAPHIC SCALE .Plane Inches of°iabac along the bottom and°Ioe of the Ire.. and Ming theaea m greaeland stabillizeln rlh°contributing 100 0 50 100 200 400 soil placed over Me filter tab.and compact.Thorough compaction ofthebsdaal is d drainage area has been properly stabilize, and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. oonmto silt Nnce scnsarm 0000 to 0 s. Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be = MMI 10. ° repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. existing Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height Removed ( IN FEET ) ..\NC-Envir-imentol.lee, SILT FENCE sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. 1 inch = 100 ft. JReinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes dogged with sediment Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE lfF-0106 LAST SAVED:0/0/2024 3AE PM LAST PLOTTED:8/8/2024 4:19 PM PLOTTED BY.Dennis Gilbert FILENAME:G\CORRENT JOBS\ANC RESIDENTIAL LLC\23-265S-02 CAROLINA CROSSING-EC\PLANS\CAROLINAXIN EC-LOTI3.D4/0