HomeMy WebLinkAbout20071638 Ver 2_Acceptance Letter_20080108O~O~ SAT ~RpG
~ ~
Q `C
January 8, 2008
EXPRESS REVIEW ACCEPTANCE LETTER
Garner Development Partners, LLC
Attn: Mr. Jason Hudak
263 White Oak Drive
Beckley, WV 25801
Subject Property: East Park Plaza
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
DWQ EXP# 07,1638v2
Johnston County
On January 8, 2008, the 401 Oversight/Express Permitting Unit of the Division of Water Quality received a
request from Mr. David Meyer of Protocol Sampling Service, Inc., regarding a project known as "East Park
Plaza" for acceptance into the Express Review Program. This letter advises you that your project will be accepted
into the Express Review Program once the following items are received:
1) The application fee of $3,000.00 [for 401 Water Quality Certification with minor impacts ($1,000) + Riparian
Buffer Authorization ($2,000)], made payable to the North Carolina Division of Water Quality];
2) One (1) copy of the completed PCN Addendum:
http://h2o.enr.state.nc.us/ncwetlands/documents/MicrosoftWord-PCN Addendum 10 O1 06 000 pdf
3) Five (5) complete and collated copies of the PCN Application;
4) Five (5) copies of all site plan information pertaining to this project (please refer to the PCN Addendum).
5) Three (3) copies of all supporting stormwater information pertaining to this project including
a. Entire site development/layout plans delineating all drainage areas;
b. Design calculation sheets for all proposed BMP(s) sized for both on-site and off-site drainage;
c. BMP supplements for each proposed BMP and Required Items Check List (available at
http://h2o.enr.state.nc.us/su/bmp forms.htm) along with all required items (this includes one (1)
original and two (2) copies of notarized Inspection & Maintenance Agreement for the stormwater
management facilities.); and
d. Detailed construction drawing sheets for all drainage, erosion and sediment control features, construction
sequence and planting schedule.
Thank you for your attention to this matter. Please keep in mind that the clock for this project will not start until
receipt of the completed application package and required fee are received. If the impacts are greater than
indicated on the Initial Interest Form and/or the services are different, you may be required to remit an
additional fee. If you have any questions or wish to discuss these matters further please do not hesitate to call Lia
Myott at 919-733-9502 or Joseph Gyamfi at 919-715-3473.
Sincerely,
r~
Cyndi B. Karoly, Supervisor
401 Oversite/ Express Review Program
CBK/lem
cc: File copy
David E. Meyer, Protocol Sampling Service, Inc., P.O. Box 31133, Raleigh, NC 27622
401401 Oversight l Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 I Internet: http://h2o.enr.state.nc.us/ncwetlands
None Carolina
tura!!y
An Equal OpportunitylAffirmative Action Employer- 50% Recycled110% Post Consumer Paper