Loading...
HomeMy WebLinkAbout20071638 Ver 2_Acceptance Letter_20080108O~O~ SAT ~RpG ~ ~ Q `C January 8, 2008 EXPRESS REVIEW ACCEPTANCE LETTER Garner Development Partners, LLC Attn: Mr. Jason Hudak 263 White Oak Drive Beckley, WV 25801 Subject Property: East Park Plaza Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality DWQ EXP# 07,1638v2 Johnston County On January 8, 2008, the 401 Oversight/Express Permitting Unit of the Division of Water Quality received a request from Mr. David Meyer of Protocol Sampling Service, Inc., regarding a project known as "East Park Plaza" for acceptance into the Express Review Program. This letter advises you that your project will be accepted into the Express Review Program once the following items are received: 1) The application fee of $3,000.00 [for 401 Water Quality Certification with minor impacts ($1,000) + Riparian Buffer Authorization ($2,000)], made payable to the North Carolina Division of Water Quality]; 2) One (1) copy of the completed PCN Addendum: http://h2o.enr.state.nc.us/ncwetlands/documents/MicrosoftWord-PCN Addendum 10 O1 06 000 pdf 3) Five (5) complete and collated copies of the PCN Application; 4) Five (5) copies of all site plan information pertaining to this project (please refer to the PCN Addendum). 5) Three (3) copies of all supporting stormwater information pertaining to this project including a. Entire site development/layout plans delineating all drainage areas; b. Design calculation sheets for all proposed BMP(s) sized for both on-site and off-site drainage; c. BMP supplements for each proposed BMP and Required Items Check List (available at http://h2o.enr.state.nc.us/su/bmp forms.htm) along with all required items (this includes one (1) original and two (2) copies of notarized Inspection & Maintenance Agreement for the stormwater management facilities.); and d. Detailed construction drawing sheets for all drainage, erosion and sediment control features, construction sequence and planting schedule. Thank you for your attention to this matter. Please keep in mind that the clock for this project will not start until receipt of the completed application package and required fee are received. If the impacts are greater than indicated on the Initial Interest Form and/or the services are different, you may be required to remit an additional fee. If you have any questions or wish to discuss these matters further please do not hesitate to call Lia Myott at 919-733-9502 or Joseph Gyamfi at 919-715-3473. Sincerely, r~ Cyndi B. Karoly, Supervisor 401 Oversite/ Express Review Program CBK/lem cc: File copy David E. Meyer, Protocol Sampling Service, Inc., P.O. Box 31133, Raleigh, NC 27622 401401 Oversight l Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 I Internet: http://h2o.enr.state.nc.us/ncwetlands None Carolina tura!!y An Equal OpportunitylAffirmative Action Employer- 50% Recycled110% Post Consumer Paper