Loading...
HomeMy WebLinkAboutNCC205500_NOT Closeout Documents_20240829 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville,NC 28115 (704)235-2100 County: Catawba Project: Marsh MAR-152 SW Basin& River basin: Catawba Person financially responsible:Duke Energy Carolina's,LLC-David Dellario, Project#: CATAW-2021-003 Project Director Address: 526 South Church Street,Charlotte,NC 28202 1. Project Location: 8320 NC Highway 150,Sherrils Ford Pictures: No 2. Weather and soil conditions: Sunny,70s,Workable soil Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Scott La Sala Title: Inspection report: Sent Report Date given/sent: June 12,2024 9. Corrective action needed: 10. Comments: 1.Any remaining measures can be removed at this time. 2.Adequate ground cover has been provided.Project is released from NC G01 requirements. 3.Total site time included multiple ESC projects. Reported by: Jason Moffitt Others present: Shannon Leonard Date of inspection: June 12,2024 Time arriving on site: 8:33 AM Time leaving site: 12:38 PM cc: