HomeMy WebLinkAboutNCC205500_NOT Closeout Documents_20240829 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 610 East Center Avenue, Suite 301, Mooresville,NC 28115
(704)235-2100
County: Catawba Project: Marsh MAR-152 SW Basin& River basin: Catawba
Person financially responsible:Duke Energy Carolina's,LLC-David Dellario, Project#: CATAW-2021-003
Project Director
Address: 526 South Church Street,Charlotte,NC 28202
1. Project Location: 8320 NC Highway 150,Sherrils Ford
Pictures: No
2. Weather and soil conditions: Sunny,70s,Workable soil Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Scott La Sala Title:
Inspection report: Sent Report Date given/sent: June 12,2024
9. Corrective action needed:
10. Comments: 1.Any remaining measures can be removed at this time.
2.Adequate ground cover has been provided.Project is released from NC G01 requirements.
3.Total site time included multiple ESC projects.
Reported by: Jason Moffitt Others present: Shannon Leonard
Date of inspection: June 12,2024 Time arriving on site: 8:33 AM Time leaving site: 12:38 PM
cc: