HomeMy WebLinkAboutNCC202708_NOT Closeout Documents_20240829 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 610 East Center Avenue, Suite 301, Mooresville,NC 28115
(704) 235-2100
County: Catawba Project: Marshall CAMA CAP Pilot Well River basin: Catawba
Person financially responsible:Duke Energy Carolina's,LLC-David Dellario, Project#: CATAW-2020-017
Project Director
Address: 526 South Church Street,Charlotte,NC 28202
1. Project Location: 832 NC Highway 150, Sherrils Ford
Pictures: No
2. Weather and soil conditions: Sunny,70s,Workable soil Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Scott La Sala Title:
Inspection report: Sent Report Date given/sent: June 12,2024
9. Corrective action needed:
10. Comments: 1.Any remaining measures can be removed at this time.
2.Adequate ground cover has been provided. Project is released from NC G01 requirements.
3.Total site time included multiple ESC projects.
Reported by: Jason Moffitt Others present: Shannon Leonard
Date of inspection: June 12,2024 Time arriving on site: 8:33 AM Time leaving site: 12:38 PM
CC: