Loading...
HomeMy WebLinkAbout090059_POA for freeboard_20240812PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 1 _ 5q _ �} County:i `75 Cr1C-i(!itn Facility Name: Wo-) -kr 23 /Va rwN Certified Operator Name: Operator # &a7/ Current liquid level(s) in inches as measured from the current liqui Structure 1 Lagoon Name/Identifier (D): Spillway (Yes or No): Level (inches): I 2. Check all applicable items d Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. V. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to Pumped and hauled is reflected in section III tables. Included within this plan is a list of the Proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality priorprior t=transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waster all, C9 Y _ I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best Of my knowledge and ability, the information is accurate and correct. All"I Phone:_1����5Z(7-��� Facility Owner/Manager (print) Facility Owner/Manager (signature) Date: PoA Cover Page 2121100 IL TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Walter B Nursery 9-59 line m = 162.9 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines I + 2 + 3 + 4 + 5 + 6 = 162.9 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. O. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 4598 2 bermuda 5.00 125.00 625.0 MarSe t uestimate on PAN** 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 625.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 162.9 lb. PAN x. Crop's remaining PAN balance (line v from section 111) = 625.0 lb. PAN y. Overall PAN balance (w-x) = -462 lb. PAN Line y must showas a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. Forpump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an optionfor lowering lagoon level, add these fields to the PAN balance table and recalculatethe overall PAN balance. Ifanimalwaste isto be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Will begin pu mping as soon asfield conditions allow. PoA (30 Day) 2/21/00 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Walter B Nurse 9-59 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 18.0 inches 19.0 inches 1.0 inches 79200 ft2 49368 gallons 180 days g. volume of waste produced according to structural design 19388 ft3 h. current herd # 2640 certified herd # 2640 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 3/1124 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 19388 ft3 0 ft3 14000 ft3 41624 gallons 1.79 Ibs/1000 gal. 162.9 Ibs. PAN PoA (30 Day) 2121/00