Loading...
HomeMy WebLinkAboutNC0032131_Response to Notice_20240903 RPB Systems Construction services•Contract Operations•Maintenance September 3, 2024 Ms. Jennifer Graznak NCDEQ Winston-Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston-Salem,NC 27105 Re: Compliance Evaluation with Notice of Violation NPDES NCO032131 Tweetsie Railroad Ms. Jennifer Graznak, This letter is in response to your letter dated 8-26-24 to Tweetsie Railroad attached. Per your letter we have taken the following steps and will continue to complete action requested as follows: 1. Flow meter/Composite Sampler flow proportional sampling. We have requested from the flow meter supplier and calibration service provider, Clearwater, to quote the hardware required between flow meter and composite sampler for flow proportional sampling. When we get this estimate we will proceed with order and install. I would assume this should be complete in the next 60 days or sooner. We will let you know when complete. 2. Current permit is on site. 3. Lab data, field calibration sheets, and chain of custody forms have been forwarded by our office. 4. Field parameter credentials are being kept at the site. 5. Sludge hauler records will be kept. 6. Chlorine contact chamber has been performed as stated. 7. We are continually making adjustments and working with the owner to ensure compliance. If you have any questions,please call anytime. Robert Barr P.O. Box 1325 Asheville,N.C. 28802 (828)-251-1900 (828)-251-1945