Loading...
HomeMy WebLinkAbout090169_POA for high freeboard_20240812�31 ��OI OF ACTION(POA) FOR HIGH FREEBOARD Ai ANIMAL FACILITIES t-acility Name: 9-i Iles? it FCucm S Certified Operator Name: CkCLY�eS G i llcs p Operator # r (.fa $6 Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structural Structure 2 Structure 3 Structure 4 Structure 5 Structure S Lagoon Name/Identifier (ID): Spillway (Yes or No): Level (inches):_ 2. Check all applicable items FtCal�slprl� Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. JLiquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the Proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 81 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct -t-('25 W &LTcfesp;e Facility OwnerfiVlanager (print) Phone: q16- 976.Ig02 e_ �ai'e'o, W,jdL 144 Date: Facility Owner/liilanager (signature) PoA Cover Page 2121100 II—TOTAL—VOLUME-0E-WASTE STORED WITHIN -STRUCTURAL —FREEBOARD ELEVATIONS — FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: Gillespie 2. structure ID: 3. structure ID: 4. structure ID: 5. structure ID: n.lines 1+2+3+4+5+6= o, line n 127154 = line I = 223737 gallons line I = gallons line I = gallons line I = gallons line I = gallons 223737 gallons 8.24 acre4nches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD' 2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type s. crop t acres u. remaining' IRR-2 PAN balance (Ib/acre) v. maximum application rate(in/hr) w. maximu m applicati on amount (inches) 1754 1 12 Dr lbermuda 1.6 100 0.4 1 1754 14 GrB bermuda 2.1 100 0.5 1 1754 15 Dr bermuda 9.2 100 0.4 1 1754 6 GrB bermuda 4 100 0.5 1 1754 8 Dr bermuda 1.6 100 0.4 1 1754 15 Dr bermuda 9.2 100 0.4 1 PoA (5 Day) 2/21100 x—totahcres-available during-5-day-draw-down-(sum of column t) = 27-.-70-acres IV. FACILITY'S POA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE Y. line o = 0.30 inches per acre to be applied within 5 days line x If unable to land apply hydraulic load listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, to 1. Describe moisture conditions of fields? (e.g. Is there water standing in Feld; does irrigation Irrigation will take place as soon as weatherand land conditions permit. c. UUM Lino amount or iast raimaii evenrr DATE: 08/11 /24 AMOUNT: inches etc.) 4. uiven opumum sou ano weatner commons, is irrigation equipment capable of applvinq the volume in as soil/fields dry out. 5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to Irrigate asweather and land conditionspermit. Will pump short times, ondryerfields. Hopetohave backto 12 bythe end of the weekend. Selling some of hogs on Thursday. PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/ldent'rfier(ID): I Gillespie 2. Current liquid volume in structural freeboard a. current liquid level according to marker 8.0 inches b. designed structural freeboard zone 12.0 inches Normally 12 inches or reater c. line b - line a (inches within structural freeboard) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 2666 certified herd # 3200 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h+ i +j) x 7.48 x 5 days/line f= 4. Total volume of waste to be land applied during 5 day drawdown I. total volume to be land applied line e + line k = 4.0 inches 78408 ftz 195497 gallons 180 days 105497 ft3 87892 ft3 ft3 48020 ft3 28240 gallons 223737 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2121100