Loading...
HomeMy WebLinkAbout090139_POa for high freeboard_20240815PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number. 1 9 /39 County. Nghn Facility Name: D&mEa* raYrA5 4 PC, PLC Certified operator Name: Na#Vn l%wam ()peretora# 1010319a 1. Current liquid level(s) in Inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level In the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure a Lagoon Namefldemf5er(ID): i Spillway (Yes or No): " Level (Inches): 8 2. Check all applicable items Liquid level is within the designed structural feaboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or morewructures. A 30 day Plan of Action is alllched. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN oordw of waste to . pumped and hauled Is reflected in section III tables. Induded'within this plan is a list of the proposed sites with related facility number(,), number acres and receiving crop Information. Contact and secure approval from the Division of Water Quality offer to transfer of waste to a she not covered In thefacllfgr's cartitied animal waste management plan. _ 6peration will ba partfatiy or fugy depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide faculty number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: St 15!'ay I. hefaby cartl(y.that t have reviewed the information Ibtad above and Included within the attached Plan of Aellon, and to the beat of my knowledge and ability, the IMorM4Wn Is accurate and aorreet qio- "- 8480 •s Phone: 910-87¢-1137 N Facility OwnerlManager IF LkNN- ? �) � -� Data: s'►s�a4 F mty ownedmana (sl re) PoAcoverpage ?MM II. TOTAL POUNDS OF PAN STORED WITHIN -STRUCTURAL FREEBOARD AND/OR 25 YR,/24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 9-139 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: n. lines 1+2+3+4+5+6= line m = 71.8 lb PAN line In = lb PAN line In = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN 71.8 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remalning IRR-2 PAN balance (Ib/wre) It. TOTAL PAN BALANCEFOR FIELD(Ibs.) Column rxs u. appllcfiw 5230 1A Millet 3.16 281.00 888.0 A rSe t 5230 1 B Millet 3.60 281.00 1011.6 Apr -Sept 5230 1 C Millet 3.23 182.00 587.9 Apr -Sept only used fields to make neg balance" 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 2487A lb. PAN IV. FACILITY'S PDA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 71.8 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 2487.4 lb. PAN y. Overall PAN balance (w - x) = 2416 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. Forpump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to anotherpennittedfacility, provide information regarding the herd population and lagoonfreeboard levels at the receiving facility. NARRATIVE: Will pump immediately. PoA (30 Day) 2121 /00 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 9-139 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 8.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 11.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 62016 ft� e. line c/12 x line d x 7.48 gallons/ft3 425223 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 79278 ft3 h. current herd # 0 certified herd #0 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines In + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 6/28/24 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) ft3 Offs 42656 ft3 53178 gallons 0.15 Ibs/1000 gal. 71.8 lbs. PAN PoA (30 Day) 2121 /00 II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 2. structure ID: 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: n.lines 1+2+3+4+5+6= o. line n 127154 = line I = 44898 gallons line I = gallons line I = gallons line I = gallons line I = gallons line I = gallons 44898 gallons 1.65 acre -inches III. TOTALACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD' 2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. ?Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type s. crop t. acres u. remaining IRR-2PAN balance (Iblacre) v. maximum application rate (infhr) W. maximum applicagmamount (inches) 5230 1A GbA Millet 3.16 281.00 0.5 1 5230 1 B GbA Millet 3.60 281.00 0.5 1 5320 1 G GbA Millet 3.23 281.00 0.5 1 x. total acres available during 5 day draw down (sum of column t) = 9.99 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE PoA (5 Day) 2/21/00 Y. line o = 0.17 inches per acre to be applied within 5 days line x If unable to land apply hydraulic load listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, E 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation are still wet. Will pump on dryer fields 2. Date and amount of last rainfall event? DATE: 08/11 /24 AMOUNT: —1-2 inches . �Ivvil w1ju lull, �Ulj allu Wodulul conmuons, is irrigation equipment capable o1 applvino the volume in line "n" at appropriate seasonal i.e. winter application rates within 5 days? yes assuming fields dry out and we don't get more rain. 5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts er irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to neet proposed changes in application rates and amounts and any other information for consideration _ flan to pump Friday and this weekend as conditions allow. PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier(ID): 9-139 2. Current liquid volume in structural freeboard a. current liquid level according to marker 8.0 inches b. designed structural freeboard zone c. line b - line a (inches within structural freeboard) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 12.0 inches 4.0 inches 62016 ft2 154627 gallons 180 days g. volume of waste produced according to structural design 79278 ft3 h. current herd # L—J certified herd #� actual waste produced = current herd # x line g = certified herd # i. volume of wash wateraccording to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = ft3 ft3 42656 ft3 8863 gallons 163490 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21 /00