Loading...
HomeMy WebLinkAbout090188_POA for high freeboard_20240812PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 9 1 � 8 Facility Certified Operator Name: Ur2Zdl nzuflg l tOperator l �c�r' �/' �j.16�� Current nujd levels) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 8 Structure 4 Structure 5 Structure e Lagoon Namelidentifier (ID): I Spillway (Yes or No): _ Level (inches): S 2. Check all applicable items County; laal,en Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day . Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included*Within this plan is a list of the Proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste:i f a� I hereby certify.that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Facility Owner/Manager (print) (signature) Phone: Cffr"���r`�—ll/?o, Date: 1 to lay PoA Cover Page 2121t00 il. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Bennet Place 9-188 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: n. lines 1+2+3+4+5+6= line m = 205.8 Ib PAN line m = lb PAN line m = III PAN line m = lb PAN line m = lb PAN line m = lb PAN 205.8 Ib PAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres a. remaining IRR-2 PAN balance (Ibfacre) L TOTAL PAN BALANCE FOR FIELD(lbs.) column r z a w' 1747 1 coastal Bermuda raze 2.48 100.00 248.0 Mar -Sep jMar-Sep 1747 2 coastal bernuda raze 3.20 100.00 320.0 1747 3 coastal bermuda raze 3.16 100.00 316.0 *' used only 3 field to meet PAN needed. Guestimate on PAN. 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 884.0 lb. PAN IV. FACILITY'S PDA OVERALL PAN BALANCE w. Total PAN lobe land applied (linen from section II) = 205.8 III. PAN x. Crop's remaining PAN balance (line v from section 111)= 884.0 Ib. PAN y. Overall PAN balance (w -x)= -678 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoonfreeboard levels at the receiving facility. NARRATIVE: WI I I begin pumping as soon field conditions are acceptable. PoA (30 Day) 2121/00 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Bennet Place 9-188 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design 18.0 inches 19.0 inches 1.0 inches 42076 fe 26227 gallons 180 days 44543 ft3 h. current herd # 6080 certified herd # 6080 actual waste produced = current herd # x line g = 44543 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/3/24 m. ((lines e + k)(1000) x line I = REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) �ft3 26133 ft3 88109 gallons 1.SD Ibs/1000 gal. 205.8 Ibs. PAN PoA (30 Day) 2/21/00