Loading...
HomeMy WebLinkAbout090150_POA for high freeboard_20240813PLAN OF QO V 90H (P-A) FOR HlIGH FREEBOARD AT ANC 1 AL F � Facility Number: 9 { i �� I�� � : Facility Nar�e: County: Certified Operator Name: INiIlle i ccs-N Operator Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid leve in the lagoon to the bottom of the spillway for lagoons with spillways. l LaStructure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 goon Name/Identifier (ID): Spillway (Yes or No): Level (inches): 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. ti% Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to Pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality to a site not covered in the facility's certified animal waste ma get»ent— cer ®e waste ian operation will be partially or fully depopulated. -- if animals are to be moved to attach a complete schedule with corresponding animal units and dates for depopulation ro freeboard levels and herd Population teforpthe receiv nglfacptyvide facility number, lagoon 3. Earliest possible date to begin land application of waste: 6/ I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Facility Owner/Manager (print) Facility Owner/Manager (signature) P Phone: Loll 06520- s I LI CI ®ate: 3 / 131�q PoA Cover Page 2/29/oo II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: ABK #1 9-150 line m = 957.1 lb PAN 2. Structure ID: ABK # 2 9-150 line m = 518.6 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. linesl +2+3+4+5+6= 1475.7 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN DPRInn nr% MAT I IST FIFI nS Tn WMICN DAM r:AMMnT RF APPI Ipn rN IRIMr: TFIIC 3n nAY pFRlnn o. tract # p. field # q. crop r. acres a. remaining IRR-2 PAN balance (lb(acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) u. application window' T4637 1 bermuda 25.15 100.00 2515.0 Mar -Se t T10981 any bermuda 29.20 100.00 2920.0 Mar -Sept State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 5435.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 1475.7 Ib. PAN x. Crop's remaining PAN balance (line v from section 111) = 5435.0 Ib. PAN y. Overall PAN balance (w - x) = -3959 lb. PAN Line y must show as a deficit. If line y does not showas a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If newfields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste isto be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Will begin pumping as soon as field conditions allow. PDA (30 Day) 2121/00 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier(ID): ABK #1 9-150 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design 14.0 inches 19.0 inches 5.0 inches 77395 ft2 241214 gallons 180 days 121058 ft3 h. current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line g = 121058 ft3 certified herd # 1. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period 1. current waste analysis dated 311/24 m. ((lines e + kX1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Oft? 51041 ft3 214550 gallons 2.10 Ibs/1000 gal. 957.1 Ibs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): ABK #2 9-150 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c, line b - line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 98350 ft2 e. line ell x line d x 7.48 gallons/ft3 61305 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 121058 ft3 h. current herd # F3672 certified herd # 3672 actual waste produced = current herd # x line g = 121058 ft3 certified herd # i. volume of wash wateraccording to structural design to j. excess rainfall over evaporation according to design 59600 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 225220 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 3/1/24 1.81 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 518.6 Ibs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below)