Loading...
HomeMy WebLinkAboutNCC242687_Site Plan or Location Map_20240903 A PPR(1VFf1 Fl1R ChNSTRIICTI('N I, Hj DATE'.. .., q Z , JECT N Mt3FR. 1-2 -00105 r)7 (R LO ii I L. , e U 1. S. r_l CHw���nn``LOTTE I NF FOR, TO : W 14 N NECI lENBURG PLAN VINit DEPARTMENT 8 I N� AL 2 I I- CJ m W Z E SUNSET LANDING re o � �' z -os CHARLOTTE, MECKLENBURG COUNTY, NORTH CAROLINA - ACCELA PROJECT#:LDCP-2024-00105, NCDOT PROJECT#:D-102-060-24-00024 3D 0 CONSTRUCTION DOCUMENTS o Hw W Tr VICINITY MAP o eL NOT TO SCALE x N, .W LL o O �rn Z Sheet List Table uE uE uE T of .a, DEVELOPER: ''oRtN CAR0I/,�; Sheet Number Sheet Title 1 _ _ ,a,OE JAYJEET,LLC o g?;pFOS/Q%141'%: OE -•- 13722 SUNSET BLUFF CIRCLE _ :'QQ 9�'•SEAL . C-0.0 COVER SHEET .53 _ LW ---111111=11 ---- �• 4 HUNTERSVILLE,PA NC 28078 S5352 •• PARESH TEL a 704 502-3490 yyfCVj{� C-0.2 SITE REZONING a. _ - it -p peterpatel64@live.com •.,fN EQ o��\\ ��® ` _ i sr - - Nser eoaa - _ a ( ) y4 CINE,:.0,.° C-0.2 REZONING PLAN d? C-1.0 EXISTING CONDITIONS&DEMO PLAN �""" rva�zre� `O -� �if'Ap;p�.0��� Q-2.0 SITE PLAN DESIGNER: ""'/,,,;II,IIII11`O c-2.1 FIRE COMPLIANCE PLAN I ®� -so GATEWAY DESIGN GROUP,PLLC 2024.07.26 12:09:44-D6'DD b I C-2.2 SIGHT DISTANCE PLAN&PROFILE 1 •MA6 Ii - +' - 8516 FOXBRIDGE DR WEDDINGTON,NC 28104 C-2.3 SITE DETAILS T I ' i"`" -w MARK DIAMOND,P.E.RY A C-2.4 SITE DETAILS I (919)@68-8867d D C-3.0 EROSION CONTROL PLAN-PHASE 1 / 4. mark gateway esigngroup.com a C-3.1 EROSION CONTROL PLAN-PHASE 2 591/5�r �/ - SURVEYOR:DB O C-3.2 EROSION CONTROL DETAILS Pro pTszssi�j�,;zs j ` CAROLINA SURVEYORS,INC. / PROP.RETAIL T� C-3.3 EROSION CONTROL DETAILS eel C1 P.O.BOX 267 _ / 0 (28,400 SF) A i PINEVILLE,NC 28134 cr.o GRADING PLAN �e4/ W - V@ m THOMAS WHITE,PLS C-4.1 STORM SEWER DRAINAGE MAP 2�; CO Im v (704)889-7601 c O tew@carolinasi.com Cd.2 STORM SEWER PROFILES I o LLB/ % 1- ,C. �'-"-1; ) - - m m Ow r MCRLv- - tar(Hcl LLC C4.3 STORM SEWER DETAILS 255/647 _ ^`° PL���I���,,� ,,� _Y/A d. I PAR oDB'o.T 29iz+5<P C-5.0 UTILITY PLAN NMAVA ois�eRis`""- / I J -�A�. L;... •V J I I I I �. ��44 C-5.1 SANITARY SEWER PROFILES&DETAILS 1,034 0 / \ c-5.z UTILITY DETAILS a 93426 / �� I SUNSET SQUARE I U C-5.3 UTILITY DETAILS / z C-6.0 LANDSCAPE PLAN I I 7 m L O C-6.1 LANDSCAPE DETAILS / I C Z Q N C-7.0 SWCM PLAN&PROFILE I // m I % C-7.1 SWCM DRAINAGE MAPS // SWCM-1 , I I U N C-8.0 SUNSET RD STRIPING PLAN � '��" _''' C-8.1 SUNSET RD IMPROVEMENTS // $()N 73 I C-8.2 SUNSET RD CROSS SECTIONS / SFT pGN0 E m I U) C-8.3 SUNSET RD CROSS SECTIONS BAN e C-8.4 SUNSET RD CROSS SECTIONS O C-9.0 TRAFFIC CONTROL PLAN O O ® � 1 W iii C-9.1 TRAFFIC CONTROL DETAILS ----{, u', - IeJ 41 /11 air ® n" F '--171 \ Z ...)- -,' 25 CqN' �� PROP.TOWHOMESirl Al © Q CO BUF ERAPE - T �1 I13 14 1© 16 0 118 I a a I o y�. ?�. //���i GREEN 1,..--:::,-- GRAPHIC SCALE -- s:- "•® - - ( IN FEET) U HORIZONTAL 1 inch=50 1L / GENERAL NOTES: j 1. EXISTING BOUNDARY AND TOPOGRAPHIC INFORMATION SHOWN IN THIS PLAN IS BASED UPON A COMBINATION OF A SURVEY PROVIDED AND GIS DATA.GATEWAY DESIGN GROUP DOES NOT REPRESENT OR WARRANT THE WORK PREPARED BY THE SURVEYOR. 22 2. THE CIVIL ENGINEER AND THE OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND/OR METHODS ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS. 3. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE TO ENFORCE SAFETY MEASURES OR REGULATIONS.THE CONTRACTOR SHALL DESIGN,CONSTRUCT,AND MAINTAIN ALL SAFETY STANDARDS,LAWS,AND REGULATIONS. 4.CONTRACTOR SHALL NOTIFY GATEWAY DESIGN GROUP 48 HOURS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION ACTIVITIES. 5. ALL LOCAL,MUNICIPAL,AND STATE LAWS,RULES,AND REGULATIONS GOVERNING OR RELATING TO ANY PORTION OF THIS WORK ARE HEREBY INCORPORATED INTO AND MADE PART OF THE PROJECT CONTRACT DOCUMENTS AND THEIR PROVISIONS SHALL BE CARRIED OUT BY THE CONTRACTOR. 6. DO NOT SCALE DRAWINGS IN THIS SET.ALL WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER THE SCALE SHOWN ON THE PLANS,SECTIONS,PROFILES,AND DETAILS.IN THE EVENT OF DISCREPANCIES,THE CONTRACTOR SHALL REQUEST CLARIFICATION FROM THE CIVIL ENGINEER AND/OR OWNER'S TO REPRESENTATIVE. ,� 7. IF DEPARTURES FROM THE PROJECT DRAWINGS OR SPECIFICATIONS ARE DEEMED NECESSARY BY THE CONTRACTOR,DETAILS OF SUCH DEPARTURES AND REASONS THERE OF SHALL BE SUBMITTED TO THE CIVIL ENGINEER AND/OR OWNER'S REPRESENTATIVE FOR REVIEW.NO DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE EXPRESS WRITTEN PERMISSION OF THE CIVIL ENGINEER AND/OR OWNER'S REPRESENTATIVE. % 8. THE SURVEYOR SHALL REPORT ANY ENCROACHMENTS OR DISCREPANCIES GENERATED BY THE SITE PLAN AGAINST ANY DEVELOPMENT REQUIREMENTS SPECIFIED BY THE SITE PLAN TO THE CIVIL ENGINEER AND/OR OWNER'S REPRESENTATIVE PRIOR TO ANY ACTUAL CONSTRUCTION. 6 9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF ANY WORK.THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CIVIL ENGINEER AND/OR OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES OR CONFLICTS. m % 10.ALL SUB-SURFACE UTILITIES IDENTIFIED ON THE CONSTRUCTION DOCUMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATION BASED ON SURVEY INFORMATION GATHERED FROM FIELD INSPECTION AND/OR ANY OTHER APPLICABLE RECORD DRAWINGS WHICH MAY BE AVAILABLE.THE CONTRACTOR SHALL CONFIRM THE 4 LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO COMMENCEMENT OF ANY WORK.THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CIVIL ENGINEER AND/OR OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES OR CONFLICTS. 11.THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING,COORDINATING AND PAYMENT FOR ALL NECESSARY LOCATING SERVICES INCLUDING INDEPENDENT LOCATING SERVICES.THE CONTRACTOR SHALL PROVIDE NOTICE OF EXCAVATION TO NOTIFICATION CENTER AND FACILITY OWNERS(PER NC STATUTE)NO LESS THAN 3 BUSINESS DAYS AND NO MORE THAN 12 WORKING DAYS PRIOR TO BEGINNING DEMOLITION,EXCAVATION OR ANY OTHER FORM OF CONSTRUCTION. = 12.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE RELOCATION OF ANY EXISTING UTILITY LINES REQUIRED TO COMPLETE ANY PORTION OF CONSTRUCTION.THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR THE COORDINATION AND COSTS OF THE RELOCATION AND ASSOCIATED WORK. 13.THE CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES,LANDSCAPING,AND FEATURES TO REMAIN ON AND/OR ADJACENT TO THE PROJECT SITE DURING CONSTRUCTION.THE CONTRACTOR SHALL REPAIR OR REPLACE,AT THEIR OWN EXPENSE,ALL DAMAGED ELEMENTS RESULTING FROM CONTRACTOR OPERATIONS OR NEGLIGENCE. g 14.THE CONTRACTOR SHALL BE RESPONSIBLE TO IMMEDIATELY REPAIR ANY ACTIVE UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT CONTRACTOR'S EXPENSE. 15.THE CONTRACTOR SHALL REPAIR ANY DAMAGE TO THE PUBLIC RAN(RIGHT-OF-WAY)IN ACCORDANCE WITH THE STANDARDS OF CDOT AND CITY OF CHARLOTTE. m 16.THE CONTRACTOR SHALL CONTACT THE UTILITY COMPANY TO RELOCATE/REPLACE ANY EXISTING UTILITY AND/OR LIGHT POLES.ALL EXISTING FACILITIES WHICH CONFLICT WITH THE IMPROVEMENTS UNDER THE SCOPE MUST BE RELOCATED AT THE CONTRACTOR'S EXPENSE. ...Ai I z 17.ALL TESTING SHALL BE PERFORMED BY A QUALIFIED TESTING LABORATORY,EMPLOYED AND PAID DIRECTLY BY THE OWNER.TESTING SHALL BE PERFORMED,AT A MINIMUM,IN ACCORDANCE WITH THE RECOMMENDATIONS IN THE GEOTECHNICAL REPORT.IN THE EVENT THE RESULTS OF THE INITIAL TESTING DO NOT 11211 COMPLY WITH THE PLANS AND THE SPECIFICATIONS,SUBSEQUENT TEST NECESSARY TO DETERMINE THE ACCEPTABILITY OF CONSTRUCTION SHALL BE AT THE CONTRACTOR'S EXPENSE.ELEMENTS FOUND TO BE DEFICIENT IN STRENGTH OR THICKNESS SHALL BE REMOVED AND REPLACED SOLELY AT THE EXPENSE OF �� PROJECT R:2023-012 DATE:7/26/2024 THE CONTRACTOR. wW W.nc811.0r9 DRAWN BY:MD CHECKED BY:JB m 18.PRIOR TO BEGINNING CONSTRUCTION,THE GENERAL CONTRACTOR SHALL VERIFY THAT ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED FROM ALL REGULATORY AUTHORITIES. I CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING TITLE 19.GENERAL CONTRACTOR SHALL MAINTAIN THE SITE IN A MANNER SO THAT WORKMEN AND PUBLIC ARE PROTECTED FROM INJURY. APPROPRIATE PARTIES AND ASSURING THAT EXISTING UTILITIES i 20.THE GENERAL CONTRACTOR SHALL CONTACT ALL OWNERS OF EASEMENTS,UTILITIES,AND RIGHT-OF-WAYS,PUBLIC AND PRIVATE,PRIOR TO WORKING IN THESE AREAS. s ARE LocnreoPRwRio BEGINNING CONSTRUCTION.CONTRACTOR IS RESPONSIBLE FOR PLACING Es USING COVER SHEET 21.ANY DISCREPANCIES FOUND IN THE FIELD SHALL BE CALLED TO THE ATTENTION OF THE OWNER OR ENGINEER PRIOR TO PROCEEDING WITH WORK. FLAG MEN,ETC.,AS NECESSARY TO INSURE SAFETY. m 22.ALL DRAINAGE FACILITIES,CURB CUTS,AND CURB RAMPS MUST BE CONSTRUCTED IN COMPLIANCE WITH THE NCDOT AND CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL AND COORDINATED WITH CITY ENGINEERING DEPARTMENT. A SHEET NO. 23.CONTRACTOR TO OBTAIN BUILDING DEMOLITION PERMIT AS REQUIRED PER ALL APPLICABLE REGULATIONS. DEPARTMENT or TRANSPORTATION AND LOCAL MUNICIPALITIES. j ...ALL STANDARD NUMBERS REFER TO THE LATEST EDITION OF THE CITY OF CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL AND THE NCDOT STANDARD DETAILS AND SPECIFICATIONS. PART4 SHORING WILL BE susPARTP, AMENDED ACCORDING TO NCHING STANDARDS C-U•0