HomeMy WebLinkAboutNCS000450_MS4 Annual Report (2023-24 FY)_20240830 NCS000450 CARRBORO 2024 ANNUAL SELF-ASSESSMENT
Line Reporting Year (July
BMP Ref. Measurable Goal Reporting Metric Comments
No. 1-June 30)
Did Carrboro submit the Annual Self-Assessment to NCDEQ prior to August
3 3 1 31? YES An original report was submitted on 2023.08.30.
15 3 3.8.1. Did Carrboro design/distribute pet waste outreach material? YES
16 3 3.6.1. Number of online hits on the pet waste web page? 53
Number of pet waste outreach materials handed out at events? Trifold brochures(37)
17 3 3.8.1. 80 Pet waste bag dispensers at outreach events(43)
Did Carboro participate in the Annual Town of Carrboro Kids Dog Show?
28 3 3.6.2. NO Event was cancelled due to weather
29 3 3.B.2. Number of people engaged in stormwater education at dog show? 0 Event was cancelled due to weather
38 3 3.6.3. Did Carrboro post outreach signs at public spaces? YES
39 3 3.8.3. Number of public outreach signs posted? 8 A pet watse sign was placed at each of Carrboro's Parks(8)
50 3 3.B.4. Did Carrboro install/update pet waste stations? NO
51 3 3.6.4. Total number of Town pet waste stations? 6
52 3 3.B.4. Total number of pet waste bags refilled? 6,000 Used 1 case of 30 rolls with 200 bags per roll
Did Carrboro post quarterly stormwater outreach via social media?
63 3 3.B.5. YES
How many social media posts were made? Facebook @ Town of Carrboro Stormwater(90 posts)
64 3 3.B.5. 176 Instagram @ townofcarrborostormwater(86 posts)
Did Carrboro coordinate volunteer storm drain marking events? (Completed/Current)Interested volunteer contact information collected
73 3 4.B.2. NO (IP)Researching new drain marking materials _
74 3 4.6.2. How many storm drains were marked? 0 _
75 3 4.B.2. How many storm drain marking events were held? 0 _
Did Carrboro distribute electronic mailing of targeted materials to
87 3 5.B.2. landscaping professionals? NO In-person material distribution occurred
Number of electronic mailings of materials to landscaping professionals?
88 3 5.B.2. 0 Landscape Guideline was distributed in person(7 flyers)
Did Carrboro distribute stormwater education materials to targeted
97 3 5.B.3. landscaping retailers? YES
Number of stormwater education materials distributed to targeted
98 3 5.B.3. landscaping retailers? 50 Two(2)retail locations(25 flyers)
Did Carrboro distribute stormwater education materials on landscaping at
109 3 5.B.4. Town events? YES _
Number of stormwater education materials on landscaping handed out at
110 3 5.6.4. Town events? 31 Materials were distributed at various town events(31 flyers) _
111 3 5.8.4. Number of hits to landscaping information page? 55
Did Carrboro update online materials to include stormwater in curriculum?
124 3 6.8.1. YES
Did Carrboro provide stormwater presentations in schools? We participated in outreach materials at school sponsored events and summer
125 3 6.8.2. YES camps.
Number of students reached through stormwater presentations in schools?
126 3 6.8.2. 532
139 3 7.8.1. Did Carrboro maintain CWEP membership? YES
140 3 7.6.2. Did Carrboro actively participate in CWEP events and meetings? YES
141 3 7.B.2. Number of CWEP events/meetings Carrboro participated in? 5
154 3 8.8.1. Did Carrboro maintain a stormwater web site? YES https://www.carrboronc.gov/287/Stormwater
155 3 8.8.1. Number of stormwater web site hits? 964
156 3 8.6.2. Did Carrboro update the stormwater web site content? YES
167 3 9.8.1. Did Carrboro update the Watershed and Stormwater Handbook? YES
Did Carrboro post the Watershed and Stormwater Handbook on the web
168 3 9.8.1. page? YES
Did Carrboro maintain a Stormwater Hotline phone number,email address,
181 3 10.8.1. and online form? YES
182 3 10.8.1. Number of emails to stormwater email address? 25
183 3 10.8.1. Number of phone calls to stormwater hotline? 21
184 3 10.8.1. Number of responses using online form? 25
205 3 10.8.2. Did Carrboro promote hotline at Town of Carrboro events? YES
206 3 10.8.2. Number of events where hotline was promoted? 14
207 3 10.8.3. Did Carrboro distribute hotline cards? YES
208 3 10.8.3. Number of hotline cards distributed? 29
209 3 10.8.4. Did Carrboro promote the hotline online? YES
Number of hotline promotions as social media posts,newsletters,etc.?
210 3 10.8.4. 4
Did Carrboro provide regular reports on stormwater activities for published
231 3 11.8.1. Council agendas? YES
Number of stormwater reports to Council?
Item covered under 11.8.2.Regular reports are not directed at this time.Division
does provide Monthly updates for the"Manager's Update"that Council and all
232 3 11.8.1. 0 town staff receive but these are more informational(12).
Did Carrboro provide information to Council to inform policy decisions
233 3 11.8.2. related to stormwater? YES
Number of stormwater agenda items prepared for Council? 2023.09.19 LASH Grant Request
2024.02.27 Public Hearing for Stormwater Fee Modification
234 3 11.8.2. 3 2024.03.19SWAC Appointments
Did Town staff attend and support Stormwater Advisory Commission
247 3 12.8.1. (SWAC)meetings? YES
248 3 12.8.1. Number of SWAC meetings? 9
Did Carrboro identify candidate public areas for volunteer clean-ups?
263 3 15.8.1. YES
264 3 15.8.2. Did Carrboro conduct volunteer clean-up events? YES
265 3 15.8.2. Number of volunteer clean-up events? 6
266 3 15.8.2. Number of volunteer clean-up participants? 68
267 3 15.8.2. Number of tons picked up? 2,500
Page 1 of 4
NCS000450 CARRBORO 2024 ANNUAL SELF-ASSESSMENT
Did Carrboro add new infrastructure to the MS4 map and GIS database as it
288 3 16.B.1. is constructed? YES
289 3 16.B.1. Total number of outfalls mapped? 54
290 3 16.B.1. Number of outfalls added this year? 0
291 3 16.B.1. Total miles of above ground infrastructure? 30
292 3 16.B.1. Total miles of below ground infrastructure? 21
Did Carrboro add new SCMs to the database and map as they are
309 3 17.B.1. constructed? YES
310 3 17.B.1. Total number of SCMs inventoried/mapped? 177
311 3 17.B.1. Number of SCMS inventoried/mapped this year? 2
324 3 19.B.3. Did Carrboro implement the IDDE Plan? YES
Did Carrboro conduct a review of the IDDE Plan,standard documentation,
forms,procedures and SOPs and make changes as necessary?
328 3 19.13.4. YES
Did Carrboro Review/update MS4 inspection areas using Illicit Discharge
335 3 20.B.1. Potential matrix? YES
336 3 20.6.1. Number of high priority subwatersheds? 2
Did Carrboro inspect a minimum of 20%MS4 per year(100%every 5 years)?
349 3 21.6.3. YES
350 3 21.B.3. Number of outfalls inspected? 14
Number of illicit discharges identified as a result of outfall inspections?
351 3 21.B.3. 0
Did Carrboro investigate reports of illicit discharges to determine sources?
364 3 22.B.1. YES
365 3 22.6.1. Number of potential illicit discharges reported? 17
366 3 22.B.1. Number of verified illicit discharges? 10
377 3 22.B.2. Did Carrboro halt illicit discharges and remedy illicit connections? YES
378 3 22.B.2. Number of illicit connections and discharges remedied? 10
Did Carrboro issue illicit discharge verbal and written enforcement,including
387 3 22.B.3. Notices of Violation and penalties? YES
Number of enforcement actions issued for illicit discharges or connections?
388 3 22.B.3. 3
395 3 23.B.1. Did Carrboro review IDDE program implementation and metrics? YES _
Did Carrboro document illicit discharges in accordance with the Illicit
Discharge Documentation SOP,including the Event Tracking spreadsheet CityWorks Reports created(when applicable).
402 3 24.B.1. and CityWorks? YES _
403 3 24.B.1. Number of entries in IDDE Event Tracking spreadsheet? 17 _
Did Carrboro review the illicit discharge database for potential chronic
412 3 24.B.2. violators? YES _
413 3 24.B.2. Number of established chronic violators? 2 _
Percent of staff members trained to identify and report potential illicit
425 3 25.B.2. discharges with a passing score? YES 28% _
Did Carrboro develop a written training plan and presentations for Town
employees,first responders,and contractors likely to encounter illicit
426 3 25.B.2. discharges? Partial (Completed/Current)Plan for staff and first responders. _
Did Carrboro train municipal staff to identify and report potential illicit
427 3 25.B.2. discharges? Yes
436 3 25.B.3. Percent of illicit discharges identified by staff? 23%
Number of flyers and educational materials with IDDE reporting information
443 3 26.B.2. distributed to Town personnel and public? 74
452 3 26.B.3. Did Carrboro track hotline and email communications? YES
453 3 26.B.3. Number of hotline emails and phone calls? 6 Count indicates potential IDDE-related reports only.
454 3 26.B.3. Number of inquiries leading to confirmed illicit discharges? 1
Did Carrboro review efficacy of stormwater email and hotline in identifying
illicit discharges with Town personnel at least annually?
463 3 26.B.4. YES
Number of municipal staff trained on proper handling of construction site
469 3 27.B.1. runoff control complaints? 37
Number of permitted development/construction sites with construction
474 3 29.B.1. waste management compliance oversight? 3
Did Carrboro track the number of low-density and high-density plan reviews
487 3 30 performed? YES
488 3 30 If so,how many low density project reviews were performed? 0
489 3 30 If so,how many high density project reviews were performed? 6
490 3 30 If so,how many low density project reviews were approved? 0
491 3 30 If so,how many high density project reviews were approved? 0
Did Carrboro maintain a current inventory of low-density projects and
constructed SCMs,including SCM type or low-density acreage,location,last
inspection date and type of enforcement action(if any)? NA-The Town did not have any low density projects as we are highly urbanized
504 3 30 PARTIAL but we do maintain an inventory for SCMs.
How many high density non-municipally owned SCM inspections were
509 3 30 performed? 74
514 3 30 How many low-density inspections were performed? 0
519 3 30 How many post-construction enforcement actions were issued? 0
526 3 31.B.1. Did Carrboro evaluate engagement on post-construction website? YES
527 3 31.B.1. Number of online hits on post-construction web page? 166 _
Did Carrboro Maintain data of septic system failures and resulting actions?
538 3 37.B.2. YES
539 3 37.B.2. Number of septic system failures reported? 5
Did Carrboro Maintain reports of environmental surveys conducted by OC
548 3 37.B.3. staff in Carrboro jurisdiction? YES
549 3 37.B.3. Number of environmental surveys conducted? 0
556 3 38.B.1. Did Carrboro update the inventory of municipal facilities? YES
Did Carrboro conduct a review of facilities for stormwater pollution potential
561 3 38.B.2. and opportunities for improvement? YES
Page 2 of 4
NCS000450 CARRBORO 2024 ANNUAL SELF-ASSESSMENT
Did Carrboro inspect Town facilities for compliance,adherence to good
housekeeping practices and adequate documentation of maintenance
569 3 39.B.2. activity? YES
Number of Town facilities inspected for compliance,adherence to good
housekeeping practices and adequate documentation of maintenance
570 3 39.B.2. activity? 22
Did Carrboro Perform routine good housekeeping maintenance in
577 3 39.B.3. accordance with facility needs? YES
Did Carrboro conduct training for Town staff on general stormwater
awareness,with emphasis on Pollution Prevention and Good Housekeeping
for municipal facilities and the Town maintained MS4 and rights of way?
587 3 40.6.2. YES
Number of Town staff trained on general stormwater awareness,with
emphasis on Pollution Prevention and Good Housekeeping for municipal
facilities and the Town maintained MS4 and rights of way?
588 3 40.B.2. 37
Number of training events for Town staff trained on general stormwater
awareness,with emphasis on Pollution Prevention and Good Housekeeping
for municipal facilities and the Town maintained MS4 and rights of way?
589 3 40.6.2. 6
600 3 40.B.3. Did Carrboro provide Hotline information cards to staff? YES
601 3 40.6.3. Number of Hotline information cards provided to staff? 58
Did Carrboro provide quarterly stormwater related items for the internal
610 3 40.6.4. Town newsletter? YES
Number of quarterly stormwater related articles provided for the internal
611 3 40.6.4. Town newsletter? 4
Did Carrboro install informational stormwater pollution prevention posters in
620 3 40.6.5. Town breakrooms? YES
Number of informational stormwater pollution prevention posters installed
621 3 40.B.5. in Town breakrooms? 7
628 3 41.B.1. Did Carrboro Review spill response procedures for adequacy? YES
637 3 41.B.3. Did Carrboro record spills that required clean-up response? YES
638 3 41.B.3. How many spills required clean-up response? 0
649 3 43.B.1. Did Town first responders receive spill response training? YES
Number of Town first responders trained in spill response? Fire Department(38 staff)
650 3 43.B.1. 75 Public Works(37 staff)
Number of Town first responders training events for spill response?
651 3 43.B.1. 3
Did Carrboro Investigate complaints/inquiries about drainage/collection
system for Town maintained rights of way and property?
663 3 46.B.2. YES
Number of stormwater investigations relating to collection system?
664 3 46.B.2. 131
Did Carrboro inspect a minimum of 20%of the MS4 annually,with a focus on
673 3 46.B.3. priority watersheds identified in the IDDE program? YES
Number of MS4 inspections,with a focus on priority watersheds identified in
674 3 46.B.3. the IDDE program? 53
Did Carrboro Maintain MS4,including routine maintenance/cleaning,
repairs,improvements as needed based on inspections?
685 3 46.B.4. YES
686 3 46.B.4. Number of MS4 service requests? 17
687 3 46.B.4. Number of MS4 work orders? 59
698 3 47.B.1. Did Carrboro add and track SCMs in GIS? YES
699 3 47.B.1. Number of mapped municipal SCMs? 9
709 3 48.B.2. Did Carrboro conduct inspections of municipal SCMs? YES
710 3 48.B.2. Number of municipal SCM inspections conducted? 6
719 3 48.B.3. Did Carrboro maintain municipal SCMs to ensure proper function? YES
720 3 48.B.3. Number of work orders related to SCM maintenance? 0 A third party contract is in place for rountine SCM maintenance.
Did Carrboro train applicable Town staff on landscape chemical application?
732 3 49.B.2. YES
Number of applicable Town staff trained on landscape chemical application?
733 _ 3 49.B.2. 3
Number of Town staff training events on landscape chemical application?
734 3 49.B.2. 1
Did Carrboro maintain applicator certifications for appropriate personnel?
745 3 49.B.3. YES
746 3 49.B.3. Number of certified applicators? 3
Did Carrboro review products used,both in-house and via contracts,as
products are purchased and/or start of new contracts,for compliance with
permits,applicator certifications,and Policy?
754 3 51.B.2. YES
Did Carrboro inspect the Public Works facility quarterly for compliance and
761 3 52.B.1. adherence to good housekeeping practices? YES
Number of Public Works facility quarterly inspections performed for
762 3 52.B.1. compliance and adherence to good housekeeping practices? 4
Did Carrboro perform an annual review of maintenance logs/reports and
quarterly inspections;and prepare a report on Public Works facility
769 3 52.B.2. compliance? YES
Did Carrboro communicate standard vehicle washing procedures to
774 3 53.B.1. municipal staff during annual training and via posted material? YES
Did Carrboro inspect vehicles and equipment and maintain vehicle
781 3 55.B.1. inspection records? YES
Number of vehicle and equipment inspections performed? CityWorks Post Trip Vehicle Inspections(1366)
782 3 55.B.1. 1,479 Required state safety inspections(113)
795 3 56.B.1. Did Carrboro review street sweeping routes and schedules? YES
Did Carrboro perform regularly scheduled and on-request street sweeping
796 3 56.B.2. activities? YES
Page 3 of4
NCS000450 CARRBORO 2024 ANNUAL SELF-ASSESSMENT
797 3 56.B.2. Miles of streets swept? 355 Metric is for curb miles
798 3 56.B.2. Tons of debris collected? 62.41
813 3 57.B.1. Did Carrboro review yard debris pick up routes and schedules? YES
Did Carrboro perform seasonal and on-request yard debris/leaf collection?
814 3 57.B.2. YES
Tons of yard debris collected?
815 3 57.B.2. 1991.13 tons Metric has been aggregated and converted to tonnage using a factor of(.2).
Did Carrboro conduct an annual needs assessment to determine candidate
824 3 58.8.1. streets for resurfacing? YES
Did Carrboro budget,schedule and perform resurfacing for priority streets?
833 3 58.8.2. YES
834 3 58.B.2. Square yards of priority areas resurfaced? 10,485
835 3 58.8.2. Tons of ashpalt applied? 1,196
Page 4 of 4