HomeMy WebLinkAboutNCC242690_ESC Approval Submitted_20240830 From: SVC_DoNotReply-DEQPermits<DoNotReply-DEQPermits@deq.nc.gov>
Sent: Tuesday,August 27, 2024 10:42 AM
To: Lunte, Frances; Sullivan,Vinnie
Subject: NC DEMLR- FROF Application Approval with Modifications Needed
CRM:0170174
Attachments: Application Report-Tuesday,August 27, 2024 1038 AM.pdf; ROCKI-2025-
0112_Enbridge Tap Line Transmission Rebuild Project- Phase 2.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
You don't often get email from donotreply-deqpermits@deq.nc.gov. Learn why this is important
CAUTION: [EXTERNAL] This email originated from outside of the organization. Do not click links
or open attachments unless you recognize the sender and know the content is safe.
:o-STATE A�
icip
t , r;:-:.%...0
'`MFsse,(i z i t fo
QUAM VICO
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director
08-27-2024
Duke Energy Carolinas, LLC c/o Vinnie Sullivan
525 S Tryon Street
Charlotte, NC 28202
RE: Project Name: Enbridge Tap Line Transmission Rebuild Project-Phase 2
Acres Approved:23.8
Application ID: PA-006421
Permit Number: ROCKI-2025-0112
Address: ENVIRONMENTAL INTEREST PHYSICAL LINE 1
City: Eden
County: Rockingham
River Basin: Roanoke
Stream Classification:C:Aquatic Life,Secondary Contact Recreation, Fresh water
Plan Type: New Plan
Dear Duke Energy Carolinas, LLC c/o Vinnie Sullivan,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this Letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page.The Certificate of Approval must be
posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no
land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice
of Intent (eN01) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction
General Permit.After the form is reviewed and found to be complete, you will receive a link with payment
instructions for the $120 annual permit fee.After the fee is processed,you will receive the COC via email. As
the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the
COC prior to commencement of any land disturbing activity.TheeNOlform may be accessed
atdeq.nc.gov/NCG01. Please direct questions about the eNOlform totheStormwater Program staff in the
Raleigh central office. If the owner/operator of this project changes in the future, the new responsible
party must obtain a newCOC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on
file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land-disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there
is any change in the information included on the form. This permit allows for a land-disturbance, as called
for on the application and plan, not to exceed the approved acres. Exceeding the acreage can be a
violation of this permit and may require a revised plan and additional application fee.In addition, it would
be helpful if you notify this office of the proposed starting date for this project.
Modifications Required for Approval:
General Comments:
1. Please print this email as your Letter of Approval for your NCG010000 Certificate of Coverage
application.
2.Please notify this office prior to your pre-construction conference for this project by calling
(336) 776-9800 and asking to speak with the Land Quality inspector for your county. Permission
must be obtained and granted from NC DEQ DEMLR prior to the removal of any ESC
measures. All additional permits should be obtained, as necessary, prior to beginning
construction. [GS 113A-51, 15A NCAC 4B .0120]
3. Any off-site borrow and waste required for this project must come from a site with an
approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill
regulated by the Division of Solid Waste Management. Trash/debris from demolition activities
or generated by any activities on site must be disposed of at a facility regulated by the Division
of Solid Waste Management or per Division of Solid Waste Management or Division of Water
Resources rules and regulations. [15A NCAC 4B .0110]
4. Additional measures may be required - The applicant is responsible for the control of
sediment on-site. If the approved erosion and sedimentation control measures prove
insufficient, the applicant must take those additional steps necessary to stop sediment from
leaving this site. [15A NCAC 4B .0115]
5. The NCGO1 has a $120 yearly fee and our office often receives closure inspection requests
days prior to yearly NCGO1 fee payment due dates. Be advised the project requires a closure
inspection report by DEMLR prior to filing the Notice of Termination (NOT) to terminate NCGO1
coverage. The closure inspection should not be requested until after the site has achieved full
vegetative stabilization and measures have been removed. The removal of temporary ESC
measures, including basins, requires prior approval. Often, a full growing season is necessary
between initial seeding/mulching and removal of measures. Please plan your construction
accordingly to avoid contacting our office prematurely for a closure inspection. Also be advised
you may be asked for representative site pictures prior to a closure inspection. [General
Comment]
Your cooperation is appreciated.
Sincerely,
Jack Lawry-Popelka, EIT
336-776-9659
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
North Carolina Department of Environmental Quality I Division of Energy,
� Mineral and Land Resources
D_E crl Winston-Salem Regional Office 1450 West Hanes Mill Road, Suite
300 I Winston-Salem NC, 27105
Ormrlowl ors� /'"
V 336-776-9800
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third
parties by an authorized state official.