Loading...
HomeMy WebLinkAboutWQ0045714_Application (FTSE)_20240815Burd, Tina J From: Burd, Tina J Sent: Thursday, August 15, 2024 12:24 PM To: jlohr@onwasa.com; information@strongrockgroup.com Cc: Cocanower, Jordan M; Tharrington, Tom Subject: WQ0045714 - Merchant Point Subdivision Sewer The Wilmington Regional Office of the Division of Water Resources, Water Quality Operations Section received the Fast Track Sewer System Extension Modification Application (FTA) and $600.00 fee for the subject project on August 15, 2024. The project has been assigned to Jordon Cocanower, cc'd, you will be contacted by the applicable staff member if additional information is needed. Please note that the FTA has been revised and requests the applicant to identify if this project is ARPA funded. you omitted this information from the FTA, please contact Bryan Lievre, email below, so that we can update our records. Staff Reviewer Counties Served Contact Information Tyler Benson Brunswick, Columbus, Duplin & Pender tyle 1t! nson @decJTnc.goy Jordan Cocanower Carteret, New Hanover & Onslow iordan.cocanowe.r@de_q.nc.gov Bryan Lievre All - ARPA Projects Only byn _I,ievredeq,nc,o� Tom Tharrington All — Coordinator, Please Copy on All Emails tom..tha.rri.ngLo.ii.@.d.e.g...nc..gov 1. Please provide a copy of the entire application in digital format to your assigned reviewer indicated above. The application and drawings should be provided as separate files. 2. Please indicate in the subject line of the email the permit number (if available), name of the project, and county where the project is located. Please be advised that the construction of the proposed activities may not commence until the sewer permit is issued. Best Regards, Tina Burd Administrative Associate II Wilmington Regional Office Division of Environmental Assistance & Customer Service Phone 910-796-7324 New email: tina.burd@deg.nc.gov NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 t° rr�r,rf U r "5p€�r2��E�r7G3 tC I�3riCi frc�il't Ih s flt�ctl �sS ";; Sol.( t tc7 thG North l aF" hi',c. Fluhlit; 1 [f:`con s I aw and, may be 10 "hird partie' STRONGROCK STRONGROCK ENGINEERING GROUP, 1'LLC 305 Church at North Hills St. Ste. 1110 Raleigh, NC 27609 E N G I N E E R I N G G R O U P Company License # P-2166 TRANSMITTAL FORM TO: NCDEQ Division of Water Resources —Wilmington Regional Office Water Quality Section 127 Cardinal Drive Extension RECEIVED/NCDENFUDWR Wilmington, NC 28405 AUG 15 2024 SUBJECT: Merchant Point Fast Track Sewer Initial Submittal DATE: August 13, 2024 SENT BY: Sara Rogan We are sending you the following items: COPIES ITEM 1 Check Application low tracking low tracking Site Map IoperAgreement Report DESCRIPTION $600 check #1752471 Fast track sewer form signed Flow tracking form filled out by ON WASA Flow tracking form filled out by Camp Lejeune USGS topo map with site highlighted Maintenance agreement signed by the developer Engineering Sewer Report These are transmitted as checked below: For Information _ Approved as Noted — Revise and Resubmit As Requested _ Not Approved — Revise and Resubmit X For Review and Comments _ For Record and File For Revision _ Submittal For Approval _ For Recording Approved _ For Signature, then return to: REMARKS: Water Oualty Regional operations Section Wilmington Regional ottice State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (with Advancing) (FTSE 1 10-23) Entity Requesting Allocation: D. R. Horton Project Name for which flow is being requested: Merchant Point More than one FTSE may be required for a single project if the owner of the WWTP is not responsible far all pump stations along the route of the proposed fvaste►vater flow. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: b. WWTP Facility Permit #: All flo;vs are in MGD c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request .0309 g. Total actual and obligated flows to the facility h. Percent of permitted flow used 11. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Approx. Obligated, Total Pump Pump Average Current Not Yet Current Flow Station Station Firm Daily Flow** Avg. Daily Tributary Plus (Name or Permit Capacity, * (Firm / p#), Flow, Daily Flow, Obligated Available Number) No. MGD MGD MGD MGD Flow Capacity*** Towne Ww 0035255 2.8800 1.1520 .1541 .1151 .2691 1.0370 Piney WQ32377 5.76 2.3000 .3889 .2183 .6382 1.6618 Gyr.en PS * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. RECEIVED/NCDENR/DWR *** A Planning Assessment Addendum shall be attached for each pump station Iocated project connection point and the WWTP where the Available Capacity is <0. Downstream Facility Name (Sewer): ONWASA Downstream Permit Number: WQ0035255 Page 1 of 8 between the AUG 15 2024 Water Quality Regional Operations Section Wilmington Rngional office FTSE 1 10-23 III. Certification Statement: I Jeffrey Lohr, PE _ certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under nonnal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Chief of Engineering Title of Signing Official Date Page 2 of 8 FTSt; 110-23 State of North Carolina Department of Environmental Quality Division of Water Resources Dhdston of Watri Re-.ourc es Flow Tracking for Sewer Extension Applications (with Advancing) (FTSE 110-23) Entity Requesting Allocation: ONWASA Project Name for which flow is being requested: Merchant Point More than one FTSF maybe required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: French Creek WWTP b. WWTP Facility Permit #: NCO063029 All, flows are in MGD c. WWTP facility's permitted flow 15 d. Estimated obligated flow not yet tributary to the WWTP 0.043160 e. WWTP facility's actual avg. flow 4.423 f. Total flow for this specific request .0309 g. Total actual and obligated flows to the facility 4.466 h. Percent of permitted flow used 29.8% 11. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm 1 pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** Water Quality Regional Operations Section *The Firm Capacity (design flow) of any pump station is defined as the um mixa mlXa mil pum�cp o°w`ihat can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. ** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): ONWASA Downstream Permit Number: WQ0035255 Page 1 of 8 FTSE 1 10-23 Ill. Certification Statement: I Jonathan Casey certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. J IV i `" C JlziL i or Title of Signing Official /2, Date Page 2 of 8 FTSE 1 10-23 State of North Carolina DWR Department of Environmental Quality Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources INSTRUCTIONS FOR FORM: FTA 10-23 & SUPPORTING DOCUMENTATION This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's Minimum Design Criteria (Gravity Sewer & Pump Stations/Force Mains) and that plans, specifications and supporting documents have been prepared in accordance with 15A NCAC 02T. 15A NCAC 02T .0300, Division policies, and ood en ineerin ractices. While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These documents shall be immediately available upon request by the Division. Projects that are deemed permitted (do not require a permit from the Division) are explained in 15A NCAC 02T.0303 Projects not eligible for review via the fast track process (must be submitted for full technical review): ➢ Projects that do not meet any part of the minimum design criteria (MDC) documents; ➢ Projects that involve more than one variance from the requirements of 15A NCAC 02T; ➢ Pressure sewer systems utilizing simplex septic tank -effluent pumps (STEPS) or simplex grinder pumps; ➢ Simplex STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains); ➢ Vacuum sewer systems. General — When submitting an application, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional information. Failure to submit all required items will necessitate additional processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit one original and one copy of the application and supporting documentation. A. O Original and One Copy (second copy may be digital) of Application and Supporting DocumdWCEJVED/NCDENR/DWN Required unless otherwise noted. Signatures on original must be "wet ink" or secure digital signatures. Please do not submit engineering design plans with the application unless specifically requested. AUG ] 5 20?4 B. C er Letter/Narrative Description (Required for All Application Packages): Water OuaMtY Regional List all items included in the application package, as well as a brief description of the requested permitth%g aotJ%R ipn ➢ Be specific as to the system type, number of homes served, flow allocation required, etc. Wilmington Regional ONfce ➢ Include the permit number/status of any other required sewer permits (downstream/upstream) ➢ If necessary for clarity, include attachments to the application form. ➢ If the project is funded by American Rescue Plan Act (ARPA) funds, please include the ARPA project number in the cover letter and in parentheses under Project Name (Section IL 1. of the application). C. Application Fee (All New and Modification Application Packages): N Submit a check or money order in the amount of $600.00, dated no more than 90 days prior to application submittal. ➢ Payable to North Carolina Department of Environmental Quality (NCDEQ) D. Fa t Track Application (Required for All Application Packages, Form FTA 10-23): Submit the completed and appropriately executed application. ➢ If necessary for clarity or due to space restrictions, attachments to the application may be made. ` If the Applicant Type in Item I.2 is a corporation or company, provide documentation it is registered for business with the .�111C North Carolina Secretary of State. if the Applicant Type in Item I.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of Deeds in L the county of business. f1 The Project Name in Item 1I.1 shall be consistent with the project name on the flow acceptance letters, agreements, etc. The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina licensed Professional Engineer. INSTRUCTIONS FOR FORM: FTA 10-23 & SUPPORTING DOCUMENTATION Pagel of 3 THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee, Water Quality Section Swannanoa, North Carolina 28778-B211 Clay, Graham, Haywood, Henderson, Jackson, (828) 296-4500 Macon, Madison, McDowell, Mitchell, Polk, (828) 299-7043 Fax Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke, Water Quality Section Fayetteville, North Carolina 28301-5095 Montgomery, Moore, Robeson, Richmond, (910) 433-3300 Sampson, Scotland (910) 486-0707 Fax Mooresville Regional Office 610 E. Center Avenue Alexander, Cabarrus, Catawba, Cleveland, Water Quality Section Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan, (704) 663-1699 Stanly, Union (704) 663-6040 Fax Ralelah Regional Office 3800 Barrett Drive Chatham, Durham, Edgecombe, Franklin, Water Quality Section Raleigh, North Carolina 27609 Granville, Halifax, Johnston, Lee, Nash, (919) 791-4200 Northampton, Orange, Person, Vance, Wake, (919) 571-4718 Fax Warren, Wilson Washington Regional Office 943 Washington Square Mall Beaufort, Bertie, Camden, Chowan, Craven, WaterCauality Section Washington, North Carolina 27889 Currituck, Dare, Gates, Greene, Hertford, Hyde, (252) 946-6481 Jones, Lenoir, Martin, Pamlico, Pasquotank, (252) 975-3716 Fax Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New Water Quality Section Wilmington, North Carolina 28405 Hanover, Onslow, Pender (910) 796-7215 (910) 350-2004 Fax Winston-Salem Regional Office 450 W. Hanes Mill Road Alamance, Alleghany, Ashe, Caswell, Davidson, Water Quality Section Suite 300 Davie, Forsyth, Guilford, Rockingham, Randolph, Winston-Salem, North Carolina 27105 Stokes, Surry, Watauga, Wilkes, Yadkin (336)776-9800 (336) 776-9797 Fax INSTRUCTIONS FOR FORM: FTA 10-23 & SUPPORTING DOCUMENTATION Page 3 of 3 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑ No ® NIA 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑ No ® N/A 3. If the Applicant is a Home/Property Owners' Association, has an HOA/POA Operational Agreement (FORM: HOA) and supplementary documentation as required by 15A NCAC 02T.0115(c) been attached? ❑ Yes ❑ No ®N/A 4. Origin of wastewater: (check all that apply): ® Residential (Individually Owned) ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential (Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool/Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic % Commercial % Industrial (See 15A NCAC. 02T .0103 (20,)) If Industrial, is there a Pretreatment Program in effect? ❑ Yes❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(fl? []Yes ❑ No ➢ If yes, provide a copy of flow reduction approval letter with this application 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow e,b No. of Units Flow DWELLING UNITS 300 gal/DAY 103 30,900 GPD gall GPD gall GPD gall GPD gall GPD gall GPD Total 30,900 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e. proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 30,900 GPD (per 15A NCAC 02T .0114 and G.S. 143-215.1) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, please indicate why: ❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number: Issuance Date: ❑ Rehabilitation or replacement of existing sewers with no new flow expected ❑ Other (Explain): RECEIVED/NCDENR/DWR AUG 15 2V4 FORM: FTA 10-23 Water Quality fegional operations section Wilmington Regional Office Page 2 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305 & ? ® Yes ❑ No 15A NCAC 02T.0305(f) contains minimum separations that shall he nrovided for sewer evstetns- Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 18 inches 'Water mains (vertical - water over sewer preferred, including in benched trenches) 18 inches 'Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water, and associated wetlands. 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands associated with these waters (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches, as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation (horizontal) R 5 feet Any basement (horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical heightAUG 15 2024 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools Water Quality Regional 10 feet Final earth grade (vertical) Wilmington Regional Office 36 inches ➢ If noncompliance with 02T.0305(fl or (g), see Section X.1 of this application *15A NCAC 02T.0305(a) contains alternatives where separations in 02T.0305(fl cannot be achieved. Please check "yes" above if these alternatives are used and provide narrative information to explain. **Stream classifications can be identified using the Division's NC Surface Water Classifications webnag 2. Does this project comply with the minimum separation requirements for water mains? ®Yes ❑ No ❑ NIA ➢ If no, please refer to 15A NCAC 18C.0906(o for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ® Yes ❑ No ❑ N/A ➢ Please provide supplementary information identifying the areas of non-conformance. ➢ See the Division's draft separation requirements for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ❑ Yes Basin name: ® No If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 0213.0200? ® Yes ❑ No ➢ This includes Trout Buffered Streams per 15A NCAC 2B.0202 5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ® Yes ❑ No or 401 Water Quality Certifications? ➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required. 6. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 7. Does this project include any sewer collection lines that are deemed "high -priority?" ❑ Yes ® No Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interference/conflict boxes require a variance approval. ➢ if yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall he inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 10-23 Page 4 of 5 ��(�(�� U.S. DEPARTMENT OF THE I HTERIOR SG U.S. rAOLOOCAL SURY 1Y j ►., 0 rTzo CAMP LEJEUHE QUADRANGLE xoRIH coal".0. DWCOUNW 77MHll l SfRIES SI 9S� rrsv t fiodwoa bfA caauale.l lruuev IIA 11100R uwC(wfnunox u... �wn. x.. n'n nwn mi va. O+iv,�ti1� a 1 ma � wa�irii�n�R .c t.w [auP.� nl[ncf nn . x I xpyy.y ben ,o nueu,4y�viurreyry.i�r.�x..r 4re�f r,n CAMP LEJEUHE, HC ml ��(Of'0(* U,S.OEPARTMENT OF THE INTERIOR KELLUMQUAORANGLE JGS N U�S. GEOLOGICkl SURVEY �a� D NORiX CAAOLRIA- ONSLow CauNTY ryrn xr.ryxlynyy , US Tapo 1,5.1WNrRf SERI[3 r 51mk pia_ Is 55 54 Kd1PPr 53 PVr.pkin r'd - DECEIVED/NCDENRA) R i 1 _ �d AUG 15 20-4 Water OuaMty Regional Operations Section Wiiminglon Regional O$ice JACKSONVIT.LI' - _ �F i es as 19 M 09 �aEurM M uw VnO.E Y.rx GMPIYa srtis' � SCALE t:xa 000 °per - ��e A — Tr u .e.r ®�`•' .. ... >on ..x.e.x...rsRer w....xru, iR.�..`�• uwrx .or,s. xRr..S x.. � �mrr..c 1 x KELLUM, NC �S3I 2022