HomeMy WebLinkAboutNCC242658_Site Plan or Location Map_20240829 _ _ _
/
DATE: PAGE
smITN Ro sec 2n�MD \ / �\ �i /\ \ / 26 1LG ��:
SITE _ _� �- l J / \ / / •`O�XOeO /,.-4101,1,14 6',,,,.wr
/T( ®BANOHILL ROB / 'j� \\ \ / / QJ °M/or�'He
,, R223B 1 4 _� \ / 1siiti .......
SN� _ - - �� ..- may veS
_ 1:: ------------- ---512
j____ _____ - -
- Smith Road SR-2237 - - _ _ _ _ _
Construction: Maintenance:
\- 1.Clear the entrance and exit area of all vegetation,roots,and other objectionable 1.Per NCG-01 inspect at least once a week and after each 1 inch or
materal and properly grade it. greater rainfall:make any required repairs event ately.
:_-_ :=_-_ N= = - ----
_ _ _ 2.Place the gravel to the specific grade and dimensions shown on the plans,and 2.Maintain the gravel pad in a condition to prevent mud or sediment
87 _ _ \�\ I�\ - _ _ _ smooth from leaving the construction site.This may require periodic
VICINITYMAP 1/ - 3.Provide drainage to carry water to a sediment trap or other suitable outlet. topdressing with 2 inch stone.
NT.S. \ 4.sub ge°oselefage or In ONer to iable. stability of the foundation in locations 3.Immediately remove all objectionablematerials spilled,washed or
\ kisn \ / \ ROADSIDE JJJ subject to seepage or high water table. tracked onto public roadways.
N.
III
\PZ" _ _ CONSTRUCTION ENTRANCE/EXIT
cct
/
36 \ \ DATE: Wire Fence t-Filter Fabric PAGE:
CONSTRUCTION SCHEDULE \ T
\ 34 p
M Max.Standard Strength fabric with wre fen.1 obmin all necessary pemins a 1 I e a s a rat coatrogEetsc)perm and a cmigaata of coverage \ / 7 / steal a Max lama strength fen a fen ° C(COC)must be obtained before yl dd' rb g A opy of theE SC permit[the COC and a bard copy of the /�//play moat be kept on sire,prcf ply' perm b d bl during inapeetim ��, Wlre FenceY/r v aand C Trench
2 sstell grevelwssimn ov rnvan f L. l£ f d'I Once \ / / 1 Steel Postmtlns and wattles / thoroughly`t3 Finish clearing and grubbingan dry n the lots a they are stated. \Or-a a __4 B g lotg dig d 111} Upe ope
5. g r .h 1 ,y , \ / PWue ct or esmin
6. .ell gh grad g d h 11 d'sm.ed for]days needs to have temporary or pemimem ) V"4gr dw Iled. 1 ~ 01 le a'
J.I llN ys Iks dpe ` / v"48 Beginf gr&a fl V r+4 O gr1• V f9.Fiml Bra mlching and tabilmng of lot In ases this will involve the installation of sod ou.elo[.The sat fence will O ••• CONSTRUCTION n A texg o-enen /
remain in alma until the lot is sodded or grassing is stabilized and takes bold. ••• LIMITS
10.The cmirncmr shell conduct self-inspections of.e erosion and sedimentation control measures and complete.°following 411 MMI
combinedself-inspection fora,found on tM1eD websik // C°nso-union. Filter Fabric ///
M1ttpsl/www.degnegov/ebouVdivismns/energy-mineral-end-land-resoumeslsrormweter/srormwater-prograMnptles-constrvcuon-program, 1. Construct harder of standardatrervglM1 or extra strength synthetic filter taGkx CROSS SECTION VIEW
Twelve months of complete inspection forms shall be kept on site and available for inspection at all timed.It is recommmdeda \ Wo _F- • 2.Ensure tM1ae'tM1ehe gY,tMaf Me sediment fence»a not exceed 241nches above Me ground.(HigMrlencea
G.S.S.
copy be kept.a permits box.Ref 1134-54.1 through G 5.113A-57 Sections ISA NCAC 04A.0101 Wough 15A '
NCAC 04E.0504 General Permit NCO 010000 NED.for Com on Activities. FF 3.Con rollbarn
11.Self-inspections for erosionand sedimentation control measure are..perfomed at less everyse calendar daysand » PZ8 necessaryfasten the rah to cause
minimum .e next post.
within 24 hours of every. tof greater.an 1 inch.Any needed repairs shall be made immediately to UG ... trehngthfiterfi cl byw eupalapeos ' roe pace Mendena
pound volumes
designed.All ESC hall be maintained specified in the construction details on this Ian Amin maintain
be installed _ -----_ / i-
Rn ... sPe P gauge __ _ 27 If / • the wiree m»M1°suPponm.e bommta.
t.
tles should have a minimum 50 sound Mnste
12 lrispe viol dr for
l egleners when.°PloJeM is complete°permiares snarl confect DEMLR to arose out.°EffiSC 23 I • \ Whena wire meshsptlrt roencesused..spa a r an.Suppam ssh"hond bee omit tear,s Pn
Plan.After DEMLR informs the permitted of the project close out via inspection report the perminec snarl visit J 24 O \ renfi . in.or greater rainfall.Make any or become ineffective,replace it Remove sediment deposits. essay to repairs
..adequate
"degnc.gov/NCG01'to submit an electronic Notice of termrnnon(e-NOT)A$120 annual general permit fee will be charged 25 I InP: ssM1ouM M1avea mnmum of p° the andredkaee p`
until theta NOT has been filled out. �9m? »� pP° 50 tan Take cane[.avoid nest
the fence during
/ I I _ Epaopefromthetrench
h`rier�andc lam.ebnmma tlsde and
MMeuend deep along the POP etl neolM P°mand dra g Ilencingmaede,anduna'abe»dimentd p sl
h.
g.Backfill a8. llYwltUinches
lien wfth soil
rtoimp'aaetl overtire Mar labdc anti compact.Thorough and bringtna ereebgreee'eN sednze'IteMrme contributing
g pacdm of the backfill is area hash properly stabilized.
to.Do not epoch filmrkbrkm°euAng treed. 4.Remove
MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION 26I ..AND-Envir tOl.jpeg
Gravel Construction Entrance-The gravel pad shohiAmmain in a condition to prevent mud or sediment from leaving the concoction site. // / I / �nTen SILT FENCE
This may require periodic topdressing with 2-inch stone.Aftereach rainfall,inspect any structure used to trap sediment and clean it out as necessary. / / / • I
Immediately remove all objectionable materials spilled,washed,or tracked onto public roadways. )I
Lot Plan
Silt Fenee-Sediment fences should be inspected at least once aweek and after each rainfall event Any repairs should be made immediately. W / DATE: PAGE:
Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that buildup against the fence should be removed and disposed 10'SRE C UTILITY ASEMENT G/,
of properly m insure that the removed sediment does not wash back against the fence.Ad...storage volume should be provided for behind.°fence yv UTILI Y ASEMENT -�J a Silt Sock/wattle sin sock/w
at tau times.Take care to not undermine the fence during Beano p / / / (7 �� �1 Arm to he FtS jIm Area to be 1. OMer materials providing aqui...ttle Sodding Thed should be properly maintained.insure that thegrasstakeholds in Me areas being secured The sod should be watered as necessary J III \ (/\ avf/ W • �11 1f"".-_ firer
to maintain deq sturem die mci oneand prevrntdorm dormancy of the d.The sod should not be mowed innoon,smce.iscould inhibit adequate 1 ,1�Iandevilla'Way ' J °�l P9 i� 21. y
growth d stabilization of the root bat.The Als should be limed and fertilized as per soil type fecommemlAms and type of grass recommendations when / Stakes 11 - parallel to
and ifposaible SECTION hew erne of
SECTIONslope. m Isl omat.brow
Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. 10'UTILITY EA EMENT flat od heceKKcarea retie edge of Me
Once the gassing has been placed,die area should be maintained as needed to insure that all areas are semiii..properly.Any bare areas should be repaired, \ 10'SREMC UTILITY-/�,S �- bin areas*s))set uld ends
lu of sNM1
and reseeded ss soon ss possible.If the time of year does not permit the establishment of permanent grass,then a temporary grassing should be wartime'the / CrSSEMENT / w e ot'Oil�la
growing season armies the use of a permanent grass. \ / �- / /Ir
_ / �O BMex. a.H,a. I 4es kwprevent em other tlurable off amBo gar one tam e
Diversion Berms-Diversion berms shall be inspected weekly or after each runoff producing rainfall to insure that diet'are operating as designed and that there / / I, hardwood
9 wltltabe drikes ven
Diversion
have been no breaches tithe berm.Bemis shall no exceed 18"in height,and shall be placed in roc ris that will no nteifere with home construction an W center
Once the house construction is completed and the lot is ready to receive sod,then the bens shall be removed anddm material incorporated into the graded lot area he paced Me
and covered immediately wiih sod.An proper care shallb k to insure that the berms are installed=corals to the applicable detail with the bran maefial V I TrencM1 maxlmum interval of 4 feet or a "eta n
compactedsufficiently m theberm - placeduring me course afore concoction activities. /] / / o coo Mulch or om ina etc
General All will be inspected and - d as runoff producing rainfalls,or at least per k minimum.The builder will ivsurctnal the 22 / 21 / 20 // / T\n� uNTRErvcHEO INSTALLATION Ory t of`g s 5. In.event Making is not possible socks/wattles are u.d on IENTRENCHED INSTALLATION. concrete blocks shall be used d when
le
constmetion any particular told not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be relocated / I W� aiwuwunoxw are uamm.cow.no ci.ues,..w Me silt
on.elot retthat.e potential for sedimentation noffiseliminamd as itch as possible.Silt fences and grovel construction entrances will be maimained as suggested ^m•/ / // I q.Z ISOMETRIC VIEW soolsWattle to old rain plane rag on events.
m the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing covn"UC core steno Dow PATES t as and altar
each 1 moh or greater rainfall.Remove
lch or Compost ..
tl l / 0// I 2 D tr rehaeaeem ` d Design Dame.a(m)a.a sou m)(WO m)(s00 ram)The ai so :. ddins pa»dlfal gg dpr
GROUND STABILIZATION -,„ I „L / '' "0/ s»tFm� ill M. ai °aced a
Si"$oak/"t mi�m(.Q"' I'"r")(""";
SITE AREA STABILIZATION .m,�._. `""". / // work Am, ! Wattle
" �aete (>^ ) or-) a m) fi Al= M1
1 a a t°eta. in's`°n°e=-namp1o°pe°aal�e and»e
EXCEPTIONS top s" 'tee" (/ n�a gi�a° giST<" awmp ra me abavama
DESCRIPTION TIME FRAME / /m]m) ]]) vmiml /mid,) ]m]m) s been permanently stabilized.
PERIMETER DIKES, 7 DAYS NONE / -(
SWALES, DITCHES _'•-'•,n I u r / / 19 ZOY �i SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION
HIGH QUALITY 7 DAYS NONE TIJIL- i / / / A1'e/ � � .<�ya� A SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY
WATER ZONES - .,<.a,�.°A°m. NN-N�rGl1` 'vV NCGS 113A-54.11S AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR
II / •,8 �� COMPLETED AS AN EXCEL SPREADSHEET.
(HOW) ➢ ::::":":7._e v G.Cl AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED
SLOPES STEEPER 7 DAYS IF SLOPES ARE lll II •
.m�.... m.ma / / /� EROSION AND
THAN 3:1 10'OR LESS IN A °^"" ✓ / 1"10O C��v lY / SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A
LENGTH AND ARE �..�..._.��,... w.m..w.,w.,n..... r� / sr�"J '( NCAC 04B.0131 STATES THAT"...DOCUMENTATION SHALL BE ACCOMPLISHED BY
NOT STEEPER / / / Ay' �G�'C/ ROIVG AND DOTING EACH MEASURE OR PRACTICE SHOWNSR ON A COPY OF THE
]1v (�Cn(."CY13 APPROVED EROSION AND SEDIMENTATION CONTROLLISTS
PLAN OR BY COMPLETING,
THAN 2:1, 14 ///(((,a�L]r / ( DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE,
DAYS ARE "'""°� 'TM / / /`1' p5 - PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION
ALLOWED �� / '°o..� • qa�• I:ITP.m. .rX-N CONTROL PLAN...
SLOPES 3:1 OR 14 DAYS 7 DAYS FOR ��-�% _ m
TH T
FLATTER SLOPES GREATER II\I�IPII= ' e.a. w, ,IIIO /� / /���/ °� N. PAGE 1 of 2
( IE 11I P �. �� 1
ALL OTHER AREAS 14 DAYS NONE EXCEPT 11 1I II 1 ,� / LOT EROSION CONTROL PLAN
WITH SLOPES FOR PERIMETERS Nv • fl 1 -
THAN 50'IN R
FLATTER THAN 4:1 AND HOW ZONES) '^�°^,,, w , FOR LOTS 6 & 9
5 TOTAL DISTURBED ACREAGE: 0.86 ACRES
SODDING IN
\ ---- 2
/ MORNING GLORY, PHASE ONE
- 130 - -
LOT 6
imamsa -AzTRMMwax= ' �- AND
II IS
aa�°ray e / MORNING GLORY, PHASE TWO
,E°,yTaawTa-
imiin ((swum,
raaen amTeRMDase
--- \ / LOT 9
Pursuant to G.S.113A(3),provisions for permanent ground cover -L_3-2 ----- _
i sufficient to restrain erosion must be accomplished for all ,.so \ FOR
. disturbed areas within 14 working days or 90 calendar days al 7
(whichever is shorter)following completion of construction. ` 1°K I M A S H HOMES, L L C.
OBI \ GRAYS CREEK TOWNSHIP CUMBERLAND COUNTY
aoiaEorr,I�m,". :=0'. °7,7- mowwHe"TaeMOIS
"""'""`°ran �oEcai Rom" m"°a"`°ea0 General Erosion Control Notes NORTH CAROLINA SCALE: 1"- 60' JUNE 2024
w�mE.ann gAST"EPODla WEE✓S.SETTeEMOWm ,
maxav„
•
I I 7 o a 2. tdisturbed aareas shall be grassed
and mulched as soon as / / \ GRAPHIC SCALE
APPEARANCE OF GOOD SOD Y the
it
lii l 132 I BO 0 30 60 120 240
'j I II possible and maintained until t cover Is established.
I%I ) = II
�UI'll' VII III i11M 11 no,a / I \ ENGINEERS IVIC311
( IN FEET)
.e°. / 7 \ 1 inch= 60 ft.
. � aansaaomur / / / SURVEYORS MOORMAN, KIZER & REITZEL, INC. 115 BROADFOOT AVE. FAYETTEVILLE, N.C.
f
MOORMAN,KIZER&REITZEL,INC. PHONE (910) 484-5191 FAX (910) 484-0388 License#: F-0106