Subject: Courtesy Notification of Progress Energy Carolina's Planned Erwin—Milburnie
230kV Transmission Loop Line
Dear Mr. Alsmeyer and Ms. Karoly:
Progress Energy Carolinas, Inc. (PEC) will construct a new loop line into the new Garner
1-40 230 KV substation in southeastern Wake County by looping the existing Erwin —
Milburnie 230 KV Line into and out of the new substation.
There are wetlands on the proposed project right-of-way (ROW). There is one
jurisdictional stream, jurisdictional under the Neuse riparian buffer rules, which will be
spanned by the proposed line. There will be no discharges to the streams, no increase in
impervious surface, nor will there be any changes in existing surface water flow patterns
(i.e., no redirection or concentration of flow through cuts, fills, ditches, etc.).
The stream channel is jurisdictional under NCDWQ's riparian buffer rules (i.e., are
shown on USGS topo or soil survey maps), However, the "Table of Uses" in the buffer
rules specifically exempts certain overhead electric line crossings, as long as those
crossings comply with certain best management practices (BMPs). PEC's proposed line
will comply with the buffer rule exemption's BMPs, without notification to NCDWQ,
PEC would note that since this stream is considered potential habitat for the dwarf
wedgemussel, a survey for the mussel's presence was conducted. No mussels were
found, and the USF&WS authorized PEC to proceed with the project. PEC will attempt
to leave as much riparian vegetation as possible, to comply with both the riparian buffer
rules and to ensure suitable habitat for the mussel, should it re-populate this stream.
PEC is providing this project description to you should you receive inquires about the
work, or should you wish to visit the project.
Progress Energy Service Company,LLC
P.O.Box 1551
Raleigh,NC 27602
PEC is providing this project description to you should you receive inquires about the
work, or should you wish to visit the project.
ROW clearing for this project is scheduled to begin in February 2008 and will be
completed by the end of February 2008. Construction will be completed by June 1, 2008.
Should you or others of the Land Quality Section staff wish to visit this project, please
contact Mr. Buzz Bryson in the Environmental Permitting and Compliance Unit at 919-
546-6637 (office), 919-812-1120 (cell) or buzz.bryson u,pgnmail.com (e-mail).
Thank you for your consideration.
Very truly yours,
Z. P" , /'-7.
Raymond L. Davis, Jr.
General Manager—
Construction & Engineering
RLD/wtb
Enclosures:
1. Project Location Map
2. Aerial Photo of Project Route
cc: Mr. Billy Harrell
Mr. Baxter Matheson
Mr. Buzz Bryson
Mr. Mark Smith
Mr. Bryan Hoffman
Mr. Tony Warren
c W
z �n CD
f wOf0 a i..
V Z0H
Ad JLLQ W
a YwC Z W
L ys Q Q o Z m a
r i ch
CCCU a� N U) o y
Pe Rd, s G •— 0 LU CL > J
I 0 2 0
t I ETrawick R n E Q W 0 O
e L e Says M N
a 9 LLI
N II J � O o O
aig m i m / •V 2 O 0'
a OPa`rl \ CL
h / Z IZ W II II
To
0 Z
r •
e boq e�y a rn `�ssa W W
a Q i
O w �
^e m P P o tue alemp o� J
Gm w iS aP S,g N 15 I� Al U)
P�
�O
�A
P�
dJ
G�
�O
ERWIN -MILBURNIE 230KV
LO o
O I- T N
"It N
a
MILBURNIE-SELMA 115KV co N w
�F—N
00
a��ys
wjay� HARRIS PLANT-WAKE 230KV 0 0
-----------
z
Ob.0
1, uj Q
/) / °w U
N
0Y
\ �N / 0 m
\ C'N
CL
v w 4�
U �
� s
Sao
Q� mF evi\ r
J
-to,•{r. 7" �t �• �.• A t•�' ark' �.'► '8�'
AOA
`'' �''r• •' ' 1 J` ' . d'
4.1
,r � ..Ak 0.03 ac �x
Forested :►
• S ► t ,. {;
si
a Perennial
A 1 I Pnrgth: 193 ft
� � i j���r�1w 1 •♦_..a-. pia. . � l.. S .�.
w , 4i•y� •`.i•i—!� �•. t
.. / ,fir S,a..{, lei +�f'� 1fi• 4 t' •!L 1• .
31
Proposed Loop Lines'
Study Corridor'
Jurisdictional Wetland`
Jurisdictional Stream**
__..
•Location and extent is approximate. - � � h�-�•'�. � + '•' �►
"Subject to a 50 ft Neuse River 4�'
Riparian Buffer.
Fat + ,
Fieldwork and Grephics Uarleenar:r1e lnf �t " �on M room Is Poe nlor ba l puryoeee
Source'.IS.5 Dgi51 Raster Grap�a, rally and wee not peperod kw.and ie rot wltabw kr bpa:m arglnemkg
PMMU Emu] Gwv Ouadm•pfe,ta9a;ft)ed bw aaY by purpoeee.Tltis nlormatlon pawKed a not ror repulaloy rev ow and a inW4ed
aoprxb_rokd by ESI. t wimnmental Services,InC. f.uee ody by a Pro}easldw LaM Surveyor PW to mpula!nry iavkw
ENVIRONMENTAL General jurisdictional Layout Project: ER06039.20
SERVICES,INC. Date: Oct 2007
524 S.New Ho;e Road Garner- 1140 Substation Loop Lines
RaleigN%bmcaraina 27e10 Drwn/Chkd: KT/JH
J912) -1790
(el1s)212-17
07 rM Wake County, North Carolina
ranne.rrv:ranmanMsu�iceamc dom Figure: 2