Loading...
HomeMy WebLinkAbout20080043 Ver 1_CC 401 Application_20080107 08 - 0043 Progress Energy 9 9Y December 11, 2007 Mr. Eric Alsmeyer Raleigh Regulatory Field Office (� D Corps of Engineers h tl 6508 Falls of the Neuse Road, Suite 120 Raleigh, NC 27615 JAN 7 2008 QENR-VATER QUALM Ms. Cyndi Karoly l%-TiANDS AND sroRMWATFR SkAN° Wetlands Unit, Division of Water Quality Department of Environment and Natural Resources Mail Service Center 1650 Raleigh,NC 27699-1650 Subject: Courtesy Notification of Progress Energy Carolina's Planned Erwin—Milburnie 230kV Transmission Loop Line Dear Mr. Alsmeyer and Ms. Karoly: Progress Energy Carolinas, Inc. (PEC) will construct a new loop line into the new Garner 1-40 230 KV substation in southeastern Wake County by looping the existing Erwin — Milburnie 230 KV Line into and out of the new substation. There are wetlands on the proposed project right-of-way (ROW). There is one jurisdictional stream, jurisdictional under the Neuse riparian buffer rules, which will be spanned by the proposed line. There will be no discharges to the streams, no increase in impervious surface, nor will there be any changes in existing surface water flow patterns (i.e., no redirection or concentration of flow through cuts, fills, ditches, etc.). The stream channel is jurisdictional under NCDWQ's riparian buffer rules (i.e., are shown on USGS topo or soil survey maps), However, the "Table of Uses" in the buffer rules specifically exempts certain overhead electric line crossings, as long as those crossings comply with certain best management practices (BMPs). PEC's proposed line will comply with the buffer rule exemption's BMPs, without notification to NCDWQ, PEC would note that since this stream is considered potential habitat for the dwarf wedgemussel, a survey for the mussel's presence was conducted. No mussels were found, and the USF&WS authorized PEC to proceed with the project. PEC will attempt to leave as much riparian vegetation as possible, to comply with both the riparian buffer rules and to ensure suitable habitat for the mussel, should it re-populate this stream. PEC is providing this project description to you should you receive inquires about the work, or should you wish to visit the project. Progress Energy Service Company,LLC P.O.Box 1551 Raleigh,NC 27602 PEC is providing this project description to you should you receive inquires about the work, or should you wish to visit the project. ROW clearing for this project is scheduled to begin in February 2008 and will be completed by the end of February 2008. Construction will be completed by June 1, 2008. Should you or others of the Land Quality Section staff wish to visit this project, please contact Mr. Buzz Bryson in the Environmental Permitting and Compliance Unit at 919- 546-6637 (office), 919-812-1120 (cell) or buzz.bryson u,pgnmail.com (e-mail). Thank you for your consideration. Very truly yours, Z. P" , /'-7. Raymond L. Davis, Jr. General Manager— Construction & Engineering RLD/wtb Enclosures: 1. Project Location Map 2. Aerial Photo of Project Route cc: Mr. Billy Harrell Mr. Baxter Matheson Mr. Buzz Bryson Mr. Mark Smith Mr. Bryan Hoffman Mr. Tony Warren c W z �n CD f wOf0 a i.. V Z0H Ad JLLQ W a YwC Z W L ys Q Q o Z m a r i ch CCCU a� N U) o y Pe Rd, s G •— 0 LU CL > J I 0 2 0 t I ETrawick R n E Q W 0 O e L e Says M N a 9 LLI N II J � O o O aig m i m / •V 2 O 0' a OPa`rl \ CL h / Z IZ W II II To 0 Z r • e boq e�y a rn `�ssa W W a Q i O w � ^e m P P o tue alemp o� J Gm w iS aP S,g N 15 I� Al U) P� �O �A P� dJ G� �O ERWIN -MILBURNIE 230KV LO o O I- T N "It N a MILBURNIE-SELMA 115KV co N w �F—N 00 a��ys wjay� HARRIS PLANT-WAKE 230KV 0 0 ----------- z Ob.0 1, uj Q /) / °w U N 0Y \ �N / 0 m \ C'N CL v w 4� U � � s Sao Q� mF evi\ r J -to,•{r. 7" �t �• �.• A t•�' ark' �.'► '8�' AOA `'' �''r• •' ' 1 J` ' . d' 4.1 ,r � ..Ak 0.03 ac �x Forested :► • S ► t ,. {; si­ a Perennial A 1 I Pnrgth: 193 ft � � i j���r�1w 1 •♦_..a-. pia. . � l.. S .�. w , 4i•y� •`.i•i—!� �•. t .. / ,fir S,a..{, lei +�f'� 1fi• 4 t' •!L 1• . 31 Proposed Loop Lines' Study Corridor' Jurisdictional Wetland` Jurisdictional Stream** __.. •Location and extent is approximate. - � � h�-�•'�. � + '•' �► "Subject to a 50 ft Neuse River 4�' Riparian Buffer. Fat + , Fieldwork and Grephics Uarleenar:r1e lnf �t " �on M room Is Poe nlor ba l puryoeee Source'.IS.5 Dgi51 Raster Grap�a, rally and wee not peperod kw.and ie rot wltabw kr bpa:m arglnemkg PMMU Emu] Gwv Ouadm•pfe,ta9a;ft)ed bw aaY by purpoeee.Tltis nlormatlon pawKed a not ror repulaloy rev ow and a inW4ed aoprxb_rokd by ESI. t wimnmental Services,InC. f.uee ody by a Pro}easldw LaM Surveyor PW to mpula!nry iavkw ENVIRONMENTAL General jurisdictional Layout Project: ER06039.20 SERVICES,INC. Date: Oct 2007 524 S.New Ho;e Road Garner- 1140 Substation Loop Lines RaleigN%bmcaraina 27e10 Drwn/Chkd: KT/JH J912) -1790 (el1s)212-17 07 rM Wake County, North Carolina ranne.rrv:ranmanMsu�iceamc dom Figure: 2