Loading...
HomeMy WebLinkAboutNCC242657_ESC Approval Submitted_20240829 Dennis Gilbert From: SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov> Sent: Tuesday, August 27, 2024 12:14 PM To: Dream Finders Homes, LLC Cc: Dennis Gilbert;Andrew Conner Subject: NC DEMLR - FROF Application Approval CRM:0177156 Attachments: Letter of Approval -Tuesday, August 27, 2024 1208 PM.docx; Application Report - Tuesday, August 27, 2024 1208 PM.pdf; Certificate of Approval - Tuesday, August 27, 2024 1208 PM.docx ..LAP" +5°1 f , p %l + fr w//:, s_t ', vC>ilnrnwnt�: North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Land Quality Section Roy Cooper Governor Elizabeth S. Biser Secretary William Vinson Jr. (Acting) Director 08-27-2024 LETTER OF APPROVAL Dream Finders Homes, LLC 3709 Raeford Road, Suite 200 Fayetteville, NC 28304 RE: Project Name: Blackhawk Landing—Lot 69 Acres Approved: 0.17 Application ID: PA-006282 Permit T umber: HOKE-2025-00175 Address:)Hornet Drive City: McLauchlin Township County: Hoke River Basin: Cape Fear j 1 Stream Classification: C: Aquatic Life, Secondary Contact Recreation, Fre sh water Plan Type:New Plan Dear Dream Finders Homes, LLC, This office has rev ewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The Certificate of Approval must be posted at the job site. This plan approval shall expire three (3)years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 48 .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requ sting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. After the orm is reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FR form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity,: The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form Ito the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1.The approved E&SC plan as well as any approved deviation. 2.The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this(letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensue compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliant !with the Act. Acceptance and a proval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. ,Please note that this approval is based in part on the accuracy of the information provided in the Financial !Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. 'Your cooperation is appreciated. Sincerely, ' Chris Baker, Assistant Regional Engineer cc: 1 Dennis Gilbert, P. E., Moorman, Kizer& Reitzel, Inc. Andrew Conner, Hoke County Inspection Office Fayetteville Regional Office 2 I I North Carolina Department of Environmental Quality 1 Division of Energy, Mineral and Land Resources ,i Fayetteville Regional Office 1 225 Green Street, Suite 714 1 Fayetteville N ,28301-5095 910-433-3300 0a:an.+.m awgr 17 mail cones x)tadriaCE=f b and from this oddiess inay tr, bji ct . PI Noft C.rril,r t'.1h1K Pecor,'s ,a tw and nay he a .r Ii c„,d to third parties by ai; nut cn/Cct ..tate otfI(;.al. I it 1 1 1 3