HomeMy WebLinkAboutWQ0045516_YMCA_Camp_Weaver_Sewer_Extension_FTSSE_Updated_FTSE10-23_2nd_Submission_20240726Entity Requesting Allocation:
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking for Sewer Extension Applications
(FTSE 10-23)
YMCA of Greensboro
Project Name for which flow is being requested: YMCA Camp Weaver Sewer Extension
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: T.Z. Osborne
b. WWTP Facility Permit #:
NCO047384
c. WWTP facility's permitted flow
d. Estimated obligated flow not yet tributary to the WWTP
e. WWTP facility's actual avg. flow
f. Total flow for this specific request
g. Total actual and obligated flows to the facility
h. Percent of permitted flow used
All flows are in MGD
56.0
4.84
35.4100
0.020
42.1986
75.4%
Il. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
(B)
(C)
(D)=(B+C)
(E)=(A-D)
Design
Obligated,
Pump
Pump
Average
Approx.
Not Yet
Total Current
Station
Station
Firm
Daily Flow**
Current
Tributary
Flow Plus
(Name or
Permit
Capacity, *
(Firm / p fl,
Avg. Daily
Daily Flow,
Obligated
Available
Number)
No.
MGD
MGD
Flow, MGD
MGD
Flow
Capacity***
StewartNAJI
38555
10.224
4.963
1.796
0.02
1.816
3.147
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be
achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not
less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located between the
project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Cite of Greensboro T.Z. Osborne
Downstream Permit Number: NC047384
Page 1 of 6
FTSE 10-23
III. Certification Statement:
I Wendy Messer certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and II plus all attached planning assessment addendums for which I
am the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
u�
Signing Official
E=wently.humpM1rey-messer�9re ■ OU=C,t-ncgov, 0-Rernurcea DepaNnent, 011=City of
Greensboro, ON=Weptly fvleseer
Dafe: zaza.ozze f f:aesvoa•oo•
Wendy Messer
7/a 5/2 y
Date
No
Page 2 of 6
FTSE 10-23