HomeMy WebLinkAboutNCC242653_ESC Approval Submitted_20240828 Dennis Gilbert
From: SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov>
Sent: Tuesday, August 27, 2024 11:53 AM
To: A&G Residential, LLC
Cc: Dennis Gilbert;Andrew Conner
Subject: NC DEMLR - FROF Application Approval CRM:0177153
Attachments: Certificate of Approval - Tuesday, August 27, 2024 1145 AM.docx; Application Report -
Tuesday, August 27, 2024 1145 AM.pdf; Letter of Approval - Tuesday, August 27, 2024
1145 AM.docx
litth
ur , , `,AD'''—-- ,4$1,/,,e
, !‘ 2 -:„, ,,
., ...,„
.,„,
, -
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director
08-27-2024
11 LETTER OF APPROVAL
A&G Residential, LLC
916 Arsenal Avenue, Suite B
Fayetteville, NC 28305
RE: Project Name: Bedford, Phase 5—Lots 382,385,386,454,457&459
Acres A proved: 1.55
Application ID: PA-006494
Permit Number: HOKE-2025-00173
Address: Brickhill Drive
City: MciLauchlin Township
County: Hoke
River Basin: Cape Fear
1
li
Stream classification: C: Aquatic Life, Secondary Contact Recreation, Fresh water
Plan Type:New Plan
Dear A&G Residential, LLC,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and
hereby issue this Letter of Approval. The Certificate of Approval must be posted at the job site. This plan approval shall
expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by
Title 15A NCAC 4E3 .0129.
As of April 1, 201 , all new construction activities are required to complete and submit an electronic Notice of Intent
(eNOI)form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General
Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the
1$120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party
shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land
disturbing activity, The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOl form
to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,
the new responsible party must obtain a new COC.
Title 1 SA NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with
the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural
resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to
insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting
date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Chris Baker, Assistant Regional Engineer
Dennis Gilbert, P. E., Moorman, Kizer& Reitzel, Inc.
Andrew Conner, Hoke County Inspection Office
Fayetteville Regional Office
2
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Qi(1)
Fayetteville Regional Office 1225 Green Street,Suite 714 I Fayetteville NC,28301-5095
910-433-3300
��ar:ir f,��,rru�,I,aNarx i �i, „r�9i.„lu.>r�to a�rd >�rtrk;sb.. ....,._.�.,_...�
:',�f��:pond. c. :k� �t11mm tt r<9tt ,.�.a�ay k.< !,<ar,t �,tm No + ,..<'bm, , L 1 y an authorized
3