HomeMy WebLinkAboutNCC242484_ESC Approval Submitted_20240827 Wood, Jon
From: SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov>
Sent: Friday, January 26, 2024 10:49 AM
To: Hammett, Sparty
Cc: Dumpor, Samir;Jones, Jerry R; Pullinger, Robert C; Herring, Kyle
Subject: NC DEMLR - FROF Application Approval, Newland Park CRM:0109056
Attachments: Certificate of Approval - Friday, January 26, 2024 909 AM.docx
STA1
MAY zo,r>>s �/O
1
41. 10474;
r. o5 " ,
4.40‘;.
‘As*F ��qrt rz. i ryie
QUAM V1d - --
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director
01-26-2024
LETTER OF APPROVAL
Pasquotank County
Attn: Mr. Sparty Hammett, County Manager
206 E. Main Street
Elizabeth City, NC 27909
RE: Project Name: Newland Park
Acres Approved:9
1
Application ID: PA-002045
Permit Number: PASQU-2024-01 02
Address: US 158
City: Elizabeth City
County: Pasquotank
River Basin: Pasquotank
Stream Classification:SW:Swamp Waters;WS-V:Water Supply V
Plan Type: New Plan
Dear Hammett,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and
hereby issue this Letter of Approval. The Certificate of Approval must be posted at the job site. This plan approval shall
expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by
Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent
(eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General
Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the
$120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party
shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land
disturbing activity. The eNOl form may be accessed at deq.nc.gov/NCG01 fdeq.nc.govl. Please direct questions about the
eNOI form to the Stormwater Program staff[deq.nc.gov] in the Raleigh central office. If the owner/operator of this project
changes in the future, the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site:
1.The approved E&SC plan as well as any approved deviation.
2.The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with
the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural
resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to
insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting
date for this project. Please notify us if you plan to have a preconstruction conference.
2
Your cooperation is appreciated.
Sincerely,
J. Randall Jones, Jr., PE for
Samir Dumpor, PE
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
D ........:1 North Carolina Department of Environmental Quality I Division of Energy,Mineral
and Land Resources
Washington Regional Office I 943 Washington Square Mall I Washington NC,27889
252-946-6481
Denartrnant of Environmental Ouayty
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
This message has originated from an External Source. Please use proper judgment and caution when
opening attachments, clicking links or responding to this email.
3