HomeMy WebLinkAboutNCG550229_Compliance Evaluation Inspection_20170530 • ROY CQOPEit
Coveimir
MICHAEL'S. REGAN,
• seaway
Water Resources
S.JAY ZIMMERMAN
May 30, 2017 RECEIVED
D A Thacker
433 Boggs Ranch Rd JUN 0 5 2017
Graham, NC 27253
CENTRAL FILES
DWR SECTION
SUBJECT: Compliance Evaluation Inspection Report
Certificate of Coverage N-. c_2!2.221under NPDES General Permit NCG550000
Facility Located at 433 Boggs Ranch Rd, Graham, Alamance County
Dear Mr.Thacker:
On May 25, 2017, Paul DiMatteo and George Smith of the Division of Water Resources ("Division"),
Winston-Salem Regional Office met with you to conduct a Compliance Evaluation Inspection of the above
referenced wastewater treatment system. The Division is required to inspect these types of systems at least
every 5 years. An inspection summary follows and an inspection report is attached for your records.
Site Review
1. The system consists of a septic tank, 2 subsurface sand filters in series, chlorination, and step
aeration,with final disposal to Mocassin Creek, a tributary of Big Alamance Creek. Chlorine tablets
were observed.in the chlorinator. You stated you installed a screen around the aerator to keep it
free of debris and leaves.The discharge pipe was observed to be intact.
2. No discharge was observed at the time of inspection, despite recent heavy rain. No sewage
malfunction was observed at the sand filters.
3. You indicated that the septic tank is pumped as needed, about every 5-8 years.
4. During the inspection, you stated that a discharge has never been observed from the pipe. If you
notice any future discharge, please have the effluent monitoring performed as required in the
permit.
Documentation &Monitoring Review
A review of documentation was not conducted at the time of inspection. We would like to remind you
to conduct and document the following:
- Inspect the septic tank and secondary tanks at least yearly to determine if solids must be removed.
- Pump the septic tank every 5 years, or when the solids level is found to be more than 1/3 of the
liquid depth in any compartment, whichever is greater. All tanks should be emptied of their
contents whenever any of the tanks meet this requirement.
- Contents removed from septic tanks shall be disposed of at a location and in a manner compliant
with all local and state regulations.
State of North Carolina I Environmental Quality I Water Resources
450 West Hanes Mill Road,Suite 300,Winston-Salem,NC 27105
336-776-9800
E
- Inspect the outfall location at least twice per year to ensure that no visible solids or other obvious
evidence of system malfunctioning is observed.
- Inspect the tablet chlorinator(if applicable) at least weekly to ensure there is an adequate supply
of tablets for continuous & proper operation.Tablets used for chlorination must be labeled for
wastewater use.
- Any monitoring data obtained shall be retained onsite for a minimum of 5 years.
- Additional requirements as stated in NCG550000.
There were no significant issues noted during the inspection;therefore, a response to this report is not
required.
If you should have any questions, please do not hesitate to contact our office at 336-776-9800.
Sincerely,
•
•
fo/Sherri V. Knight, P.E., Regional Supervisor
Water Quality Regional Operations Section
Winston-Salem Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS—Inspection Report and Summary
Cc: WQS Winston-Salem Regional Office- Enforcement File
NPDES Co liance/Enforcement Unit- Enforcement File
entral Files
State of North Carolina I Environmental Quality I Water Resources
450 West Hanes Mill Road,Suite 300,Winston-Salem,NC 27105
336-776-9800
United States Environmental Protection Agency Form Approved.
EPA Washington,D.C.20460 OMB No.2040-0057
Water Compliance Inspection Report Approval expires 8-31-98
Section A:National Data System Coding(i.e.,PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 Li 2 I5 j 3 I NCG550229 111 12 I 17/05/25 117 18 1,.1 19 I 2011
21111111111111111111111111111111111111111111 I66
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ---- ---Reserved --
67I I 70 Li 711 I 72 Li] 731
1 174
751 1 1 1 1 1 1 180
Section B:Facility Data
Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date
POTW name and NPDES Dermit Number) 10:45AM 17/05/25 13/08/01
433 Boggs Ranch Road
433 Boggs Ranch Rd Exit Time/Date Permit Expiration Date
Graham NC 27253 •
11:00AM 17/05/25 18/07/31
Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data
///
Name,Address of Responsible Official/Title/Phone and Fax Number
Contacted
D A Thacker,433 Boggs Ranch Rd Graham NC 27253//336-227-9955/
No
Section C:Areas Evaluated During Inspection(Check only those areas evaluated)
III Other
Section D:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date
GeorgePaul
Matteo
1 r S Smith WSRO WQ//336-776-9700/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
C l / u/7
EPA Form 3560-3(Rev 9-94)Previous editions are obsolete.
Page# 1
NPDES yr/mo/day Inspection Type (Cont.) 1
31 NCG550229 111 121 17/05/25 117 18 I c I
Section D:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
Met Mr. Thacker on site.
-System consists of a septic tank, 2 subsurface sand filters in series, chlorination and step
aeration,with final disposal to Mocassin Creek, a tributary of Big Alamance Creek. Chlorine tablets
were observed in the chlorinator. Mr.Thacker installed a screen around the aerator to keep it free of
debris and leaves.The discharge pipe was observed to be intact.
- No discharge was observed at the time of inspection, despite recent heavy rain. No sewage
malfunction was observed at the sand filters.
- Mr.Thacker indicated he has the septic tank pumped as needed, about every 5-8 years.
During the inspection, Mr. Thacker stated that a discharge has never been observed from the pipe. If
you notice any future discharge, please have the effluent monitoring performed as required in the
permit.
Documentation & Monitoring Review
A review of documentation was not conducted at the time of inspection.We would like to remind you to
conduct and document the following:
- Inspect the septic tank and secondary tanks at least yearly to determine if solids must be removed.
- Pump the septic tank every 5 years, or when the solids level is found to be more than 1/3 of the
liquid depth in any compartment,whichever is greater. All tanks should be emptied of their contents
whenever any of the tanks meet this requirement.
Contents removed from septic tanks shall be disposed of at a location and in a manner
compliant with all local and state regulations.
- Inspect the outfall location at least twice per year to ensure that no visible solids or other obvious
evidence of system malfunctioning is observed.
- Inspect the tablet chlorinator(if applicable)at least weekly to ensure there is an adequate supply of
tablets for continuous & proper operation.Tablets used for chlorination must be labeled for wastewater
use.
- Any monitoring data obtained shall be retained onsite for a minimum of 5 years.
- Additional requirements as stated in NCG550000.
Page# 2
•
Permit: NCG550229 Owner-Facility: 433 Boggs Ranch Road
Inspection Date: 05/25/2017 Inspection Type: Compliance Evaluation
Other Yes No NA NE
' Comment: See attached summary and letter.
Page# 3