Loading...
HomeMy WebLinkAboutNC0032131_Response to Notice_20240805 Z IRPB Systems Construction Services•Contract Operations•Maintenance August 5, 2024 Mr. Lon Snider NCDWR,NCDEQ Winston-Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston-Salem,NC 27105 Re: Notice of Violation NOV-2024-LV-0648 NPDES NCO032131 Tweetsie Railroad Mr. Snider, This letter is in response to NOV-2024-LV-0648 letter dated 7-17-24 to Tweetsie Railroad attached. Per your letter the BOD results exceeded the daily limit of 7.5 mg/1 with a 7.9 mg/1 on 5- 21-24 and 23.4 mg/1 on 5-29-24. This resulted in exceeding the monthly average for the month with a 9.15 mg/1 over the 5 mg/1 limit. Ammonia nitrogen exceeded the monthly average limit of 2 mg/1 with a 2.35 mg/l average. The operator noted the effluent was affected by the season grand opening with increased flows and organic loading. One of the two sludge return valve broke due to age and has been replaced but affected the solids level and overall treatment. If you have any questions, please call anytime. ICU' '58w Robert Barr P.O. Box 1325 Asheville,N.C. 28802 (828)-251-1900 (828)-251-1945