HomeMy WebLinkAboutNCC242629_ESC Approval Submitted_20240827 Dennis Gilbert
From: SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov>
Sent: Friday, August 23, 2024 9:55 AM
To: Onsite Homes, LLC
Cc: Dennis Gilbert; Debra Ensminger
Subject: NC DEMLR - FROF Application Approval CRM:0177147
Attachments: Application Report - Friday, August 23, 2024 952 AM.pdf; Letter of Approval - Friday,
August 23, 2024 952 AM.docx; Certificate of Approval - Friday, August 23, 2024 952
AM.docx
cyAir Ai!
tf1iIAM VILnR\
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director
08-23-2024
LETTER OF APPROVAL
•
Onsite Homes, LLC
2931 Breezewood Avenue, Suite 202
Fayetteville, NC 28303
RE: Project Name: Woodlake Country Club, Section 7, Page 19—Lot 5009& Section 11, Page 4—Lot 5182
Acres Approved: 0.35
Applicatio,n ID: PA-006623
Permit Number: MOORE-2025-0191
Address: Ginseng Drive
City: Little River Township
county: Moore
River Basin: Cape Fear
1
Stream CI ssification: WS-III: Water Supply I III
Plan Type,New Plan
Dear Onsite Homes, LLC,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and
hereby issue this Letter of Approval. The Certificate of Approval must be posted at the job site. This plan approval shall
expire three (3)years following the date of approval, if no land-disturbing activity has been undertaken, as is required by
Title 15A NCAC 40 .0129.
iAs of April 1, 201 , all new construction activities are required to complete and submit an electronic Notice of Intent
(eN01) form requ sting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General
Permit. After the orm is reviewed and found to be complete, you will receive a link with payment instructions for the
$120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party
shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land
disturbing activity. The eN01 form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eN01 form
to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,
the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site:
1.The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
'Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with
the approved pla .
;North Carolina's S dimentation Pollution Control Act is performance-oriented, requiring protection of existing natural
r.
resources and adj ining properties. If, following the commencement of this project, the erosion and sedimentation
control plan is ina equate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 1 3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to
insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing
activity. This approval does not supersede any other permit or approval.
'Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting
date for this project. Please notify us if you plan to have a preconstruction conference.
Chris Baker, Assistant Regional Engineer
cc:
Dennis Gilbert, P. E., Moorman, Kizer & Reitzel, Inc.
Debra Ensminger, Moore County Inspections Office
Fayetteville Regional Office
1 2
North Carolina Department of Environmental Quality Division of Energy,Mineral and Land Resources
Fayetteville Regional Office 225 Green Street,Suite 714 Fayetteville NC,28301-5095