Loading...
HomeMy WebLinkAboutNCC242619_Site Plan or Location Map_20240827 PROJECT LOCATION tp _hi.pw L '' ilkikilliiiRillikair"all.laa', 41 DU KE ...0.0s. Av. ,4, .„.......,$.4.... : —411\ 40 Molt 161444111111L 4 ,, - 41iiiwaita 4141 41.4rpir ltiplAvivoi E N E RGY® igalitk._J.** CAROL NAB trov NORTH & SOUTH CAROLINA STATE MAP ENBRIDGE TAP LINE - PHASE 1 PROJECT NARRATIVE E D E N , NC THE PROPOSED ENBRIDGE TAP LINE-PHASE 1 PERMITTING PROJECT IS LOCATED IN ROCKINGHAM COUNTY,NORTH CAROLINA.THE PROJECT INVOLVES UPGRADES TO THE EXISTING RIDGEWAY 138KV TRANSMISSION LINE FROM THE EXISTING MOTLEY TIE SUBSTATION TO STRUCTURE 29.0 AND IS APPROXIMATELY 2.8 MILES IN LENGTH.THE PROPOSED LIMITS OF DISTURBANCE IS 42.5 ACRES.IN ORDER TO ACCOUNT FOR ALTERNATIVE CONSTRUCTION METHODS,OR THE SHEET LIST: NEED FOR ACCESS TO OTHER TOWERS,AN ADDITIONAL 10%OF TOTAL PROPOSED WORK AREA HAS BEEN INCLUDED IN THE PERMITTING FEE.THE ADDITIONAL 10%OF ACREAGE IS EQUAL TO 4.3 ACRES AND RESULTS IN A TOTAL AREA OF 46.8 ACRES.PRIOR TO CONSTRUCTION,A DUKE ENERGY CONSTRUCTION CONTRACTOR WILL INSTALL EROSION AND START END TITLE SHEET SHEET PTL SEDIMENT CONTROL MEASURES TO ENCOMPASS THE ANTICIPATED CONSTRUCTION LIMITS.PREDEVELOPMENT CONDITIONS WILL BE RESTORED AND THE AREA WILL BE STABILIZED PRIOR TO COMPLETION OF CONSTRUCTION.AN EROSION AND SEDIMENT CONTROL NOTES SHEET PEN1 AVOIDANCE AND MINIMIZATION OF DISTURBANCE APPROACH HAS BEEN INCORPORATED INTO THE DESIGN OF THE LATITUDE: 3 6°29'43"N LATITUDE: 36°31'4 8"N EROSION AND SEDIMENT CONTROL NOTES SHEET PEN2 EROSION CONTROL MEASURES BY UTILIZING EXISTING ACCESS POINTS AND STABILIZED RIGHT-OF-WAY ACCESS ROUTES, EROSION AND SEDIMENT CONTROL NOTES SHEET PEN3 WHENEVER POSSIBLE.EROSION CONTROL MEASURES ARE INDICATED HEREIN FOR PERMITTING USE ONLY BY NCDEQ. LONGITUDE: 79°43'15"W LONGITUDE 79°43'46"W THE INITIAL PROJECT DURATION IS ANTICIPATED TO START IN AUGUST 2024 AND BE COMPLETED IN AUGUST 2025. OVERALL SHEET LAYOUT SHEET PLA1 PROPERTY OWNER INFORMATION 1 SHEET PLA2 PROPERTY OWNER INFORMATION 2 SHEET PLA3 ,. N EROSION AND SEDIMENT CONTROL PLAN SHEET P1 ° CASCADE AVE (SR-1 741) EROSION AND SEDIMENT CONTROL PLAN SHEET P2 �, EROSION AND SEDIMENT CONTROL PLAN SHEET P3 EROSION AND SEDIMENT CONTROL PLAN SHEET P4 END OF PROJECT EROSION AND SEDIMENT CONTROL PLAN SHEET P5 GENERAL NOTES ENBRIDGE TAP LINE- PHASE 1 v 't _.. EROSION AND SEDIMENT CONTROL PLAN SHEET P6 1. APPROXIMATE STRUCTURE LOCATIONS WERE PROVIDED BY DUKE ENERGY LINE ENGINEER AND ARE - `, 'F EROSION AND SEDIMENT CONTROL PLAN SHEET P7 FOR REFERENCE ONLY. THESE DRAWINGS SHALL NOT BE USED FOR LINE CONSTRUCTION. FRIENDLY RD i% ' - EROSION AND SEDIMENT CONTROL PLAN SHEET P8 2. BASE DRAWINGS WERE CREATED FROM GIS DATA OBTAINED FROM VARIOUS SOURCES.AERIAL (SR-1797) '`1 PHOTOGRAPHY WAS OBTAINED FROM STATE AGENCIES. ` `' CLARENCE HALE EROSION AND SEDIMENT CONTROL DETAILS SHEET PED1 3. NOT ALL EXISTING UTILITIES ARE SHOWN. LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE ,•„MOTOR SALES EROSION AND SEDIMENT CONTROL DETAILS SHEET PED2 CONTRACTOR'S RESPONSIBILITY TO ACCURATELY LOCATE,BOTH VERTICAL AND HORIZONTAL, - EROSION AND SEDIMENT CONTROL DETAILS SHEET PED3 EXISTING UTILITIES PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY NC 811 PRIOR TO EXCAVATION. CONTRACTOR SHALL NOTIFY DUKE ENERGY IMMEDIATELY IN THE EVENT OF ENCOUNTERING ANY UNDERGROUND OBSTACLE REQUIRING DEVIATION FROM THE PLAN. COST TO REPAIR DAMAGED UTILITIES SHALL BE BORNE BY THE CONTRACTOR. INDUSTRIAL DR -"s 4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR ., f(SR-1798) A. `• - SHALL NOT DISTURB UTILITY POLES,GUY WIRES,OR ANCHORS WITHOUT PERMISSION FROM DUKE - ENERGY. SUMMIT RD (SR-1714) 5. PROJECT IS LOCATED IN THE ROANOKE RIVER BASIN. THE PROJECT IS SUBJECT TO r `'` MIGRATORY BIRD HOTLINE STATE-REGULATED BUFFER REQUIREMENTS. I RAILROAD� - STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY 6. SEE SHEET PEN1 FOR EROSION AND SEDIMENTATION CONTROL NOTES,CONSTRUCTION SEQUENCE, -y"'. SERVICE AREA.INTERACTIONS OF BIRDS WITH GENERATING FACILITIES,TRANSMISSION AND DISTRIBUTIONS, AND SEEDING SCHEDULE. - 1 E MEADOW RD (US-31 1)I SUBSTATIONS,OTHER STRUCTURES AND EQUIPMENT,AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO 7. STREAMS EXTEND BEYOND THE RIGHT-OF-WAY. APPROPRIATE BRIDGING AND MATTING OF THESE ' BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND FEATURES IS REQUIRED SHOULD THE CONTRACTOR USE ANY ACCESS ROUTES LOCATED OUTSIDE OF �EIELDCREST RD (SR 700) GILDAN ACTIVEWEAR CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES. THE RIGHT-OF-WAY. DISTRIBUTION ,' ,; A; RAILROAD 8. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY DUKE ENERGY FREEDOM PARK _ r „,s,, '.- CAROLINAS:JAMES MCRACKEN 704.996.8671 FLORIDA:727.386.3084 MIDWEST:317.430.4497 W PERMITTING PRIOR TO USE. Z ".a E STADIUM DR (SR-1747) 9. CONSTRUCTION ENTRANCES ARE SHOWN FOR REFERENCE ONLY. HEAVY MATS MAY BE USED IN LIEU N EDGEWOOD RD I ` SPILL REPORTING HOTLINE Q OF ROCK CONSTRUCTION ENTRANCES IF DEEMED SUFFICIENT BY A DUKE ENERGY REPRESENTATIVE. • - - I 10. WETLAND MATTING SHALL BE COMPOSITE MATS. NO LATTICE OR TWO-PLY MATTING SHALL BE USED -MEADOWGREEN ,;.= R' IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT,FEDERAL AND STATE LAWS D_ IN JURISDICTIONAL WETLANDS AND/OR STREAMS. ` VILLAGE, DR , FURNITURE REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER 11. NO OIL/FUEL-FILLED EQUIPMENT SHALL BE STORED OVERNIGHT WITHIN 100 FEET OF WETLANDS OR TRANSPORT REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION.IMMEDIATELY NOTIFY YOUR W SURFACE WATER WITHOUT CONTAINMENT. S EDGEWOOD RD; WAREHOUSE ,i SUPERVISOR AND THE FIELD ENVIRONMENTAUEHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS Z 12. SITE SHOULD BE"STORM READY"AT THE END OF EACH WORK DAY/WEEK. ;- (SR-1779) ,,;.. DISCOVERED.IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAUEHS PROFESSIONAL,CONTACT ONE OF y DAN RIVER THE DUKE ENERGY SPILL REPORTING HOTLINES AT: 13. SECURE WRITTEN ACCESS AGREEMENT IS REQUIRED FOR ALL 3RD PARTY ACCESS AND PRIVATE ) "` CAROLINAS&MIDWEST:800.527.3853 0_ DRIVES NOT INCLUDED IN ROW DOCUMENTATION PRIOR TO BEGINNING CONSTRUCTION. RIVER , v ,'� -� • ' FLORIDA:866.769.1266 14. ALL DISTURBED AREAS SHALL BE RESTORED TO SAME OR BETTER CONDITION.PERMANENT GROUND LLJ COVER SHALL BE USED FOR STABILIZATION. SST AM STATION ,rs•I '-BEGINNING OF PROJECT 15. CONTRACTOR TO FIELD ADJUST CRANE AND PULL PADS AS NEEDED FOR SAFE ACCESS UNDER ENBRIDGE TAP LINE- PHASE 1 CONTACTS p EXISTING ENERGIZED ELECTRICAL OVERHEAD LINES. — JEFF GOTO ENGINEER: RESPONSIBLE FOR MAINTENANCE: Ct DUKE ENERGY CAROLINAS HDR ERIC SHOOK CO VICINITY MAP 525 SOUTH TRYON ST. PRANCES LUNTE,PE PH:(336)941-0006 Z CHARLOTTE,NC 28202 440 S.CHURCH STREET Eric.Shook@duke-energy.com W CONTRACTOR SHALL NOTIFY "NORTH CAROLINA ONE CALL' (811) SCALE: 1"=2500' PH:(760)445-3332 SUITE 1200 OR (1-800-632-4949) AT LEAST 48 HOURS PRIOR TO FAX:(704)382-6542 CHARLOTTE,NC BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING 8141 Jeff.Goto@duke-energy.com PH:(919)900-1616 UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL frances.lunte@hdrinc.com UTILITIES THAT PROVIDED THEIR OWN LOCATOR SERVICES INDEPENDENT OR "NORTH CAROLINA ONE CALL'. REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. DUKE TITLE ARO''+ HDR Engineering Inc. i ENBRIDGE TAP LINE-PHASE 1 IMC811.0AM� 2 Q�FSS/ yl of the Carolinas R 1 V4141 l(` s„41 440 S. Church St Suite 1200 lur ENERGY® TITLE SHEET 2 10395896 7/17/2024 ISSUED FOR PERMITTING NC BA FSL (UPd57YJX'170 /'7wws FD/ char3lotte,Nc 28202-2075 1 10395896 7/15/2024 90%ISSUED FOR REVIEW NC BA FSL `-ev g 2 04.338.6700 CAROLINAS • GINS J; 0 10395896 6/21/2024 70%ISSUED FOR REVIEW NC BA FSL `,,ZFs"Ca�,'',oyy0 N C.B.E L.S.License Number F-0116 525 C SOUTH E TRYON STREET LINE ceoew DRAWING SHEET REV FILE NO. DATE REVISION DRAWN CHECKED APPROVED ,,,,""'",,,1- TELEPHONE NO.(704)382-2741 1D165 10395896 PTL