Loading...
HomeMy WebLinkAboutNCC242597_Site Plan or Location Map_20240827 UNCLASSIFIED 1 I 2 I 3 I 4 I 5 . \\\: _ , . 1 t `�. CROATAN , o\\ NATrnNALFOREST _ - - f 41 \'' If4. - J',� r � �`��\ FY2020 MOON P-658F FITNESS . ,„„,, R g a Pine Grove - ` �Y r (- � ,I — p ��� --f �• •�..�� .. UNNAMED TRIBUTARY TO 1? ' -.' SLOCUMCREEK L ^, ° ' CENTER AND COMBAT POOLL. , ,„ °� 1, p p t •r l D .. - • ' to - /�/Q,,r_.�_�/i i � � 11. 5 / ��y F Z co r p �- CHERRY POINT, NC °=w a �� �a -�� ,gip ��� Cherry fol. LL o ` 3 / a _ Stla[oAnlCunnin nam Fleme Corps Au lO `'+� PROJECT SITE 's -/ 4 o s !n a — �, r I A N:427278.90 Si HAVELOCK e „\ GENERAL NOTES: E.2628123.56 t ' - Bt +� +^s - '�,V " IF t' c 1. THE EROSION & SEDIMENT CONTROL (E&S) PLANS CONTAINED HERE-IN ARE PART OF A LARGER COMPREHENSIVE ,S" w fi`1� = ' •/ ��, O '� STORMWATER POLLUTION PREVENTION PLAN (SWPPP). CONTRACTORS/SUBCONTRACTORS/PERSONS THAT ENGAGED IN LAND — 5)�, i]� `‘oki. 1_.1= % `- �c,', DISTURBING ACTIVITIES MUST BECOME FAMILIAR WITH AND COMPLY WITH EROSION AND SEDIMENT CONTROL AND • STORMWATER POLLUTION PREVENTION REQUIREMENTS CONTAINED THROUGHOUT THE SWPPP, DRAWINGS, SPECIFICATIONS AND 1 — oo �� ,�� r� b PERMITS. \,, - ''''% 11 \ - -,�-� .� ♦ ¢ _� 2. TOPOGRAPHIC AND BOUNDARY INFORMATION BY PRECISION MEASUREMENTS, INC. NOT VERIFIED BY ADC ENGINEERING, INC. NAIFAC .,„.7_ - + ,, 3. COORDINATES ARE BASED ON NC STATE PLANE COORDINATES NAD '83 (2011). VERTICAL DATUM IS BASED ON HORIZONTAL }( ..: ..� r;.__ - E ``. ,p- pf 4. PROJECT STAKEOUT, NCLUDIINGCRELOCATION OFPROJECT BENCHMARKS AS NECESSARY, MUST BE PERFORMED BY A L - S' ARoe'',,,, o C Y F ,C / REGISTERED LAND SURVEYORLICENSED IN NORTH CAROUNA. FOR STAKEOUT, DO NOT RELY SOLELY ON THE PHYSICA • j - - - — ��r'_ \ ''\¢]\ J; 1 --.. ��'., ° t SCALE AS SHOWN IN DRAWINGS. REFER TO THE GIVEN DIMENSIONS, SYMBOL LEGEND, KEYNOTES, AND REFERENCED 0// 9"; n o• .i. ,'' `t �� - \ DETAILS FOR CORRECT STAKEOUT. SEAL 47 . = o ./ �/ L 2233 Y E �, Q 9 ��5 \ _ ',/� 8,428 FEET TO MAIN GATE \�� I. 5. THE EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON AVAILABLE INFORMATION. BE RESPONSIBLE FOR 31. I�7J I� O: C ® d ' � _ _--- w 9N a DETERMINING THE LOCATION OF ALL UTILITIES PRIOR TO BEGINNING ANY WORK. IF UTILITIES OTHER THAN THOSE SHOWN %Pis, yittl el C - I / " , ( ' - o HEREON ARE ENCOUNTERED, THE CONTRACTOR MUST NOTIFY THE CONTRACTING OFFICER AND TAKE APPROPRIATE • °'T�PHER�.�`'��� y r a �_� �./ / MEASURES TO PROTECT THE UNE(S) AND ENSURE CONTINUED SERVICE. THE CONTRACTOR MUST VERIFY THE CONNECTION 3 - o a , \_ - �'� _ POINTS OF NEW UTIUTIES TO EXISTING UTIUTIES PRIOR TO BEGINNING CONSTRUC11ON. "" i. - U" `:yo _ - Havelock \°,"� _ . � Ft °. 6. PROVIDE TREE PROTECTION BARRICADES PRIOR TO BEGINNING EARTHWORK OPERATIONS. w���`1 r \\ Station _ F)1 p h.2�° -- __;p�� 'pH..BtvG ____ __ 7. PROVIDE AND PLACE 4" OF TOPSOIL IN ALL DISTURBED AREAS NOT TO BE PAVED. PROVIDE TEMPORARY AND PERMANENT 1 ,,,t,,v"P4' ! - - SEEDING IN ALL AREAS INSIDE OR OUTSIDE THE LIMITS OF CONSTRUCTION THAT ARE DISTURBED BY THE CONTRACTOR'S �� %.. - �-. ,� - c OPERATIONS. re, n Ba,<"B,vn Bm QUAD MAP CHARLOTTE..28202 TE`Ia 8. GRADE ALL AREAS TO DRAIN FOR POSITIVE FLOW PRIOR TO FINAL APPROVAL. svF.BnxsHu,Bwo 0 SCALE: 1"-2,000' DOC .�.6scn„' LLl 9. THE DESIGN ADEQUACY AND SAFETY OF ALL BRACING, SHORING AND TEMPORARY SUPPORTS, ETC. IS THE SOLE ucac+BBaawca Li- RESPONSIBILITY OF THE CONTRACTOR. ENGINEERING mBmEctt"aw� 10. THE GENERAL CONTRACTOR MUST REVIEW AND STAMP APPROVED ANY AND ALL SHOP DRAWINGS AND SUBMITTALS PRIOR APPROVEDcn TO SUBMITTING TO THE ENGINEER FOR REVIEW. ,. U 11. PERFORM WATER AND SEWER WORK IN ACCORDANCE WITH NCDEQ REGULATIONS. WHERE ANY DISCREPANCIES EXIST Z C.P. � t;,.. BETWEEN THESE DOCUMENTS AND NCDEQ REGULATIONS REQUIREMENTS, ADHERE TO NCDEQ REGULATIONS. COMMANDER Wawa M •a J, MCAS CHERRY POINT ,, \ , _ 12. IN PERFORMING CONSTRUCTION OBSERVATION VISITS TO THE JOB SITE, THE ENGINEER HAS NO CONTROL OVER NOR i¢ !A`` 1 `, I -v ` _ WORK.RESPONSIBILITY FOR THE CONTRACTOR'S MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES IN PERFORMING THE SATISFACTORY TO DATE 01/11/2024 . Sioe�rlm•Rd jai - ,f.. .t811 I.I- EEs CBC IGaw LAH cHK CBC ( ^ _ c ''�"" • '- I 13. THE CONTRACTOR'S MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES IN PERFORMING THE WORK IS SOLELY THE NON KTB/LEJ • - ` r+fl BRANCH MANAGER CGM J RESPONSIBILITY OF THE CONTRACTOR, WHO IS ALSO RESPONSIBLE FOR COMPLYING WITH HEALTH AND SAFETY PRECAUTIONS v ,' +v �' / ,I - AS REQUIRED BY ANY REGULATORY AGENCY. w""wow. EJA t. cvE:, DSN /. {` w & i• �-4 'S 14. CONTRACTOR IS RESPONSIBLE FOR DESIGN, ADEQUACY AND IMPLEMENTATION OF DEWATERING. DEWATERING ACTIVITIES c.� B cljZ MUST BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE STORMWATER POLLUTION PREVENTION PLAN. o a ? B 3� i,��' ��:b!j L. 3y: i , ` ._a• [. . .,jq'Z` • j, o o z 4/ !r' i 15. CONTRACTOR MUST MAINTAIN SIGHT DISTANCE VISIBILITY AT EXITS AND/OR INTERSECTIONS, DURING AND AFTER o cc 5 �,``' r,.... ,' CONSTRUCTION. w a 'E PROJECT SITE 'f o i- 4 N:427278.90 1, - 16. TRAFFIC CONTROL SIGNS AND PAVEMENT MARKINGS MUST BE IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC w z ° • E:2628123.56 '; /. CONTROL DEVICES FOR STREETS AND HIGHWAYS (MUTCD), CURRENT EDITION. g I- co 0 J LL o 0 Z — • �c zU CW7 J A �> � a .... 65CD Z co Lu W HAUL ROUTE z � w o0 r` ROICC & DEPARTMENT - w OF PUBLIC WORKS 11 F L� 1- c'—i 1005 MICHAEL ST 6^, /,, n' _ z111k ¢ z ✓ • v�it l w LL d AY B �Sl °z u, w A 0 - ;. �. - w = • n• 8 �• i , g c1 a o vab ; MAIN GATE n AS NOTED -- + ,7 Er„cJ cr NO 11692230 ! k d !s! rior I. -.P - -r N. „ co„s,„.COMO NO N400851800601 t \ DRAWING12896247 LOCATION MAP s„EE, 31 of 565 SCALE: 1"=2,000' C001 1 1 2 I 3 I 4 I 5 wFna„awn.,,au.T2.° UNCLASSIFIED