HomeMy WebLinkAboutNCC242597_Site Plan or Location Map_20240827 UNCLASSIFIED
1 I 2 I 3 I 4 I 5
. \\\: _ , . 1
t `�. CROATAN , o\\ NATrnNALFOREST _ - - f 41 \'' If4. - J',� r � �`��\ FY2020 MOON P-658F FITNESS
. ,„„,, R g a
Pine Grove - ` �Y r
(- � ,I —
p ��� --f �• •�..��
.. UNNAMED TRIBUTARY TO 1? '
-.' SLOCUMCREEK L ^, ° ' CENTER AND COMBAT POOLL.
, ,„
°� 1, p p t •r l
D .. - • ' to - /�/Q,,r_.�_�/i i � � 11. 5 /
��y F Z
co r
p �- CHERRY POINT, NC °=w
a �� �a -�� ,gip ��� Cherry fol. LL o
` 3 / a _ Stla[oAnlCunnin nam Fleme Corps Au lO `'+�
PROJECT SITE 's -/ 4 o s !n
a — �, r I A N:427278.90 Si HAVELOCK e „\ GENERAL NOTES:
E.2628123.56 t
' - Bt +� +^s - '�,V " IF t' c 1. THE EROSION & SEDIMENT CONTROL (E&S) PLANS CONTAINED HERE-IN ARE PART OF A LARGER COMPREHENSIVE
,S" w fi`1� = ' •/ ��, O '� STORMWATER POLLUTION PREVENTION PLAN (SWPPP). CONTRACTORS/SUBCONTRACTORS/PERSONS THAT ENGAGED IN LAND —
5)�, i]� `‘oki. 1_.1= % `- �c,', DISTURBING ACTIVITIES MUST BECOME FAMILIAR WITH AND COMPLY WITH EROSION AND SEDIMENT CONTROL AND
• STORMWATER POLLUTION PREVENTION REQUIREMENTS CONTAINED THROUGHOUT THE SWPPP, DRAWINGS, SPECIFICATIONS AND
1 — oo �� ,�� r� b PERMITS.
\,, - ''''%
11 \ - -,�-� .� ♦ ¢ _� 2. TOPOGRAPHIC AND BOUNDARY INFORMATION BY PRECISION MEASUREMENTS, INC. NOT VERIFIED BY ADC ENGINEERING, INC. NAIFAC
.,„.7_ - + ,, 3. COORDINATES ARE BASED ON NC STATE PLANE COORDINATES NAD '83 (2011). VERTICAL DATUM IS BASED ON
HORIZONTAL
}( ..: ..� r;.__ - E ``. ,p- pf 4. PROJECT STAKEOUT, NCLUDIINGCRELOCATION OFPROJECT BENCHMARKS AS NECESSARY, MUST BE PERFORMED BY A L - S' ARoe'',,,,
o C Y F ,C
/ REGISTERED LAND SURVEYORLICENSED IN NORTH CAROUNA. FOR STAKEOUT, DO NOT RELY SOLELY ON THE PHYSICA •
j - - - — ��r'_ \ ''\¢]\ J; 1 --.. ��'., ° t
SCALE AS SHOWN IN DRAWINGS. REFER TO THE GIVEN DIMENSIONS, SYMBOL LEGEND, KEYNOTES, AND REFERENCED 0// 9";
n
o• .i. ,'' `t �� - \ DETAILS FOR CORRECT STAKEOUT. SEAL
47 . = o ./ �/ L 2233 Y E
�, Q 9 ��5 \ _ ',/� 8,428 FEET TO MAIN GATE \�� I.
5. THE EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON AVAILABLE INFORMATION. BE RESPONSIBLE FOR 31. I�7J I� O:
C ® d ' � _ _--- w 9N a DETERMINING THE LOCATION OF ALL UTILITIES PRIOR TO BEGINNING ANY WORK. IF UTILITIES OTHER THAN THOSE SHOWN %Pis, yittl el C
- I / " , ( ' - o HEREON ARE ENCOUNTERED, THE CONTRACTOR MUST NOTIFY THE CONTRACTING OFFICER AND TAKE APPROPRIATE •
°'T�PHER�.�`'��� y
r a �_� �./ / MEASURES TO PROTECT THE UNE(S) AND ENSURE CONTINUED SERVICE. THE CONTRACTOR MUST VERIFY THE CONNECTION
3 - o a , \_ - �'� _ POINTS OF NEW UTIUTIES TO EXISTING UTIUTIES PRIOR TO BEGINNING CONSTRUC11ON. ""
i. -
U" `:yo _ - Havelock \°,"� _ . � Ft °. 6. PROVIDE TREE PROTECTION BARRICADES PRIOR TO BEGINNING EARTHWORK OPERATIONS.
w���`1 r \\ Station _ F)1
p h.2�° -- __;p�� 'pH..BtvG ____ __ 7. PROVIDE AND PLACE 4" OF TOPSOIL IN ALL DISTURBED AREAS NOT TO BE PAVED. PROVIDE TEMPORARY AND PERMANENT
1 ,,,t,,v"P4' ! - - SEEDING IN ALL AREAS INSIDE OR OUTSIDE THE LIMITS OF CONSTRUCTION THAT ARE DISTURBED BY THE CONTRACTOR'S
�� %.. - �-. ,� - c OPERATIONS. re,
n Ba,<"B,vn Bm
QUAD MAP CHARLOTTE..28202
TE`Ia
8. GRADE ALL AREAS TO DRAIN FOR POSITIVE FLOW PRIOR TO FINAL APPROVAL. svF.BnxsHu,Bwo 0
SCALE: 1"-2,000' DOC .�.6scn„' LLl
9. THE DESIGN ADEQUACY AND SAFETY OF ALL BRACING, SHORING AND TEMPORARY SUPPORTS, ETC. IS THE SOLE ucac+BBaawca Li-
RESPONSIBILITY OF THE CONTRACTOR. ENGINEERING mBmEctt"aw�
10. THE GENERAL CONTRACTOR MUST REVIEW AND STAMP APPROVED ANY AND ALL SHOP DRAWINGS AND SUBMITTALS PRIOR APPROVEDcn
TO SUBMITTING TO THE ENGINEER FOR REVIEW.
,. U
11. PERFORM WATER AND SEWER WORK IN ACCORDANCE WITH NCDEQ REGULATIONS. WHERE ANY DISCREPANCIES EXIST Z
C.P. � t;,.. BETWEEN THESE DOCUMENTS AND NCDEQ REGULATIONS REQUIREMENTS, ADHERE TO NCDEQ REGULATIONS. COMMANDER Wawa M
•a J, MCAS CHERRY POINT
,, \ , _ 12. IN PERFORMING CONSTRUCTION OBSERVATION VISITS TO THE JOB SITE, THE ENGINEER HAS NO CONTROL OVER NOR
i¢ !A`` 1 `, I -v ` _ WORK.RESPONSIBILITY FOR THE CONTRACTOR'S MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES IN PERFORMING THE SATISFACTORY TO DATE 01/11/2024
. Sioe�rlm•Rd jai - ,f.. .t811 I.I- EEs CBC IGaw LAH cHK CBC
( ^ _ c ''�"" • '- I 13. THE CONTRACTOR'S MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES IN PERFORMING THE WORK IS SOLELY THE NON KTB/LEJ
• - ` r+fl BRANCH MANAGER CGM
J RESPONSIBILITY OF THE CONTRACTOR, WHO IS ALSO RESPONSIBLE FOR COMPLYING WITH HEALTH AND SAFETY PRECAUTIONS
v ,' +v �' / ,I - AS REQUIRED BY ANY REGULATORY AGENCY. w""wow. EJA
t. cvE:, DSN
/. {` w
& i• �-4 'S 14. CONTRACTOR IS RESPONSIBLE FOR DESIGN, ADEQUACY AND IMPLEMENTATION OF DEWATERING. DEWATERING ACTIVITIES c.�
B cljZ MUST BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE STORMWATER POLLUTION PREVENTION PLAN. o a ? B
3� i,��' ��:b!j L. 3y: i , ` ._a• [. . .,jq'Z` • j, o o z
4/ !r' i 15. CONTRACTOR MUST MAINTAIN SIGHT DISTANCE VISIBILITY AT EXITS AND/OR INTERSECTIONS, DURING AND AFTER o cc 5
�,``' r,.... ,' CONSTRUCTION. w a
'E PROJECT SITE 'f o i-
4 N:427278.90 1, - 16. TRAFFIC CONTROL SIGNS AND PAVEMENT MARKINGS MUST BE IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC w z °
• E:2628123.56 '; /. CONTROL DEVICES FOR STREETS AND HIGHWAYS (MUTCD), CURRENT EDITION. g I- co 0
J LL o 0 Z —
• �c zU CW7
J A �> � a
.... 65CD Z co
Lu
W
HAUL ROUTE z � w o0
r` ROICC & DEPARTMENT - w
OF PUBLIC WORKS 11 F L� 1- c'—i
1005 MICHAEL ST
6^, /,, n' _ z111k ¢ z
✓ •
v�it l w LL d
AY B �Sl °z u, w A
0
- ;. �. - w =
•
n• 8
�• i , g c1
a o
vab ; MAIN GATE n AS NOTED
-- + ,7 Er„cJ cr NO 11692230
! k d !s! rior I.
-.P - -r N. „ co„s,„.COMO NO
N400851800601
t \
DRAWING12896247
LOCATION MAP s„EE, 31 of 565
SCALE: 1"=2,000'
C001
1 1 2 I 3 I 4 I 5 wFna„awn.,,au.T2.°
UNCLASSIFIED