Loading...
HomeMy WebLinkAbout20040766 Ver 3_More Info Letter_20080107~OF WATF9P Michael F. Easley, Governor ,~(~ (i William G. Ross Jr., Secretary fp ~ North Carolina Department of Environment and Natural Resources ~ ~ O .~ Coleen H. Sullins, Director Division of Water Quality January 7, 200, DWQ Project # 04-0766, Ver. 3 Johnston County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Mr. James M. Gilbert 273-C Blue Pond Road Clayton, NC 27520 Subject Property: Timberlake Subdivision -Phase IV Sandy Branch (Ut to Neuse River) [030402, 27-(38.5), WSN, NSW]. REQUEST FOR MORE INFORMATION Dear Mr. Gilbert: On July January 2, 2007, the Division of Water Quality (DWQ) received your application dated December 31, 2007, to fill or otherwise impact 4,998 square feet of Zone 1 Neuse River basin protected riparian buffer and 3,600 square feet of Zone 2 Neuse River basin protected riparian buffer to construct the proposed residential development impact to construct the proposed residential development. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: Your submitted geotechnical investigation report for the proposed bottomless culverts indicates partially weathered rock was encountered at deeper than 3-5 feet in the borings. Approval of your proposed bottomless culvert must include submittal of a signed and sealed (by a Professional Engineer or Professional Geologist) geotechnical investigation of subsurface soils which directly complies with the DIVISION OFHIGHWAYS -GUIDELINES FOR DRAINAGE STUDIES AND HYDRAULIC DESIGN, PREPARED BYA. L. HANKINS, JR., P.E.STATE HYDRAULICS ENGINEER -1999 (http://www.ncdot.or~,/doh/PRECONSTRUCT/HIGH WAY/hydro/~10399web/pdf/~~uidelines.pdf ), which states, "When a shallow (3-5 foot max. depth) non-erosive rock foundation is found throu>?hout the proposed site, the structure can be built on footings without a bottom allowing retention of the natural channel bed." The Geotechnical Unit must confirm the foundation acceptability prior to final selection of the "bottomless" culvert." The non-erosive rock foundation is necessary to minimize stream disturbance during construction, and to prevent scour and differential settlement. The culverts must safely provide conveyance of the design storm event, must be economical to construct and maintain, and should maintain low flow channel and promote retention of bed material. There must be a minimum of 50 feet between borings and 50 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 /Internet: httn://h2o.enr.state.nc.us/ncwetlands None hCarolina ~atura!!y An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Mr. James M. Gilbert Page 2 of 2 January 7, 2007 blows in less than 6" penetration per ASTM. Based on your submitted geotechnical investigation report, bottomless culverts cannot be approved at your proposed locations. Please submit this information within 30 calendar days of the date of this letter. If we do not receive this requested information within 30 calendar days of the date of this letter, your project will be withdrawn and you will need to reapply with a new application and a new fee. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733- 1786 if you have any questions regarding or would like to set up a meeting to disc ~~, this matter. 6~ CBKlijm Sincerely, P' ~l //~ U "Cyndi Karoly, upervisor 401 Oversight/Express Review Permitting Unit cc: Lauren Witherspoon, DWQ Raleigh Regional Office DLR, Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files Neal Floyd, Trueline Soils, 205 W. Main Street, Clayton, NC 27520 Filename: 040766Ver3TimberlakeSDPhaseN(Johnston)On_Hold