Loading...
HomeMy WebLinkAbout770013_Sludge Survey (Reporting)_20240422 RECEIVED APR 2 2 2024 ATTN: NC DEO/DWR DENR REPRESENTATIVE Central Office ANIMAL FEEDING OPERATIONS UNIT 1636 MAIL SERVICE CENTER RALEIGH,N.C. 27699-163 6 FROM: DAVID W. SULLIVAN 342 LINWOOD LANE ROCKINGHAM,N.C. 28379 PERMIT NUMBER AWS770013 ATTACHED IS A COPY OF MY MOST RECENT SLUDGE SURVEY. THIS SURVEY SHOWS I CURRENTLY HAVE 4.9 FEET OF PERMANENT LIQUID TREATMENT STORAGE IN MY ANIMAL WASTE LAGOON,WHICH IS MORE THAN THE REQUIRED FOUR FEET. BASED ON THESE FINDINGS I REQUEST TO BE EXEMPT FROM FURTHER SLUGDE SURVEYS FOR THE LIFE OF MY CURRENT PERMIT, OR THE NUMBER OF YEARS YOU AND YOUR OFFICE DEEM ADEQUATE. I LOST MY CONTRACT WITH PURVIS FARMS WHEN THEY WENT BANKRUPT. I HAVE NO HOGS ON THE PROPERTY AT THIS TIME OR PLAN TO RE- STOCK IN THE NEAR FUTURE. WE ARE IN THE PROCESS OF TRYING TO MAKE A DECISION ON HOGS IN THE FUTURE OR NOT. THANKS FOR YOUR CONSIDERATION OF THIS REQUEST. '�D DATE: -/Sz Sheetl I Sheet2 Appendix 1.Lagoon Sludge Survey Form Revised August 2008 A.Farm Permit or DWQ Identification Number David Sullivan B.Lagoon Identification Lagoon 1 C.Person(s)Taking Measurements Anthony Growe D.Date of Measurement 4/4/24 E.Methods/Devices Used for Measurement of: a.Distance from the lagoon liquid surface to the top of the sludge layer. Secchi Disk b.Distance from the lagoon liquid surface to the bottom(soil)of the lagoon. Homemade Sludge Judge c.Thickness of the sludge layer if making a direct measurement with"core sampler". NA F.Lagoon Surface Area(using dimensions at inside top of bank): <1(.5) (acres) (Draw a sketch of the lagoon on a separate sheet,list dimensions,and calculate surface area.The lagoon may have been built different than designed,so measurements should be made.) G.Estimate number of sampling points; a.Less than 1.33 acres:Use 8 points b.If more than 1.33 ac. _ acres x 6= 8 ,with maximum of 24. (Using sketch and dimensions,develop a uniform grid that has the same number of intersections as the estimated number of sampling points needed.Number the intersection points on the lagoon grid so that data recorded at each can be easily matched.) H.Conduct sludge survey and record data on"Sludge Survey Data Sheet'(Appendix 2).Also,at the location of the pump intake,take measurements of distance from liquid surface to top of sludge layer and record it on the Data Sheet(last row);this must be at least 2.6 ft.when irrigating. I.At the time of the survey,also measure the distance from the Maximum Liquid Level to the Present Liquid Level(measure at the lagoon gauge pole): 34-25=9/12=0.75 0.8 J.Determine the distance from the top of bank to the Maximum Liquid Level 2.1 (use lagoon management plan or other lagoon records) 25/12=2.08 K.Determine the distance from the Maximum Liquid to the Minimum Liquid level: 2.0 (use lagoon management plan or other lagoon records) L.Calculate the distance from the present liquid surface level to the Minimum Liquid Level 1.3 (Item K Minus Item 1,assuming the present liquid level is below the Maximum Liquid Level) M.Record from the Sludge Survey Data Sheet the distance from the present liquid surface level to the lagoon bottom(average for all the measurement points) 9.8 N.Record from the Sludge Survey Data Sheet the distance from the present liquid surface level to the top of the sludge layer(average for all the measurement points): 6.2 O.Record from the Sludge Survey Data Sheet the average thickness of the sludge layer: 3.6 P.Calculate the thickness of the existing Liquid Treatment Zone(Item N minus Item L): 49 Q.If Item O is greater than Item P,proceed to the Worksheet for Sludge Volume and Treatment Volume. If Item O is equal to or less than Item P,you do not have to determine volumes. Completed by: Anthony Growe Date: 4/4/24 Print Name/Signature Appendix 2. Sludge Survey Data Sheet' Revised August 2008 Lagoon Identification Lagoon 1 Completed by: A.Growe 4/4124 Print Name Signature (A) (B) (C) (C)-(B) Grid Point Distance from liquid surface Distance from liquid surface Thickness of sludge layer Mn I to fnn of h.eino I to lannnn hnft—1—M Ft. &in. Ft.(tenths) Ft. &in. Ft.(tenths) Ft. &in. Ft.(tenths) 1 7.5 11.5 4.0 2 10.0 13.0 3.0 3 10.5 12.5 2.0 4 6.0 11.0 5.0 5 3.5 7.0 3.5 6 3.5 7.5 4.0 7 4.0 7.0 3.0 8 4.5 9.0 4.5 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Number of points with readings 8.0 X X 8.0 X X 8.0 Average of X X 6.1875 X X 9.8125 X X 3.625 points At pump 0.0 X X X X X X intake 'All Grid Points and corresponding sludge layer thicknesses must be shown on a sketch attached to this Sludge Survey Data Sheet. Appendix 3.Worksheet for sludge volume and treatment volume Revised August 2008 The average thickness of the sludge layer and the thickness of the existing liquid(sludge-free)treatment zone are determined from the information on the Lagoon Sludge Survey Form(Items O and P,respectively).In this example,the average sludge layer thickness is 2.5 feet and the existing liquid treatment zone is 3.5 feet.If the lagoon has a designed sludge storage volume, see notes at end of the worksheet.The dimensions of the lagoon as measured and the side slope are needed for calculations of sludge volume and of total treatment volume.If the lagoon is a standard geometric shape,the sludge volume and the treatment volume in the lagoon can be estimated by using standard equations.For approximate volumes of rectangular lagoons with constant side slope,calculate length and width at the midpoint of the layer,and multiply by layer thickness to calculate layer volume,as shown in the example.For irregular shapes,convert the total surface area to a square or rectangular shape.For exact volumes for lagoons with constant side slope,the"Prismoidal Equations"may be used. Example Your Lagoon 1.Average sludge Layer Thickness(T) 2.5 ft. 3.6 ft. 2.Depth of the lagoon from top of bank to bottom soil surface(D) 11 it. 12.7 ft. 3.Slope=Horizontal/vertical side slope(S) 3 2.5 4.Length at the top of inside bank(L) 457 ft. 259.0 ft. 5.Width at top inside slope(W) 229 ft. 90.0 ft.