Loading...
HomeMy WebLinkAboutNCS000413_MS4 Annual Report (2024-25 FY)_20240826 City Of Kannapolis Annual Report Summery August 2024 Michael Dodge—Stormwater Operations Manager Permit Number: NCS000413 Table 11: Program Administration BMPs BMP#1 Maintain program Measurable Goal Annual Reporting Metric Funding 1.Include analysis within Adequate the annual Self-Assessment submitted in the first permit year(see BMP#2), BMP#2 Annual Self- Measurable Goal Annual Reporting Metric Assessment 1.Prepare, certify and Complete submit the Annual Self- Assessment to NCDEQ prior to August 31 each year. BMP#3 Permit Renewal Measurable Goal Annual Reporting Metric Application 1.Participate in an NPDES N/A MS$ Permit Compliance Audit, as scheduled and performed by EPA or NCDEQ, BMP#4 Permit Renewal Measurable Goal Annual Reporting Metric Application 1.Develop written Yes procedures for implementing the MCMs, 2.Review all written Yes procedures and update them as needed, Table 13: Public Education and Outreach BMP#5 Goals and Measurable Goal Annual Reporting Metric Objectives 1.Document goals and Yes objectives in the Public Education and Outreach Procedures document, 2.Reassess and revise, as November 2023 necessary, Public Education and Outreach Procedures document to determine if any goals have changed, BMP#6 Goals and Measurable Goal Annual Reporting Metric Objectives 1.Reassess and revise, as None necessary, Table 13 of SWMP to determine if any items need to be updated, BMP#7 Describe Target Measurable Goal Annual Reporting Metric Audiences 1.Reassess and revise, as None necessary, Table 13 of SWMP to determine if any items need to be updated, BMP#8 Describe Measurable Goal Annual Reporting Metric Residential and Industrial/Commercial Issues 1.Reassess to determine if None any items need to be updated, BMP#9 City Website Measurable Goal Annual Reporting Metric 1.Post the City's Yes Stormwater Management Program, 2.Promote website on Yes outreach material, 3.Track the annual number 399,631 of visits to the site, Table 13: Public Education and Outreach - Continued BMP#10 Public Material Measurable Goal Annual Reporting Metric Distribution 1.Develop material or utilize Yes public outreach material developed by the state/or other entities through a cooperative agreement, 2.Distribute public outreach 3 materials and conduct outreach events, 3.Continue Public 70 Education social media accounts, BMP#11 Hotline/Helpline Measurable Goal Annual Reporting Metric 1.Check phone number Yes annually, 2. Train hotline staff on 9 transferring calls. 3.Track the annual number 448 of calls to the hotline. 4.Promote hotline Yes information on outreach material, 5.Clarify hotline information Yes, with changes being for outreach material on made to use"stop Mud" website, verbiage. Table 14: Public Involvement and Participation BMPs BMP#12 Ongoing public Measurable Goal Annual Reporting Metric Involvement Activities Conduct an environmental No Stewardship Committee meeting where a portion of the meeting is dedicated to addressing public concerns regarding Stormwater issues, BMP#13 Volunteer Measurable Goal Annual Reporting Metric Community Involvement Program Publicize, promote and No implement two public involvement events per year (litter cleanup/stream cleanup, storm drain marking activities, etc.) Table 16: Illicit Discharge Detection and Elimination BMPs BMP#14 MS4 Mapping Measurable Goal Annual Reporting Metric 1.Have entire system 88% of system is mapped mapped by end of permit cycle, BMP# 15 Legal Authorities Measurable Goal Annual Reporting Metric 1.Reviewthe ordinance and Yes make changes as necessary, BMP#16 Dry Weather Measurable Goal Annual Reporting Metric Survey 1.Screen 20% of outfalls, 100% 2.Record number of illicit 0 discharges detected, 3.Record number of 0 notifications issues, 4.Record number of 0 connections eliminated, BMP#17 IDDE Program Measurable Goal Annual Reporting Metric Evaluation 1.Hold annual Evaluation November 2023 meeting to discuss IDDE program and procedures, Table 16: Illicit Discharge Detection and Elimination BMPs - Continued BMP#18 Documentation of Measurable Goal Annual Reporting Metric Illicit Discharges 1.Track Investigations, 4 2.Update IDDE Program No Procedures Manual to include provisions for identifying chronic violators and what actions will be taken to reduce noncompliance, 3.Identify chronic violators 0 and initiate actions to reduce noncompliance, BMP#19 Employee Training Measurable Goal Annual Reporting Metric 1.Train all appropriate 29 employees, BMP#20 IDDE Public Measurable Goal Annual Reporting Metric Education 1.Distribute materials to 28,312 on Facebook, 8125 appropriate audience, Instagram, 5196 on Twitter BMP#21 Public Reporting Measurable Goal Annual Reporting Metric Mechanism 1.Promote reporting Yes mechanism to public through website and outreach MATERIALS, 2.Train staff on illicit 3/1/2024 29 people trained discharge reporting mechanisms, 3.Create standard Yes procedures for implementing citizen complaints, 4.Respond to complaints 4 5.Ensure problems have 4 been corrected by the responsible party, Table 17: Construction Site Runoff Control BMPs BMP#22 Construction Site Measurable Goal Annual Reporting Metric runoff Control 1.Rely on NCDEMLR and N/A maintain communication if necessary, BMP#23 Public Input Measurable Goal Annual Reporting Metric 1.Add the information on Added August 2024 to the NCDEQ Division of website, other materials to Energy, Mineral and Land follow. resources"Stop Mud" hotline to City advertisements and the City website. Continue to notify the public of the City's Hotline to notify the City of observed problems. BMP#24 Staff Response Measurable Goal Annual Reporting Metric 1.Train municipal staff on 6 the proper handling of construction site runoff control complaints. Table 20: Post Construction Site Runoff Control BMPs BMP#25 Standard Measurable Goal Annual Reporting Metric Reporting 1.Track number of low Low Density-20 density and high-density High Density-23 plan reviews performed. 2.Track number of low Low Density-13 density and high-density High Density- 8 plans approved. 3.Maintain a current 11 Total Added this year: inventory of low-density 6 Sand Filters projects and constructed 5 Wet Ponds SCMs including SCM type or low-density acreage, location and last inspection date. 4.Track number of SCM 96 inspections performed. 5.Track number of low- 13 density inspections performed. 6.Track number and type of 0 enforcement actions taken. Table 21: Pollution Prevention and Good housekeeping BMPs Bmp#30 Maintain a Measurable Goal Annual Reporting Metric Maintenance Program for Municipal facilities 1.Develop O&M Plan for Yes each City Facility identified in BMP#29. 2.Review and maintain Yes O&M Plans and evaluate. 3.Inspect municipal owned 1 annually each October and operated facilities with the potential for generating polluted stormwater runoff. BMP#31 Inventory of Measurable Goal Annual Reporting Metric Municipally owned and operated facilities 1.Maintain an inventory of 3 municipal facilities. Bmp#32 Staff training Measurable Goal Annual Reporting Metric 1.Train all employees. BMP#33 Spill Response Measurable Goal Annual Reporting Metric Procedures 1.Develop Spill response Yes procedures. 2.Review and update spill Yes response procedures document as needed. BMP#34 Number of staff Measurable Goal Annual Reporting Metric trained 1.Develop or identify Yes appropriate training program. 2.Provide initial training for Begins year 3 all employees. 3.Provide training for new Begins year 3 as needed hires. Table 21: Pollution Prevention and Good housekeeping BMPs - Continued Bmp#35 MS4 System Measurable Goal Annual Reporting Metric Inspections and Maintenance 1.Develop an SOP that In Process includes proactive inspection schedules, standard documentation, staff responsibilities and proper maintenance training. 2.Perform regular In Process inspections in accordance with the SOP. 3.Verify, document and In Process prioritize maintenance activities by inspection or citizen complaint. 4.Develop inspection and Yes, City Works will be maintenance tracking used. system to be used in accordance with the SOP and to identify"hot spot" locations for system maintenance. BMP#36 Structural Control Measurable Goal Annual Reporting Metric Inventory 1.Maintain an inventory of 6 the appropriate structural controls. BMP#37 Measurable Goal Annual Reporting Metric 1.Inspect and maintain 20% 20% of the stormwater system. BMP#38 Measurable Goal Annual Reporting Metric 1.Develop written O&M plan Yes for stormwater sewer system program. Table 21: Pollution Prevention and Good housekeeping BMPs- Continued BMP#39 Evaluation of Measurable Goal Annual Reporting Metric Materials and Methods 1.Ensure that proper 13, all current as of 2024. training has been received and licenses are current. BMP#40 Vehicle and Measurable Goal Annual Reporting Metric Equipment Cleaning 1.Develop and implement Yes measures to minimize contamination of stormwater runoff. BMP#41 Stormwater Measurable Goal Annual Reporting Metric Collection System Maintenance 1.Perform a minimum of 6 SCM's are owned by one evaluation each year Kannapolis each evaluated which includes a summery once per year.. of effectiveness of the BMP based on Annual Reporting Metric the estimated quantity of pollutants removed. BMP#42 Street Sweeping Measurable Goal Annual Reporting Metric 1.Conduct street sweeping 882 tons per MS4 O&M SOP. BMP#43 Yard Waste Measurable Goal Annual Reporting Metric Collection 1.Continue to collect yard 3563 Tons of leaves trimmings and loose leaves. 4252 tons of limbs