Loading...
HomeMy WebLinkAboutNCG030611_DMR Upload Review_20240826 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 8/23/2024 2:51:38 PM (DMR Submittal) Submit by Brittany.Cook 8/26/2024 12:49:31 PM(DMR Submittal Review) • The task was assigned to DEMLR SW Admin for DMRs 8/23/2024 2:51:41 PM • Brittany.Cook assigned the task to Brittany.Cook 8/26/2024 12:46:04 PM DEQ - r'n.r-.. Monitoring ' - • • 1 • • . • DMR Submittal from 8/23/2024 Permit and Facility Information: .............................................................................................................................................. Permit Number* Enter COC or Individual Permit Number NCG030611 Must begin with NCS or NCG Facility Name:* Progress Rail Winston-Salem Owner/Operator Progress Rail Winston-Salem Name:* County:* Forsyth Note: Facility name and county are used to help the reviewer verify the permit number entered,and to display the Regional Office address on the submitter's form(not here).These metadata details will be pulled from current BIMS information after the DMR(s)are filed. If the submittal is accepted,simply note any errors in the reviewer's comments. Reason for not yet If applicable: reporting data Working to get all information corrected. through eDMR for this permit: Monitoring Period Information: .............................................................................................................................................................................................................................................................................................................................................................................................. Monitoring Period What is the YEAR of the sample date(s)? Year:* 2024 DMR Upload* Click the upload button or drag and drop files here to attach document. DMR 3rd Quarter 2024.pdf 415.75KB Only PDFs are accepted. Comments: * By checking the box and signing box below, I certify that: o I have given true,accurate,and complete information on this form; d I agree that submission of this Discharge Monitoring Report(DMR)Upload form is a"transaction"subject to Chapter 66, Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); d I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes (the"Uniform Electronic Transactions Act"); o I understand that an electronic signature on this upload form has the same legal effect and can be enforced in the same way as a written signature;AND o I intend to electronically sign and submit this DMR Upload form. Full Name:* Jessica Lamb Name of person submitting this form Email Address:* j.lamb@progressrail.com Phone Number:* 3367695943 Signature: OeAwo Date:* 08/23/2024 Review Review Date: 08/26/2024 Confirm Permit No.* Correct the permit ID number if needed. NCG030611 Confirm DMR Year* 2024 Multiple DMRs will be automatically filed in a subfolder denoting the sampling year entered above. Can submittal be Yes accepted?* No(Explain why below) Do Central Office No staff need to be Yes alerted?* Do Regional Office No staff need to be Yes alerted? Type of Permit* General Ensures DMR(s)filed correctly.