HomeMy WebLinkAbout820323_POA for high freeboard_20240808PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 82-323
Facility Name: Riverside Farm
Certified Operator Name- Dave Wells
County: Sampson
Operator Number: 20053
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
RS
N
18
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Codt Coombs Phone: 910-385-6000
Facility Owner/Manager (print)
Cody Coombs Date: 8/8/2024
Facility Owner/Manager (signature)
11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM
STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: RS
line m = 451.1 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line Ill =
lb PAN
6.
Structure ID:
line m =
lb PAN
n.lines 1+2+3+4+5+6= 451.1lbPAN
Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PFRInn nn NnT I IRT FIFI nR TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(Iblacre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
r
u. application window'
Pivot
HBG
1.92
127.59
245.0
311-9/30
FIELD A
HBG
1.73
264.00
456.7
3/1-9/30
FIELD B
HBG
0.97
213.00
206.6
311-9/30
F4
FESCUE
1.50
215.00
322.5
8/1-7/31
F5
FESCUE
1.30
215.00
279.5
811-7/31
F6
FESCUE
2.10
215.00
451.5
811-7/31
4&5
SOYBEANS
7.00
109.00
763.0
4/1-9/15
6
SOYBEANS
11.50
152.29
1751.3
4/1-9/15
7
SOYBEANS
18.05
79.00
1426.0
411-9115
v. I otal PAN available for all fielcls (sum of column t) _
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) _
x. Crop's remaining PAN balance (line v from section 111) _
y. Overall PAN balance (w - x) =
bWZ.1 Ib. PAN
451.1 lb. PAN
5902.1 lb. PAN
-5450.98579 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Called in to DWR on 815124. Will pump as weather and field conditions allow.
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): I Riverside Farm
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker F---78-0-1 inches
b. designed 25 yr./24 hr. storm & structural freeboard F-----l--9--Ol inches
c. line b - line a (inches in red zone) = 1.0 inches
top of dike surface area according to design
d. (area at below structural freeboard elevation) 64800 ft2
e. line c/12 x line d x 7.48 gallons/ft3 40392 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design —18--01 days
g. volume of waste produced according to structural design 176885 ft3
h. current herd # 2300 certified herd #1 2300
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
1. current waste analysis dated 1 6/4/2024
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
176885 ft3
ft3
27216 ft3
254446 gallons
1.53 Ibs/1000 gal.
451 lbs. PAN