HomeMy WebLinkAbout820323_POA for high freeboard_20240808PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82-323 Facility Name: Riverside Farm Certified Operator Name- Dave Wells County: Sampson Operator Number: 20053 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 RS N 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Codt Coombs Phone: 910-385-6000 Facility Owner/Manager (print) Cody Coombs Date: 8/8/2024 Facility Owner/Manager (signature) 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: RS line m = 451.1 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line Ill = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 451.1lbPAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PFRInn nn NnT I IRT FIFI nR TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (Iblacre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) r u. application window' Pivot HBG 1.92 127.59 245.0 311-9/30 FIELD A HBG 1.73 264.00 456.7 3/1-9/30 FIELD B HBG 0.97 213.00 206.6 311-9/30 F4 FESCUE 1.50 215.00 322.5 8/1-7/31 F5 FESCUE 1.30 215.00 279.5 811-7/31 F6 FESCUE 2.10 215.00 451.5 811-7/31 4&5 SOYBEANS 7.00 109.00 763.0 4/1-9/15 6 SOYBEANS 11.50 152.29 1751.3 4/1-9/15 7 SOYBEANS 18.05 79.00 1426.0 411-9115 v. I otal PAN available for all fielcls (sum of column t) _ IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) _ x. Crop's remaining PAN balance (line v from section 111) _ y. Overall PAN balance (w - x) = bWZ.1 Ib. PAN 451.1 lb. PAN 5902.1 lb. PAN -5450.98579 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Called in to DWR on 815124. Will pump as weather and field conditions allow. 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I Riverside Farm 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker F---78-0-1 inches b. designed 25 yr./24 hr. storm & structural freeboard F-----l--9--Ol inches c. line b - line a (inches in red zone) = 1.0 inches top of dike surface area according to design d. (area at below structural freeboard elevation) 64800 ft2 e. line c/12 x line d x 7.48 gallons/ft3 40392 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design —18--01 days g. volume of waste produced according to structural design 176885 ft3 h. current herd # 2300 certified herd #1 2300 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period 1. current waste analysis dated 1 6/4/2024 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 176885 ft3 ft3 27216 ft3 254446 gallons 1.53 Ibs/1000 gal. 451 lbs. PAN