HomeMy WebLinkAbout090058_POA for high freeboard_20240808AAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: County:�G�V1
Facility Name: -TO-Y k I l Yl
Certified Operator Name: rS.U� '2Y1
Operator #.
Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID):
Spillway (Yes or No):
Level (inches):
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
✓ Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
eI)'Iaq
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
Dro gM G-Doj6n
Facility Owner/Manager (print)
Facility Owner/Manager (signature)
Phone:
9i0- V c-3C4I
Date:
PoA Cover Page 2121100
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Tar Kiln
2. Structure ID:
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
n.lines 1+2+3+4+5+6=
line m = 14.4 lb PAN
line m = lb PAN
line m = lb PAN
line m = lb PAN
line m = lb PAN
line m =
lb PAN
14.4 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
--__ - -__ _._. __ __ -..... �.. ..... .........•'..� wnm an nrrourr_ Yurn in nAv DCDlnn
YtKIVU. UV
o, tract #
nV 1 LI01 rrCLUO
p. field #
I rrnrvn rru. v.+....v.
q. crop
.+
r. acres
•-•-�--•--•--
s. remaining IRR-2
PAN balance
(lblacre)
----- -- ----
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
- --
u. application window'
1819
6A
bermuda rass
1.92
100.00
192.0
3/1-9/30
1819
6B
bermuda rass
4.50
100.00
450.0
3/1-9/30
*** uestimates
on remainin
PAN balance**
'State current crop ending application date or next crop application beginning Date Tor available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) _
IV. FACILITY'S PDA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section 11) =
x. Crop's remaining PAN balance (line v from section III) _
y. Overall PAN balance (w - x) =
begin pumpingassoon asfield conditions permit.
642.0 lb. PAN
14.4 lb. PAN
642.0 lb. PAN
-628 lb. PAN
PoA (30 Day) 2/21 /00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
Tar Kiln
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e, line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
18.5 inches
19.0 inches
0.5 inches
20300 ft2
6327 gallons
180 days
19388 ft3
h. current herd # 2640 certified herd # 2640
actual waste produced = current herd # x line g = 19388 fts
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 12/7/23
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
j �jfe
12688 ft3
39988 gallons
0.31 Ibs/1000 gal.
14.4 Ibs. PAN
PoA (30 Day) 2/21/00