HomeMy WebLinkAbout090006_POA for high freeboard_20240808PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: - _ �Y _ County:
Facility Name: ,
�m��l�S
Certified Operator Name: L." i1�11� Mel
operator# 100g3&2
Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon NamelIdentifiier (ID): — l --- - -- -- - - -
Spillway (Yes or No):
Level (inches):
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
al 1019�
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
6 q. rrcn Melvin
Facility Owner/Manager (print)
Facility Owner/Manager (signature)
Phone:
c110-2710 - IWO
Date:°� L4
P0A Cover Page 2121100
II.- TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR/24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Sandhills Farm
2. Structure ID:
3. Structure ID:
4. Structure ID:
5. Structure ID:
- -- ---6.-Structure ID:
n.lines 1+2+3+4+5+6=
line m = 2088.9 lb PAN
line m = lb PAN
line m = lb PAN
u . Iq
line m = lb PAN
M
2088.9 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
nQ rn uru!ru eeu PAMUr%T QC ADDi irn IN IRIAI(: TNIC an nAV PFRIOD_
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR-2
PAN balance
ftfwre)
I. TOTAL
PAN
BALANCE
FOR FIELD
u. application
window'
T1127 F1
la
bermuda
4.67
126.00
583.8
Mar- Sept
T1127 F1
2a
bennuda
4.20
125,00
525.0
Mar - Se t
T1127 F1
5
bermuda
4.32
125.00
540.0
Mar - Se t
T1127 F1
6
bermuda
4.04
125.00
505.0
Mar - Se t
T1127 F3
11 b
bermuda
5.42
125.00
677.5
Mar- Sept
** did not usall ulls/fields
e
to meet PAN balance.
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 2831.3 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w.
Total PAN to be land applied (line n from section II) =
2088.9
lb. PAN
x.
Crop's remaining PAN balance (line v from section 111) =
2831.3
lb. PAN
y.
Overall PAN balance (w -x) =
-742
lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump an(
haul, depopulation, herd reduction, etc. Forpump & haul and herd reduction options, recalculatenew PAN
based on new information. If newfields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculatethe overall PAN balance. If animalwaste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels atthl
receiving facility.
NARRATIVE,
Will pump as soon as conditions allow.
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PANTO BE LANIDAPPLIED PER WASTE STRUCTURE _.
1. Structure Name/ldentffier (ID):
Sandhills Farm
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 76.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 3.0 inches
d. top of dike surface area according to design
ctu
e. line c/12 x line d x 7.48 gallons/ft3 387045 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 29D117 ft3
h. current herd # 8800 certified herd # 8800
actual waste produced = current herd # x line g = 290117 ft3
certified herd #
i. volume of wash water according to structural design ft3
j. excess rainfall over evaporation according to design 124775 ft3
k. (lines h + i + j) x 7.48 x 30 days/line f= 517232 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/26/24
m. ((lines e + k)11000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
2.31 Ibs/1000 gal.
2088.9 Ibs. PAN
PoA (30 Day) 2/21 /00