Loading...
HomeMy WebLinkAbout090006_POA for high freeboard_20240808PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: - _ �Y _ County: Facility Name: , �m��l�S Certified Operator Name: L." i1�11� Mel operator# 100g3&2 Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon NamelIdentifiier (ID): — l --- - -- -- - - - Spillway (Yes or No): Level (inches): 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: al 1019� I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. 6 q. rrcn Melvin Facility Owner/Manager (print) Facility Owner/Manager (signature) Phone: c110-2710 - IWO Date:°� L4 P0A Cover Page 2121100 II.- TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR/24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Sandhills Farm 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: - -- ---6.-Structure ID: n.lines 1+2+3+4+5+6= line m = 2088.9 lb PAN line m = lb PAN line m = lb PAN u . Iq line m = lb PAN M 2088.9 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN nQ rn uru!ru eeu PAMUr%T QC ADDi irn IN IRIAI(: TNIC an nAV PFRIOD_ o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance ftfwre) I. TOTAL PAN BALANCE FOR FIELD u. application window' T1127 F1 la bermuda 4.67 126.00 583.8 Mar- Sept T1127 F1 2a bennuda 4.20 125,00 525.0 Mar - Se t T1127 F1 5 bermuda 4.32 125.00 540.0 Mar - Se t T1127 F1 6 bermuda 4.04 125.00 505.0 Mar - Se t T1127 F3 11 b bermuda 5.42 125.00 677.5 Mar- Sept ** did not usall ulls/fields e to meet PAN balance. 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 2831.3 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 2088.9 lb. PAN x. Crop's remaining PAN balance (line v from section 111) = 2831.3 lb. PAN y. Overall PAN balance (w -x) = -742 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump an( haul, depopulation, herd reduction, etc. Forpump & haul and herd reduction options, recalculatenew PAN based on new information. If newfields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculatethe overall PAN balance. If animalwaste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels atthl receiving facility. NARRATIVE, Will pump as soon as conditions allow. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PANTO BE LANIDAPPLIED PER WASTE STRUCTURE _. 1. Structure Name/ldentffier (ID): Sandhills Farm 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 76.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 3.0 inches d. top of dike surface area according to design ctu e. line c/12 x line d x 7.48 gallons/ft3 387045 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 29D117 ft3 h. current herd # 8800 certified herd # 8800 actual waste produced = current herd # x line g = 290117 ft3 certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design 124775 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 517232 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/26/24 m. ((lines e + k)11000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 2.31 Ibs/1000 gal. 2088.9 Ibs. PAN PoA (30 Day) 2/21 /00