HomeMy WebLinkAbout090216_POA for high freeboard_20240808PLAN OF ACTION (Poo) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility wamw.[ ixY }S
Certified Operator Name, P °! i6r ae I . o ma Yl Operator#
Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways,
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Namelldenfifier (ID): i
Spillway (Yes or No): o�
Level (Inches): cP o _
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
VLiquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of water Resources prior to transfer of
waste to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
I hereby certify that 1-have reviewed the information listed above and-inctuned within the attached Plan
df Action, and to the best of my knowledge and ability, the information is accurate and correct,
email -T11OAAn
�
Facility Own (Manager (print)
(�t av S
Facility OwnerlManager (signature)
Phone 1 lo� g'�+ 325i
.Date: S I S I'm
PoA cover Page 2127/00
It. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: R & M
line m =
358.9 lb PAN
2. Structure ID:
line m =
lb PAN
3. Structure ID:
line m=
lb PAN
n.lines 1+2+3+4+5+6=
lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIFLDS TO WHICH PAN CANKInT RP APpI irn ni IRIMM TWIC Zn nnV =171Mn
o. tract #
p. field #
q. crop
r. acres
s. remairdng IRR-2
PAN balance
(Ib/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column rxs
u. application
window'
11170
1A
bermuda hav
3.57
150.00
535.5
Mar -Sept
11170
1B
bermuda hav
3.5
150.00
525.0
Mar -Sept
11170
2
bermuda hay
6
150.00
900.0
Mar -Sept
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 1960.5 lb. PAN
IV. FACILITY'S PDA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 358.9 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 1960.5 lb. PAN
y. Overall PAN balance (w - x) = -1602 lb. PAN
Line ymust showas a deficit. If line y does not show as a deficit, list course of action here including pump
and haul, depopulation, herd reduction, etc. Forpump & haul and herd reduction options, recalculate new
PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add
these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be
hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard
levels at the receiving facility.
NARRATIVE:
will begin pumping as soon as weather permits.
PoA (30 Day) 2/21100
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): JR&M
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
28.0 inches
30.0 inches
2.0 inches
— -— — —
61200 ft�
76296 gallons
180 days
g. volume of waste produced according to structural design 46888 ft3
h. current herd # 6400 certified herd # 6400
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I, current waste analysis dated F 5/14/24
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
46888 ft3
30976 ft3
38658 ft3
145264 gallons
1.62 Ibs/1000 gal.
358.9 Ibs. PAN
PoA (30 Day) 2/21 /00