Loading...
HomeMy WebLinkAboutNC0020940_2023_PAR_review_form_20240823Docusign Envelope ID: F1DBBF26-5AEF-4610-BACB-D5937524844B Regional Pretreatment Annual Report (PAR) Review Is the PAR on time? Does it have two copies? Did they send any other submissions with it? Included? ADEQUATE? POTW noted Corrections? Narrative ❑ YES ❑ NO ® NA ❑ YES ❑ NO ® NA PPS Form ® YES ❑ NO ® YES ❑ NO SNCR ® YES ❑ NO ® YES ❑ NO IDSF ❑ YES ❑ NO ❑ YES ❑ NO Allocation Table ❑ YES ❑ NO ❑ YES ❑ NO Compliance Schedules ❑ YES ❑ NO ® NA ❑ YES ❑ NO ® NA Public Notice ❑ YES ❑ NO ® NA ❑ YES ❑ NO ® NA Program Information ® YES ❑ NO ® YES ❑ NO ❑ YES ❑ NO Historical SNC ❑ YES ❑ NO ® NA ❑ YES ❑ NO ® NA ❑ YES ❑ NO ❑ NA Regional Office: ARO POTW: Town of Murphy NPDES Permit No. NCO020940 Report Period: 01/2023 to 12/2023 ❑ Full ® Modified For modified programs evaluate shaded items only. A Narrative is required for a modified program only if there are SIUs in SNC. If No, check recommendation below; 1. Have at least 90% of SIU permits been issued within 180 ❑ Yes ❑ No ® Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty days of expiration? See Allocation Table). Assessment 2. Were at least 80% of SIUs inspected? (See PPS Form) ® Yes ❑ No ❑ Not req'd ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment 3. Has effective enforcement been taken against industries in ❑ Yes ❑ No ® NA ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty SNC, including those causing pass -through or interference? (See Assessment Narrative and SNCR Form) 4. Does public notice cover all SIUs in SNC? ❑ Yes ❑ No ❑ NA ❑ NOD ❑ NOV ❑ QNCR ❑ NCP ❑ Civil Penalty Assessment vole: tXCemons snoula De exDlalnea In the comment secuon Deiow: Reviewed By: Rachel Rose Date: 08/23/2024 [IVDocuSigned by: SACE19D3940C494... Regional Pretreatment Annual Report Review $8c38b4cfa21 e$CC 1103246ED94433851 ED2ADBAEF9256.docx 16