HomeMy WebLinkAboutNCC242592_Site Plan or Location Map_20240823 PROJECT NARRATIVE
0 ■„1�0r
THE PURPOSE OF THE PROJECT IS TO REBUILD A PORTION OF THE FAYETTEVILLE-FAYETTEVILLE DUPONT �� � �-�. •i ��� �
SW STATION 115KV LINE(0L106).DUKE ENERGY PROGRESS(DEP)INTENDS TO UPRATE THE FAYETTEVILLE E�
FAYETTEVILLE DUPONT 115KV SW.STA.LINE TO ALLOW FOR MORE RENEWABLE GENERATION.TO Oil Ilal -��
ACCOMMODATE SAID UPRATE,APPROXIMATELY 4.7 MILES OF THIS LINE WILL BE ����� � �
REBUILT/RECONDUCTORED,FROM STR.212 TO THE FAYETTEVILLE 230KV SUBSTATION.THE PORTION OF 41Th ��
NOR H TO THE LINE EXTENDS FROM SUBSTATION.
N ROAD,IN THE TOWN OF HOPE MILLS,PROGRESSINGDUKE ���� V����
NORTH IS THE FAYETTEVILLE 230KVFROM SUBSTATION. i
rti
AT THE NORTHERN END OF THE PROJECT,THE OL106 LINE SHARES RIGHT OF WAY(ROW)WITH THEIf/ �A..
FAYETTEVILLE-VANDER 115KV SOUTH LINE(OL190). PROJECT WORK ALSO INCLUDES STRUCTURE PROJECT
REMOVALS AND REPLACEMENTS ALONG 0.65 MILES OF LINE OL190.THE COMBINED LENGTH,INCLUDING LOCATION ins.;
BOTH OL106 AND OL190,IS APPROXIMATELY 5.35 MILES.
k4
THE ENTIRETY OF THE PROJECT IS IN CUMBERLAND COUNTY,NORTH CAROLINA. THE FAYETTEVILLE-FA ��
ALL EEXISE DUPONTG115KV SW. M.LINE CURRENTLY EXISTS0 IN A WOOD N OF T C TOWER
ION.STR
ALL THE EXISTING STRUCTURES FROM STR.213 TO STR.250,WITH EXCEPTION OF LATTICE TOWER STRS.540 GPS AND 541 GPS WILL BE REMOVED/REPLACED OR MODIFIED.THIS INCLUDES 24 X WOOD H-FAMES, ENERGY.
9 X STEEL H-FRAMES,3 X WOOD 3-POLE DEAD-ENDS,AND STEEL 3-POLE DEAD-END STR.250.NEW
STRUCTURE INSTALLATIONS WILL CONSIST OF WEATHERING STEEL POLES,AND INCLUDES 3 Xt40
SINGLE-POLES,33 X H-FRAMES,4 X 3-POLE DEAD-ENDS,2 X DC RESTRAINED H-FRAMES,AND ENGINEERED
SINGLE-POLE DEAD-ENDS STR.215 AND STR.217.DOUBLE-CIRCUIT RESTRAINED H-FRAMES,STR.540-1
AND STR.541-1,WILL BE INSTALLED TO RAISE THE ADJACENT FAYETTEVILLE-FAYETTEVILLE DUPONT
115KV SW.STA.LINE AND MAINTAIN CLEARANCE TO THE FAYETTEVILLE-VANDER 115KV SOUTH LINE.TO NORTH & SOUTH CAROLINA STATE MAP
ACCOMMODATE THE REBUILD,AN ADDITIONAL TWO STRUCTURES OF THE FAYETTEVILLE-VANDER 115KV
SOUTH LNE MUST BE REMOVED/REPLACED.EXISTING WOOD H-FRAME STR.538 WILL BE REPLACED WITH A STEEL IHFRAME,AND XSTINGWOOD H-FAME STR5339 WILL BE REPLACED WITH A STEEL RESTAINED FAYETTEVILLE-FAYETTEVILLE DUPONT SW. STA. 115kV LINE- REBUILD
"-FAME. FAYETTEVILLE-FAYETTEVILLE DUPONT 115kV LINE (0L106) &
WETLANDS AND JURISDICTIONAL STREAMS HAVE BEEN MAPPED OUT FOR THE PROJECT. AS A A
PRECAUTION,IBUTARIESNP UTILIZESE A 30'CE AT R ALL LITTLE
AND A R BUFFER ON ALL WETLANDS, FAYETTEVILLE VANDER 115kV O L 1 9 O
TRIBUTARIES,AND OTHER SURFACE WATERS. LITTLE ROCKFISH CREEK(18-31-24-(7);C),WHICH IS A ( ) SHEET LIST:
FEMA-REGULATED SURFACE WATER,PASSES THROUGH THE PROJECT LIMITS. STR#215,WHICH IS TO BE
REPLACED,LIES IN THE 100-YR FLOODPLAIN. THE WORK ASSOCIATED WITH THE REPLACEMENT OF FAYETTEVILLE, NORTH CAROLINA TITLE SHEET SHEET PTL
STR#215 IS BEING COORDINATED WITH THE TOWN OF HOPE MILLS FOR FLOODPLAIN DEVELOPMENT.
EROSION&SEDIMENT CONTROL NOTES SHEET PEN1
THE TOTAL LIMITS OF DISTURBANCE(LOD)FOR THE PROJECT ARE LISTED AS 46.1 ACRES;HOWEVER, EROSION&SEDIMENT CONTROL NOTES SHEET PEN2
MUCH OF THE AREA ENCOMPASSES ACCESS TO THE TRANSMISSION LINE STRUCTURES AND TREE EROSION&SEDIMENT CONTROL NOTES SHEET PEN3
CLEARING. GROUND DISTURBANCE WILL BE LIMITED TO THE CONSTRUCTION ENTRANCE AREAS,ACCESS EROSION&SEDIMENT CONTROL PLANSHEET P1
PATHS,AND WORK AROUND STRUCTURES. NO DESIGNATED STOCKPILE OR LAYDOWN AREAS ARE EROSION&SEDIMENT CONTROL PLANSHEET P2
ANTICIPATED ON THE SITE. EROSION&SEDIMENT CONTROL PLANSHEET P3
EROSION&SEDIMENT CONTROL PLANSHEET P4
THE PROJECT IS LOCATED WITHIN DUKE ENERGY'S MOWED AND MAINTAINED RIGHT-OF-WAY. THE PRIOR EROSION&SEDIMENT CONTROL PLANSHEET P5
USE OF THE SITE IS TRANSMISSION INFRASTRUCTURE AND THE PROJECT WILL NOT CHANGE THE EROSION&SEDIMENT CONTROL PLANSHEET P6
EXISTING LAND USE. PRIOR TO CONSTRUCTION,A DUKE ENERGY CONSTRUCTION CONTRACTOR WILL LATITUDE. 35.003611 EROSION&SEDIMENT CONTROL PLANSHEET P7
INSTALL EROSION CONTROL MEASURES TO ENCOMPASS THE ANTICIPATED CONSTRUCTION LIMITS. EROSION&SEDIMENT CONTROL PLANSHEET P8
PREDEVELOPMENT CONDITIONS WILL BE RESTORED AND THE AREA WILL BE STABILIZED PRIOR TO LONGITUDE: -78.926378 EROSION&SEDIMENT CONTROL PLANSHEET P9
COMPLETION OF CONSTRUCTION. EROSION&SEDIMENT CONTROL PLANSHEET P10
EROSION&SEDIMENT CONTROL PLANSHEET P11
AN AVOIDANCE AND MINIMIZATION OF DISTURBANCE APPROACH HAS BEEN INCORPORATED INTO THE EROSION&SEDIMENT CONTROL PLANSHEET P12
DESIGN OF THE EROSION CONTROL MEASURES BY UTILIZING EXISTING ACCESS POINTS AND STABILIZED EROSION&SEDIMENT CONTROL PLANSHEET P13
RIGHT-OF-WAY ACCESS ROUTES,WHENEVER POSSIBLE. EROSION CONTROL MEASURES ARE INDICATED EROSION&SEDIMENT CONTROL PLANSHEET P14
HEREIN FOR PERMITTING USE ONLY BY NCDEQ. THE INITIAL PROJECT DURATION IS ANTICIPATED TO EROSION&SEDIMENT CONTROL PLANSHEET P15
START IN JANUARY,2025 AND BE COMPLETED NOVEMBER,2026. EROSION&SEDIMENT CONTROL PLANSHEET P16
EROSION&SEDIMENT CONTROL PLANSHEET P17
EROSION&SEDIMENT CONTROL PLANSHEET P18
GENERAL NOTES EROSION&SEDIMENT CONTROL PLANSHEET P19
1. APPROXIMATE STRUCTURE LOCATIONS WERE PROVIDED TO DUKE ENERGY LINE ENGINEER AND ARE - ------ - - - - -;-- - - - -- -- -- - -- - -- - -- -- - ------ -- EROSION&SEDIMENT CONTROL PLANSHEET P20
FOR REFERENCE ONLY.THESE DRAWINGS SHALL NOT BE USED FOR LINE CONSTRUCTION. EROSION&SEDIMENT CONTROL PLANSHEET P21
2. BASE DRAWINGS WERE CREATED BY GIS DATA OBTAINED FROM VARIOUS SOURCES.TOPOGRAPHIC ROPE MILLS LANE EROSION&SEDIMENT CONTROL PLANSHEET P22
AERIAL PHOTOGRAPHY WAS OBTAINED FROM STATE AGENCIES. EROSION&SEDIMENT CONTROL PLANSHEET P23
3. NOT ALL EXISTING UTILITIES ARE SHOWN. LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE �® --5' .,.1,p EROSION&SEDIMENT CONTROL PLANSHEET P24
` EROSION&SEDIMENT CONTROL PLANSHEET P25
CONTRACTOR'S RESPONSIBILITY TO ACCURATELY LOCATE,BOTH VERTICAL AND HORIZONTAL, �; y, _ a EROSION&SEDIMENT CONTROL PLANSHEET P26
EXISTING UTILITIES PRIOR TO THE START OF CONSTRUCTION.THE CONTRACTOR SHALL NOTIFY NC 0 o EROSION&SEDIMENT CONTROL PLANSHEET P27
811 PRIOR TO EXCAVATION. CONTRACTOR SHALL NOTIFY DUKE ENERGY IMMEDIATELY IN THE EVENT �4 , ..-,a t, ��: EROSION&SEDIMENT CONTROL PLANSHEET P28
OF ENCOUNTERING ANY UNDERGROUND OBSTACLE REQUIRING DEVIATION FROM THE PLAN. COST TO 0 .. w ....: EROSION&SEDIMENT CONTROL DETAILS SHEET PED1
REPAIR DAMAGED UTILITIES SHALL BE BORNE BY THE CONTRACTOR. _ EROSION&SEDIMENT CONTROL DETAILS SHEET PED2 0
a .X EROSION&SEDIMENT CONTROL DETAILS SHEET PED3 J
4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR - -- ®®0� O q� 4 >, EROSION&SEDIMENT CONTROL DETAILS SHEET PED4 5
SHALL NOT DISTURB UTILITY POLES,GUYS WIRES,OR ANCHORS WITHOUT PERMISSION FROM DUKE '+'fc
ENERGY. ® ' CO
LU
5. PROJECT IS LOCATED IN THE CAPE FEAR RIVER BASIN. LITTLE ROCKFISH CREEK(18-31-24-(7);C)PASSES ,oROPEMILLs ®® MIGRATORY BIRD HOTLINE CC
THROUGH THE PROJECT LIMITS.ADDITIONAL SURFACE WATERS DOWNSTREAM OF THE PROJECT LIMITS ®® STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY
INCLUDE:ROCKFISH CREEK(18-31-(18);B)AND BLOUNTS CREEK(18-27-5;C).THE PROJECT IS NOT <eO, W
416kSERVICE AREA.INTERACTIONS OF BIRDS WITH GENERATING FACILITIES,TRANSMISSION AND DISTRIBUTIONS,
SUBJECT TO STATE-REGULATED BUFFER REQUIREMENTS. ON'4p .+W O o�?° SUBSTATIONS,OTHER STRUCTURES AND EQUIPMENT,AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO Z
6. SEE SHEET PEN1 FOR EROSION AND SEDIMENTATION CONTROL SEQUENCE AND SEEDING SCHEDULE. _ �t BIRDS. DUKE ENERGY OPEATES THESE 24-HOUR MIGATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND J
7. STREAMS EXTEND BEYOND THE RIGHT-OF-WAY. APPROPRIATE BRIDGING AND MATTING OF THESE tA1S�4'r'� �j (�. r -'-q "R CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES.
FEATURES IS REQUIRED SHOULD THE CONTRACTOR USE ANY ACCESS ROUTES LOCATED OUTSIDE OF -+ '' _. , •i $•K�' ' j fit A" '. -
THE RIGHT-OF-WAY. ea j y$ CAROLINAS:800.573.3853 FLORIDA:727.386.3084 MIDWEST:317.430.4497 1-
8. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY DUKE ENERGY '.i '-. ,I �+° .�'*� y
PERMITTING PRIOR TO USE. y; / , :`- � SPILL REPORTING HOTLINE Q
9. CONSTRUCTION ENTRANCES ARE SHOWN FOR REFERENCE ONLY. HEAVY MATS MAY BE USED IN LIEU ,it:,
.
* IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT,FEDERAL AND STATE LAWS I-
OF ROCK CONSTRUCTION ENTRANCES IF DEEMED SUFFICIENT BY A DUKE ENERGY REPRESENTATIVE. 4 * k (n
t .Ol•-� r r' '--' Y* tyl , -RE REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER
10. WETLAND MATTING SHALL BE COMPOSITE MATS. NO LATTICE OR TWO-PLY MATTING SHALL BE USED \r. +, x
IN JURISDICTIONAL WETLANDS AND/OR STREAMS. _ s .,t \ -// 76+ g', F REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION.IMMEDIATELY NOTIFY YOUR
ttl AYEnEVILLE
`- ' SUPERVISOR AND THE FIELD ENVIRON ENS PROFESSIONAL WHEN A SPILL OR U TEED RELEASE IS
11. NO OIL/FUEL-FILLED EQUIPMENT SHALL BE STORED OVERNIGHT WITHIN 100 FEET OF WETLANDS OR �L' " ?iA+is ff i I -yam y x ,� DISCOVERED.IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAUEHS PROFESSIONAL,CONTACT ONE OF
SURFACE WATER WITHOUT CONTAINMENT. A d F THE DUKE ENERGY SPILL REPORTING HOTLINES AT: I-
12. SITE SHOULD BE"STORM READY"AT THE END OF EACH WORK DAY/WEEK. �,- - _ CAROLINAS&MIDWEST:800.527.3853 Z
13. SECURE WRITTEN ACCESS AGREEMENT IS REQUIRED FOR ALL 3RD PARTY ACCESS AND PRIVATE FLORIDA:866.769.1266 0
DRIVES NOT INCLUDED IN ROW DOCUMENTATION PRIOR TO BEGINNING CONSTRUCTION "P - ;,( t. � `'�• d
e
14. ALL DISTURBED AREAS SHALL BE RESTORED TO SAME OR BETTER CONDITION.PERMANENT GROUND n_ 4 �,I �' .1. 0
COVER SHALL BE USED FOR STABILIZATION. '�' "` � n .e s'. e+ Ty CONTACTS
Y
:+ems,,,-. 4 .4.2 ) it' lt, PERMITTING SPECIALIST HDR Engineering Inc. RESPONSIBLE FOR MAINTENANCE: J
Duke Energy Progress of the Carolinas NAME J
Khadijah Hasan David R.Wagner II,PE PH:
V I C I N I TY MAP 410 S.Wilmington Street 555 Fayetteville St,Suite 900 FAX: w
Raleigh,NC 27601 Raleigh,NC 27601 EMAIL@EMAIL.COM I-
SCALE: NTS P:(336)340-4312 PH:(919)232-6600 I-
CONTRACTOR SHALL NOTIFY "NORTH CAROLINA ONE CALL" (811) khadijah.hasan@duke-energy.com david.wagner@hdrinc.com W
OR (1-800-632-4949) AT LEAST 48 HOURS PRIOR TO Q
BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING LL
UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL di
UTILITIES THAT PROVIDED THEIR OWN LOCATOR SERVICES J
INDEPENDENT OR "NORTH CAROLINA ONE CALL". REPORT ANY
ti DUKE FAYETTEVILLE-FAYETTEVILLE
DISCREPANCIES TO THE ENGINEER IMMEDIATELY. 5
W
DUPONT SW.STA.115kV LINE- H
ENERGY
HDR Engineering,Inc.of the Carolinas W
AI-
<
I ��J 555 Fayetteville St,Suite 900 Raleigh,N.C.27601
N.C.B.E.L.S. License Number:F-01 16 P R G E REBUILD
S EROSION CONTROL AND ACCESS
PLAN
550 S. TRYON ST.,SUITE 4500
CHARLOTTE N.C.28202 LINE INDEX: DRAWING SHEET
REV FILE NO. DATE REVISION DRAWN CHECKED APPROVED TELEPHONE NO.(919)546-2090 OL106 E220087 PTL