Loading...
HomeMy WebLinkAboutSW8060740_Historical File_20090123 �F wArF %�� �Q Beverly Eaves Perdue,Governor Dee Freeman,Secretary 0 , r North Carolina Department of Environment and Natural Resources '�`' Coleen H.Sullins,Director - �� : ' Division of Water Quality January 23, 2009 Mr. Timothy J. Walter, Vice President 701 East Bay, inc., General Partner Port City Limited Partnership 201 N. Front Street, Suite 314 Wilmington, NC 28401 Subject: Stormwater Permit No. SW8 060740MOD Myrtle Grove Village Shopping Center High Density Commercial Subdivision Project New Hanover County Dear Mr. Walter: The Wilmington Regional Office of the Division of Water Quality received a complete, modified Stormwater Management Permit Application for Myrtle Grove Village Shopping Center on January 23, 2009. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 060740MOD, dated January 23, 2009, for the construction of the subject project. This modification eliminates the previously permitted offsite area#2 from the drainage area of Pond#2. Please remove sheets C4.0A and C8.4 from the plans approved on October 16, 2006, and replace with the new ones, attached. This permit shall be effective from the date of issuance until October 16, 2016, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 796-7215. Sin rely, Sca5C3r eorgett Scott Stormwater Supervisor Division of Water Quality GDS/arl: S:IWQSISTORMWATERIPERMIT1060740MOD.jan09 cc: Robert P. Balland, P.E., Paramounte Engineering, Inc. New Hanover County Building Inspections New Hanover County Engineering Linda Lewis Wilmington Regional Office Central Files Mailing Address Phone(910)796-7215 Internet: www.ncwateraualitv.org 127 Cardinal Drive Extension Fax (910)350-2004 Carolina Wilmington,NC 28405 Customer Service 1-877 623-6748 �.Q"� An Equal Opportunity/Affirmative Action Employer—50%Recycled/10%Post Consumer Paper State Stormwater Management Systems Permit No. SW8 060740MOD STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Timothy J. Walter, 701 East Bay, Inc. and Port City Limited Partnership Myrtle Grove Village Shopping Center 5511 Carolina Beach Road, Wilmington, New Hanover County FOR THE construction, operation and maintenance of two wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until October 16, 2016 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.5 of this permit. The subdivision is permitted for 3 outparcel lots, each allowed a maximum built-upon area as follows: 33,715 ft2 for Outparcel A; 19,994 ft2 for Outparcel B; and 397,136 ft2 for the Home Depot. Outparcels A and B drain to Pond #1. There is no allotment of built-upon area in DA#3 and there is no allotment of future built-upon area in either Pond #1 or Pond #2. Roadway improvements for Piner Road consist of 60,960 square feet of built-upon area and runoff will be treated by roadside swales. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 2 of 8 1 State Stormwater Management Systems Permit No. SW8 060740MOD 5. The following design elements have been permitted for the two (2) wet detention pond stormwater facilities, and must be provided in the systems at all times. Design Criteria Pond#1 Pond#2 Rules Version 1995 1995 a. Drainage Area, acres: 11.07 32.23 Onsite, ft2 263,102 1,403,939 Offsite, ft2 219,107 0 b. Total Impervious Surfaces, ft2 344,690 1,065,346 (1) Buildings None 200,231 (2) Roads/Parking 40,075 545,290 (3) Other 147,799 319,825 -Home Depot 94,090 303,046 -Outparcel A 33,715 0 -Outparcel B 19,994 0 -Sidewalk 0 16,779 (4) Offsite 156,816 0 c. Design Storm, inches 1.0 1.0 d. Pond Depth, feet 7.0 6.0 e. TSS removal efficiency 90 90 f. Permanent Pool Elev., FMSL 14.0 16.6 g. Perm. Pool Surface Area, ft2 15,694 86,830 h. Permitted Storage Volume, t' 27,727 373,178 i. Temporary Storage Elev., FMSL 15.6 20.35 j. Controlling Orifice, "0 pipe 2.0 4.0 k. Permitted Forebay Volume, fe 12,171 119,662 I. Receiving Stream/River Basin Motts Creek/Cape Fear m. Stream Index Number 18-82 n. Classification of Water Body C; Sw o. Max. fountain pump HP 2 2 II. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built-upon area for the entire lot, including driveways and sidewalks, does not exceed the allowable built-upon area. Once the lot transfer is complete, the built-upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built-upon area limit is transferred to the individual property owner. 3. If an Architectural Review Board or Committee is required to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built-upon area. Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUR limit. 4. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 3 of 8 State Stormwater Management Systems Permit No. SW8 060740MOD 5. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. c. Transfer of ownership. d. Redesign or addition to the approved amount of built-upon area. e. Further development, subdivision, acquisition, or sale of all or any part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 6. The Director may determine that other revisions to the project should require a modification to the permit. 7. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 9. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 060740MOD, as issued by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. c. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. The maximum built-upon area is as follows: Outparcel A at 33,715 ft2; Outparcel B at 19,994 ft2; and Home Depot at 397,136 ft2. This allotted amount includes any built-upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. h. All runoff from built upon area on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. Page 4 of 8 State Stormwater Management Systems Permit No. SW8 060740MOD i. Built-upon area in excess of the permitted amount will require a permit modification. 10. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 11. Permanent seeding requirements for the stormwater control must follow the guidelines established in the NC E&SC Planning and Design Manual. 12. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 13. Decorative spray fountains will be allowed in the wet detention pond stormwater treatment systems, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump is based on the permanent pool volume. The maximum pump power for a fountain in the wet detention ponds is listed on page 3 of this permit in Section 1.5. 14. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 15. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 16. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 17. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 18. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. Page 5 of 8 State Stormwater Management Systems Permit No. SW8 060740MOD III. GENERAL CONDITIONS 1. This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality, signed by the parties involved, accompanied by the appropriate documentation as listed on page 2 of the form. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. Neither the sale of the project nor the transfer of common area to a third party constitutes legal transfer of this stormwater permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Permittee grants permission to DENR staff to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 10. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit, to include a renewal application and fee. Permit modified and reissued this the 23rd day of January 2009. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION • o leen . Sullins, irector Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 060740MOD Page 6 of 8 DWQ USE ONLY Date Received Fee Paid Permit Number �—Z Z-20)9(ifcil) State of North Carolina Department of Environment and Natural Resources RECEIVED Division of Water Quality DEC 1 2 2008 STORMWATER MANAGEMENT PERMIT APPLICATIOI+ RM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name(specify the name of the corporation,individual,etc.who owns the project): Port City Limited Partnership 2. Print Owner/Signing Official's name and title(person legally responsible for facility and compliance): 7'i h�ofh T�T.Walter,Vice-President of Corporate General Partner 3. Mailing Address for person listed in item 2 above: 201 N.Front Street,Suite 314 City:Wilmington State:NC Zip:28401 Phone: (910 ) 763-7624 Fax: (843 ) 724-3400 Emaillwalter@zpi.net 4. Project Name(subdivision,facility,or establishment name-should be consistent with project name on plans, specifications,letters,operation and maintenance agreements,etc.): Myrtle Grove Village Shopping Center 5. Location of Project(street address): 5511 Carolina Beach Road City:Wilmington County:New Hanover Zip:28409 6. Directions to project(from nearest major intersection): Southeast corner at Monkey Junction at the corner of Piner Road and Carolina Beach Road. 7. Latitude:34°08' 13"N Longitude:77°53'30" W of project 8. Contact person who can answer questions about the project: Name:Robert P.Balland,PE Telephone Number: (910 ) 791-6760 Email:rballand@paramounte-eng.com II. PERMIT INFORMATION: 1. Specify whether project is(check one): ONew ['Renewal CA Modification 2. If this application is being submitted as the result of a renewal or modification to an existing permit,list the existing permit numberSW8 060740 Mod and its issue date (if known)March 19,2007 3. Specify the type of project(check one): Form SWU-101 Version 0925.08 Page 1 of 4 • ❑Low Density ZHigh Density ['Redevelop DGeneral Permit DUniversal SMP ['Other 4. .Additional Project Requirements(check applicable blanks;information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): DCAMA Major ►CISedimentation/Erosion Control 0404/401 Permit ❑NPDES Industrial Stormwater III. PROJECT INFORMATION 1. In the space provided below,summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages)describing stormwater management for the project. Stormwater runoff is controlled by a storm drainage conveyance system flowing into two wet detention ponds and roadside swales 2. Stormwater runoff from this project drains to the Cape Fear River basin. 3. Total Property Area:57.06 acres 4. Total Coastal Wetlands Area:0 acres 5. Total Property Area(3) — Total Coastal Wetlands Area(4) = Total Project Area**:57.06 acres 6. (Total Impervious Area / Total Project Area)X 100 = Project Built Upon Area(BUA):71.4 % 7. How many drainage areas does the project have?5 8. Complete the following information for each drainage area. If there are more than two drainage areas in the project,attach an additional sheet with the information for each area provided in the same format as below. For high density projects,complete the table with one drainage area for each engineered stormwater device. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name see attached table See attached table Stream Class&Index No. Total Drainage Area(sf) On-site Drainage Area(sf) Off-site Drainage Area(sf) Existing Impervious*Area(sf) Proposed Impervious*Area(sf) %Impervious*Area(total) Impervious*Surface.Area Drainage Area 1 Drainage Area 2 On-site Buildings(sf) On-site Streets (se - On-site Parking (sf) On-site Sidewalks (sf) • • Other on-site (se Off-site (se Total (se: *Impervious area is defined as the built upon area including,but not limited to,buildings,roads,parking areas, sidewalks,gravel areas,etc. **Total project area shall be calculated to exclude Coastal Wetlands from use when calculating the built upon area percentage calculation. This is the area used to calculate overall percent project built upon area(BLIA). 9. How was the off-site impervious area listed above derived?Existing offsite(by aerial photo) Form SWU-101 Version 09.25.08 Page 2 of 4 ts �r. Dre 1 2 2006 BY: C c CO 0 23 _ v7q 20/ ODDkUCD o m .4 o o o 0 0 o eo $ , 6 ® 0 10etN R 0 -oa) O ® V 22 a) ® o � o o co N- co c_ w � � � n'-' as 0. il) 0 0 2 2 la E. § CO0.7 a) CD liC CD c ^ gt @ q � a) ■ n «8 @ Eg i cr- > a) O $ ()0 0 0 I@ m N o N N .o m 0- 707 0 � /q co S - $ $ _ § q 0 a) 0 M tic M CO RI co / n ¥ &c cn ofo•_ N CD %0000iC + c o Tr c Co # v- 0 0 - , Q 1-- it, La c � . �0 2 k * * d ■ 2 | - e I-° 2 C' 2 h E.D. * ca E. . k <O.)‹ ' ° § w|z � % % ®. ca £ @ : a) a) �to k_|E « � ` \® @@g' e � E% qal eoc : ■ CIe $ _ � — E - ■ � 0- E 2 ■ - ■ 2m R23jo0 _ 13 3CO � a3 ƒ o - . EOaREm � � 4a � fo@ 2To cc?) & fcou, fo2 | 00lE—OOw �|k £ 000000 Projects in Union County: Contact the DWQ Central Office staff to check to see if you project is located within a Threatened&Endangered Species watershed that may be subject to more stringent stormwater requirements. IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following property restrictions and protective covenants are required to be recorded for all subdivisions,outparcels and future development prior to the sale of any lot. If lot sizes vary significantly,a table listing each lot number,size and the allowable built-upon area for each lot must be provided as an attachment. Forms can be downloaded from http://h2o.enr.state.nc.us/su/bmp forms.htm-deed restrictions. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below,you certify that the recorded property restrictions and protective covenants for this project shall include all the applicable items required in the above form,that the covenants will be binding on all parties and persons claiming under them,that they will run with the land,that the required covenants cannot be changed or deleted without concurrence from the NC DWQ,and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s)listed below must be submitted for each BMP specified for this project. Contact the Stormwater Permitting Unit at(919)807-6300 for the status and availability of these forms. Forms can be downloaded from http://h2o.enr.state.nc.us/su/bmp forms.htn,. Form SW401-Low Density Low Density Supplement Form SW401.-Curb Outlet System Curb Outlet System Supplement Form SW401-Off-Site System Off-Site System Supplement Form SW401-Wet Detention Basin Wet Detention Basin Supplement Form SW401-Infiltration Basin Infiltration Basin Supplement Form SW401-Infiltration Trench Underground Infiltration Trench Supplement Form SW401-Bioretention Cell Bioretention Cell Supplement Form SW401-Level Spreader Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Form SW401-Wetland Constructed Wetland Supplement Form SW401-Grassed Swale Grassed Swale Supplement Form SW401-Sand Filter Sand Filter Supplement Form SW401-Permeable Pavement Permeable Pavement Supplement Form SW401-Cistern Cistern Supplement Form SWU-101 Version 09.25.08 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality(DWQ). A complete package indudes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at http://h2o.enr.state.nc.us/su/msi maps.htm) 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form 2Po/3 • Original and one copy of the Deed Restrictions&Protective Covenants Form(if ,,v J4 required as per Part IV above) • Original of the applicable Supplement Form(s)and O&M agreement(s)for each BMP 12Pt • Permit application processing fee of$505(Express:$4,000 for HD,$2,000 for LD) payable to NCDENR • Calculations&detailed narrative description of stormwater treatment/managementb • Copy of any applicable soils report N/A- • Two copies of plans and specifications(sealed,signed&dated),including: 'R et!) -Development/Project name -Engineer and firm -Legend -North arrow -Scale -Revision number&date -Mean high water line -Dimensioned property/project boundary -Location map with named streets or NCSR numbers -Original contours,proposed contours,spot elevations,finished floor elevations -Details of roads,drainage features,collection systems,and stormwater control measures -Wetlands delineated, or a note on plans that none exist -Existing drainage(including off-site),drainage easements,pipe sizes,runoff calculations -Drainage areas delineated -Vegetated buffers(where required) VII. AGENT AUTHORIZATION • If you wish to designate authority to another individual or firm so that they may provide information on your behalf(such as additional information requests),please complete this section. (ex.designing engineer or firm) Designated agent(individual or firm):Paramounte Engineering,Inc. Mailing Address:5911 Oleander Drive,Suite 201 City:Wilmington State:NC Zip:28403 Phone: (910 ) 791-6707 Fax: (910 ) 791-6760 Email:rballand@paramounte-eng.com VIII.APPLICANT'S CERTIFICATION I,(print or type name of person listed in General Information,item 2)Timothy J. Walter certify that the information induded on this permit application form is,to the best of my knowledge,correct and that the project will be constructed in conformance with the approved plans,that the required deed restrictions and protective covenants will be recorded,and that the proposed project complies with the requirements of 15A NCAC 2H.100 1. � p C Signature: D 2'Ic—ate: 1U Form SWU-101 Version 09.25.08 Page 4 of 4 Permit No.5/v 7 v(C5 -r O ECG (to be provided by DWQ) NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out,printed and submitted. The Required Items Checklist(Part Ill)must be printed,filled out and submitted along with all of the required information. PROJECT tNFORMATJON _ Project name Myrtle Grove Village Shopping Center(Peme14 Contact person Robert P.Selland,PE Phone number 910-791-6707 Date 19-Jan-09 Drainage area number No.2 C►t. DESIGN INFORMATION Site Characteristics Drainage area 1,403,939 ftz Impervious area,post-development 1,065,042 ft2 %impervious 75.86 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required 85,728 ft3 OK Volume provided 373,178 ft3 OK,volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5"runoff volume ft3 Pre-development 1-yr,24-hr runoff f3 Post-development 1-yr,24-hr runoff ft3 Minimum volume required Xft3 Volume provided ft3 Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak flow required? N (Y or N) 1-yr,24-hr rainfall depth in } - Rational C,pre-development (unitless) R 'r Rational C,post-development (unitless) Rainfall intensity:1-yr,24-hr storm inlhr JAN 2 2 2009 Pre-development 1-yr,24-hr peak flow ft3/sec Post-development 1-yr,24-hr peak flow ft3/sec BY: Pre/Post 1-yr,24-hr peak flow control ft3/sec " Elevations Temporary pool elevation 20.35 fmsl Permanent pool elevation 18 60 fmsl SHWT elevation(approx.at the perm.pool elevation) fmsl Top of 10ft vegetated shelf elevation fmsl Bottom of 10ft vegetated shelf elevation fmsl Sediment cleanout,top elevation(bottom of pond) fmsl Sediment cleanout,bottom elevation fmsl Sediment storage provided ft Is there additional volume stored above the state-required temp.pool? y (Y or N) Elevation of the top of the additional volume 00,3 5 this! Form SW401-Wet Detention Basin-Rev.5 Parts I.&II.Design Summary,Page 1 of 2 Permit No. (to be provided by DWQ) IL DESIGN INFORMATION Surface Areas Area,temporary pool /0Ll C!3 ft2 Area REQUIRED,permanent pool 36,502 ft2 SA/DA ratio 2.60(unitless) Area PROVIDED,permanent pool,Apermynd 86,830 ft OK Area,bottom of 10ft vegetated shelf,Abor bheir ft2 Area,sediment cleanout,top elevation(bottom of pond),Abotpaed 55,912 ft Volumes Volume,temporary pool 373,178 tt3 OK Volume,permanent pool,Vpem_paw, 535,207 ft3 Volume,forebay(sum of forebays if more than one forebay) 119,662 ft3 Forebay%of permanent pool volume 22.4% % Insufficient forebay volume. SA/DA Table Data Design TSS removal 90% Coastal SA/DA Table Used? Y (Y or N) Mountain/Piedmont SA/DA Table Used? N (Y or N) SA/DA ratio 2.60(unitless) Average depth(used in SA/DA table): Calculation option 1 used?(See Figure 10-2b) (Y or N) Volume,permanent pool,Vpemmuool ft' Area provided,permanent pool,ApB n_rawi ft2 Average depth calculated ft Average depth used in SA/DA,claw(Round to nearest 0.5ft) ft Calculation option 2 used?(See Figure 10-2b) (Y or N) Area provided,permanent pool,Apertnyod ft2 Area,bottom of 10ft vegetated shelf,A shelf ft2 Area,sediment cleanout,top elevation(bottom of pond),Ab „d ft2 "Depth"(distance b/w bottom of 10ft shelf and top of sediment) ft Average depth calculated ft Average depth used in SA/DA,claw(Round to nearest 0.5ft) ft Drawdown Calculations Drawdown through orifice? r (Y or N) Diameter of orifice(if circular) 4.00 in Area of orifice(if-non-circular) in2 Coefficient of discharge(Co) 0.60(unitless) Driving head(Ho) 1.25 ft Drawdown through weir? M (Y or N) Weir type (unitless) Coefficient of discharge(Cw) (unitless) Length of weir(L) ft Driving head(H) ft Pre-development 1-yr,24-hr peak flow ft3/sec Post-development 1-yr,24-hr peak flow ft3/sec Storage volume discharge rate(through discharge orifice or weir) 0.47 ft3/sec Storage volume discharge rate greater than pre-dev.1yr24hr. OK,draws down in 2-5 days. Storage volume drawdown time 211 days Drawdown time varying from expected value by more than a half day. Check calculation. Additional Information Vegetated side slopes 3:1 OK Vegetated shelf slope 6:1 Insufficient shelf slope. Vegetated shelf width 10 0 ft OK Length of fiowpath to width ratio 5:1 OK Length to width ratio 5.0:1 OK Trash rack for overflow&orifice? Y (Y or N) OK Freeboard provided ft Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies Pond will be pumped down by mechanical means if required Form SW4D1-Wet Detention Basin-Rev.5 Parts I.&II.Design Summary,Page 2 of 2 Permit No (to be provided by DWQ W. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent,the agent may initial below. If a requirement has not been met,attach justification. Pagel Plan jitials Sheet No. iC�6 Sit OA 1. Plans(1"-50'or larger)of the entire site showing: -Design at ultimate build-out, -Off-site drainage(if applicable), -Delineated drainage basins(include Rational C coefficient per basin), -Basin dimensions, -Pretreatment system, -High flow bypass system, Maintenance access, -Proposed drainage easement and public right of way(ROW), Overflow device,and Boundaries of drainage easement. i G S.Lf 2.Partial plan(1"=30'or larger)and details for the wet detention basin showing: -Outlet structure with trash rack or similar, Maintenance access, -Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, -Vegetation specification for planting shelf,and -Filter strip. 3. Section view of the wet detention basin(1" 20'or larger)showing: -Side slopes,3:1 or lower, -Pretreatment and treatment areas,and -Inlet and outlet structures. cI.1 4. If the basin is used for sediment and erosion control during construction,clean out of the basin is specified on the plans prior to use as a wet detention basin. 033 See 62/C5 5.A table of elevations,areas,incremental volumes&accumulated volumes for overall pond and for forebay, to verify volume provided. ig°b 6.A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. /t213 5ee-Ce /e j, 7. The supporting calculations. 090 Xitc-bd./f 8.A copy of the signed and notarized operation and maintenance(O&M)agreement. Prey; RAO 9.A copy of the deed restrictions(if required). gdel_ -- '— 10. A soils report that is based upon an actual field investigation,soil borings,and infiltration tests. County soil maps are not an acceptable source of soils information. RECEIVED D5C 1 "2 2008 Form SW401-Wet Detention Basin-Rev.5 Pert I!!.Pnc, ' _ . . ,Page 1 of 1 I 7/2.6(06 W [L e 3 J' - Permit No.csh11 ®OO 740 r(�Cob 1/`0- •, rt. f rcpt.) (to be provided by DWQ) State of North Carolina _0/7`"" Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin supplement for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. I. PROJECT INFORMATION(please complete the following information): Project Name: Myrtle Grove Village Shopping Center(Pond#1) Contact Person: Robert Balland,PE Phone Number: (910)-791-6707 For project with multiple basins, specify which basin this worksheet applies to: DA#1 & Offsite#1 Elevations Basin Bottom Elevation 7.0 ft. (floor of the basin) Permanent Pool Elevation 14.0 ft. (elevation of the orifice) Temporary Pool Elevation 15.6 ft. (elevation of the discharge structure overflow) Area Permanent Pool Surface Area 15,694 sq. ft. (water surface area at the orifice elevation) Drainage Area 11.07 ac. (on-site and off-site drainage to the basin) Impervious Area 7.92 ac. (on-site and off-site drainage to the basin) Volumes Permanent Pool Volume 55,013 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 27,727 cu. ft. (volume detained above the permanent pool) Forebay Volume 12,171 cu. ft. (approximately 20%of total volume) Other parameters SA/DA1 2.98 (surface area to drainage area ratio from DWQ table) Diameter of Orifice 2.0 in. (2 to 5 day temporary pool draw-down required) Design Rainfall 1 in. Design TSS Removal 2 90% % (minimum 85%required) Form: SWU-102 Rev. 3.99 Page 1 of 4 Footnotes: 1 When using the Division SA/DA tables,the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious%and permanent pool depth.Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 The requirement for a vegetative filter may be waived if the wet detention basin is designed to meet 90%TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials �j Pb a. The permanent pool depth is between 3 and 6 feet(required minimum of 3 feet). l2P b. The forebay volume is approximately equal to 20%of the basin volume. `?pa c. The temporary pool controls runoff from the design storm event. 1T Pb d. The temporary pool draws down in 2 to 5 days. e. If required, a 30-foot vegetative filter is provided at the outlet(include non-erosive flow N/,A- calculations) 7/96 f. The basin length to width ratio is greater than 3:1. "hPU g. The basin side slopes above the permanent pool are no steeper than 3:1. IT io6 h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). P4 i. Vegetative cover above the permanent pool elevation is specified. R P8 j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest Po right-of-way. 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use a wet detention basin. `?Pa m. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin,pretreatment including forebays and the vegetated filter if one is provided. This system (check one) (Q) does (®) does not incorporate a vegetated filter at the outlet. This system (check one) (D) does (Z) does not incorporate pretreatment other than a forebay. Form: S WU-102 Rev.3.99 Page 2 of 4 Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately;re-seed as necessary to maintain good vegetative cover,now vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system(i.e. catch basins,piping, swales,riprap, etc.)quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75%of the original design depth(see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality(i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. LY- 1l11lb61/16 When the permanent pool depth reads feet in the main pond,the sediment shall be removed. • When the permanent pool depth reads 75ieet in the fore bay,the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) 14.00 A Permanent Pool Elevation 14.00 Sediment Remov 1. 8.75 ' 5.25 i Sediment Removal Elevation 8.75 5.25 Bottom Elevation 7.00 1.75 Bottom Elevation 7.00 1.75 FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50%of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and fore bay berm. 6. If the basin must be drained for an emergency or to perform maintenance,the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet detention basin system shall be maintained in good working order. Form: SWU-102 Rev. 3.99 Page 3 of 4 Print name: Timothy J. Walter Title: Vice President of Corporate General Partner Address: 201 N. Front Street, Suite 314 Phone: 910-763-762 Signature: Date: August 11, 2 06 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, M a. A. Pitg1i e5& , a Notary Public for the State of 5044. C,Q/4344 County of CIA /1 es4 , do hereby certify that I t1mit5 1 l W4tte-v personally appeared before me this <( day of AIUS T , 20 Oh, and acknowledge the due execution of the foregoing wet detention basin maintenance requirements. Witness my hand and official seal, phi #' �OURy a• __ 9 PUBUG =...... :,..,.... NIm SEAL My commission expires . - U-aD1+ Form: SWU-102 Rev. 3.99 Page 4 of 4 Permit Number: .5I 43 6(stil t-I 0 (to be provided� by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected,repaired or replaced immediately. These deficiencies can affect the integrity of structures,safety of the public,and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ao ❑ does does not incorporate a vegetated filter at the outlet. This system (check one): .-+ ❑ does does not incorporate pretreatment other than a forebay. ou Important maintenance procedures: - Immediately after the wet detention basin is established,the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed,until the plants become established(commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance,the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year,a dam safety expert should inspect the embankment. After the wet detention pond is established,it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element Potential problem: How I will remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully,and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Undog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds,preferably by hand. If pesticide is used,wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead,diseased or Determine the source of the dying. problem: soils,hydrology,disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds,preferably by hand. If pesticide is used,wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails,phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide(do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair.(if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office,or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 5.7 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 5.7 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM ill in the blanks) Permanent Pool Elevation 16.6 Sediment Removal . 10.9 :Ptanen\ol olum Sediment Removal Elevation 10.9Bottom Elevatio Q 0 Min. Sedime Bottom Elevation 9.0 1-ft n. Storage Sediment Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Myrtle Grove Village Shopping Center BMP drainage area number:#2 Print name:Timothy J.Walter Title:Vice-President of Corporate General Partner Address:201 N. Front Street, Suite 314, Wilmington,NC 28401 Phone:910-796-76 4 Signature: Date: (Z— `O g Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. I, bunk(U a , a Notary Public for the State of Aei C x1 County of , do hereby certify that iimalit W i t personally appeared before me this 10 day of /008', and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, '`����ti ti u i u i u rl/IPUGz l/1/ \�� \V i�tissloh F�+ �'• NOTARY N' PU8L1G SEAL MO- a. gezuk My commission expires 3 -2 Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 PARAMOUNTE E N G 1 N E E R 1 N G, MYRTLE GROVE VILLAGE SHOPPING CENTER 5511 Carolina Beach Road New Hanover County,North Carolina DEVELOPED BY: Port City Central Limited Partnership 201 North Front Street Wilmington, North Carolina 28401 MODIFIED STORMWATER MANAGEMENT POND -#2 CALCULATIONS ,•,�pglrrll��� ., ®FESSii l :pp RECEIVED JAN 2 3 2009 y-410Pmitio DWQ PRoa# 5w3_0coo-7 40 Via :Ow,a, P.E.I.PROJECT#: 06130.PE 2+/2C h wl A/vf DESIGNED BY: CHRIS MILLIS,EI CHECKED BY: ROBERT BALLAND,PE DATE: JULY 21,2006 MODIFIED: JANUARY 23,2009 5 9 1 1 D L E A N DER D R 1 4 E , SUITE 2 0 1 , W I L M 1 N (3 T U N , NC 2 9 4 D 3 PH : (9 1 D) 7 9 1 - 6 7 D 7 F A X : ( 9 1 D) 7 9 1 - 6 7 6 D MYRTLE GROVE VILLAGE NEW HANOVER, NORTH CAROLINA Project#06130.PE DESIGN NARRATIVE Port City Central LTD. Partnership is proposing to modify their existing stormwater management permit, SW8 060740 Mod and was issued on March 19, 2007. The request to modify the existing stormwater management permit is for the following reasons: • The permanent pool level increased due to an existing tail water condition, a permanent weir located downstream and to an inaccurate survey data in the area of our outfall. • Off-site #2 is being removed from the permit application due to concerns of meeting pre. Vs. post development for the 25 year storm event as required in the New Hanover County Stormwater ordinance. Off-site area #2 consisted of 9.78 acres with 7.82 acres of impervious area or 80% impervious area, which was previously allocated. The proposed modification will remove this area from the permit application and any new development proposed on that parcel in the future will have to submit an independent stormwater management permit application with NCDENR. Village at Myrtle Grove: Wet Detention Pond #2 Calculations NC DENR Retention Requirements Objective:design a wet detention basin with the following characteristics:a permanent water pool depth between 3-and 6-feet, a surface area that meets TSS removal requirements(values set by NC DENR and included here), a forebay that is approximately 20%of the total pond volume, a temporary water pool sized to detain the initial 1 inch of rainfall runoff, an outlet device that drains the temporary water pool within 2-5 days, and a length-to-width ratio of approximately 3:1. Step 1: Determine the surface area required for 90% TSS removal Post-Development Conditions Total Drainage Area 32.23 ACRE Value from CAD Impervious Drainage Area 24.45 ACRE Value from CAD Impervious Cover 75 9% Impervious Cover-(Impervious Drainage Area)/(Total Drainage Area)*100% Elevation of Permanent Pool Surface 16.6 FT Value selected by designer Depth of Permanent Pool 7.6 Value selected by designer Elevation of Wet Detention Pond Bottom 9.0 FT (Bottom Elevation)=(Permanent Pool Surface Elevation)-(Depth of Permanent Pool) Approximate Pond Length 670 FT Value from CAD Approximate Pond Width 140 FT Value from CAD Length:Width Ratio 5:1 Ratio=(Length)/(Width):1 Required SA/DA Ratio for 90%TSS Removal 2.60 Value from chart. Reference: "90% TSS Removal Required Permanent Pool Surface Area 36,432 SF Required Surface Area=(Required SA/DA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area 86,830 SF Interpolated value from stage-storage calculations Step 2: Determine the 1-inch runoff elevation within the wet detention pond. Runoff Coefficient, Rv 0.733 IN/IN Rv=0.05+0.009*(%Impervious) 1"Runoff Volume(Temporary Volume) 85,728 CF 1"Runoff Volume=1 inch*Rv*1 foot/12 inch*(rota! Drainage Area) Volume Below Permanent Pool 535,207 CF Value from stage-storage calculations(cumulative pond volume at permanent pool elevation) Storage Elevation at Required Volume 17.59 FT Value is interpolation based upon stage-storage values. See stage-storage calculations e JAN 2 2 2°°o I/CJG (A)g pY. P:1Projects\ZIFF Properties106130.PE Village at Myrtle Grove\Documents\Design Calculations\HydrolStormwater Calcs1WET POND#2 Rev 112508 Mod 011909 Step 3: Calculate the required forebay volume(18-22%of total pond volume)and compare to the forebay volume provided. Total Pond Volume 535,207 CF Value from stage-storage calculations Required Total Forebay Volume 107,041 CF Forebay Volume=(Total Pond Volume)*20% Provided Total Forebay Volume 119,662 CF Value from stage-storage calculations Provided Forebay Volume:T otal Pond Volume 22% (Provided Forebay Volume)/(Total Pond Volume)*100% Required Forebay#1 Volume(52%of Total DA) 55,662 Forebay#1 Volume=(Total Pond Volume)*10.4% Provided Forebay#1 Volume(52%of Total DA) 71,861 Value from stage-storage calculations Required Forebay#2 Volume(48%of Total DA) 51,380 Forebay#2 Volume=(Total Pond Volume)*9.6% Provided Forebay#2 Volume(48%of Total DA) 47,801 Value from stage-storage calculations Step 4: Verify that time required to drawdown the 1-inch runoff volume is within 2 to 5 days. Diameter of Proposed Low-flow Orifice 4.00 IN Value chosen by designer Elevation of Outlet Structure 20.35 FT Value chosen by designer Total Elevation Head Above Orifice 3.75 FT (Total Elevation Head Above Orifice)=(Weir Elevation)-(Elevation of Permanent Pool Surface) (Average Elevation Head Above Orifice)=[(Storage Average Elevation Head Above Orifice 1.25 FT Elevation at Required Volume)+(Elevation of Permanent Pool Surface11/3-(Storage Elevation at Required Volume) Cd, Coefficient of Discharge 0.60 Value chosen by designer Q, Flowrate Through Low-flow Orifice 0.47 CFS Q=Cd*(Pi)*((Diameter of Orifice)*(1 ft/12 in)]^2/4*(2*32.2*(Avenge Head)1^1/2 Drawdown Time for 1-inch Runoff 2.11 DAYS (Drawdown Time)=(1"Runoff Volume)/Q*(1 day/86400 seconds) P:1Projects\ZlFF Properties106130.PE Village at Myrtle Grove\DocumentslDesign Calculations\Hydro\Stormwater Calcs1WET POND#2 Rev 112508 Mod 011909 Village at Myrtle Grove Stage-Storage Calculations for Proposed Wet Detention Pond#2 determine the storage capacity and characteristics of the proposed wet detention pond. Pond side slope above Permanent Pool 3 Planted shelf 2'below Permanent Pool 6 Side Slope below planted shelf 3 incremental and cumulative storage of the wet detention pond per contour interval. Stage/Storage Above Permanent Pool (Including Forebay) Cumulative Contour Incremental Volume, S Contour Area(SF) Volume(CF) (CF) 16.6 86,830 0 0 •-Permanent Pool 17.0 91,923 35,751 35,751 18.0 97,112 94,518 130,268 19.0 102,323 99,718 229,986 20.0 108,100 105,212 335,197 21.0 113,842 110,971 446,168 22.0 120,085 116,964 563,132 Stage/Storage Total Pond(Including Forebay) Cumulative Contour Incremental Volume, S Contour Area(SF) Volume (CF) (CF) 9.0 55,912 0 0 +Pond Bottom 10.0 59,544 57,728 57,728 11.0 63,220 61,382 119,110 12.0 66,927 65,074 184,184 13.0 70,652 68,790 252,973 14.0 74,461 72,557 325,530 15.0 78,420 76,441 401,970 16.0 84,973 81,697 483,667 16.6 86,830 51,541 535,207 Permanent Pool 17.0 91,923 35,751 570,958 18.0 97,112 94,518 665,476 19.0 102,323 99,718 765,193 20.0 108,100 105,212 870,405 21.0 113,842 110,971 981,376 22.0 120,085 116,964 1,098,339 P:1Projects\ZIFF Properties106130.PE Village at Myrtle Grove\Documents\Design Calculations\Hydro\Stormwater Calcs\WET POND#2 Rev 112508 Mod 011909 Village at Myrtle Grove Stage-Storage Calculations for Proposed Wet Detention Pond#2 Forebay#1 (10.4%of Total Pond) Cumulative Contour Incremental Volume, S Contour Area(SF) Volume(CF) (CF) 9.0 7,338 0 0 +•Bottom Elev. 10.0 7,863 7,601 7,601 11.0 8,403 8,133 15,734 12.0 8,956 8,680 24,413 13.0 9,525 9,241 33,654 14.0 10,107 9,816 43,470 15.0 10,704 10,406 53,875 16.0 11,315 11,010 64,885 16.6 11,940 6,977 71,861 4-Forebay Volume Forebay#2(9.6% of Total Pond) Cumulative Contour Incremental Volume, S Contour Area(SF) Volume(CF) (CF) 9.0 4,090 0 0 +•Bottom Elev. 10.0 4,617 4,354 4,354 11.0 5,176 4,897 9,250 12.0 5,750 5,463 14,713 13.0 6,342 6,046 20,759 14.0 6,953 6,648 27,407 15.0 7,608 7,281 34,687 16.0 8,336 7,972 42,659 16.6 8,804 5,142 47,801 •forebay Volume 1.0"Temporary Storage Calculations Cumulative Contour Incremental Volume, S Contour Area(SF) Volume(CF) (CF) 16.6 86,830 0 0 Permanent Pool 17.0 91,923 35,751 35,751 17.6 94,722 55,994 91,744 +1"Volume 18.0 97,112 38,367 130,111 19.0 102,323 99,718 229,828 20.0 108,100 105,212 335,040 20.35 109,831 38,138 373,178 +Temporary Pool P:1Projects\ZIFF Properties106130.PE Village at Myrtle Grove\Documents\Design Calculations\Hydro\Stormwater Calcs\WET POND#2 Rev 112508 Mod 011909 _ _.... . _ __ _ . . _... . .._ . Rk! RIN 6 , 1 .N. Q . I MYRTLE GROVE VILLAGE SHOPPING CENTER 5511 Carolina Beach Road New Hanover County, North Carolina DEVELOPED BY: Port City Central Limited Partnership 201 North Front Street Wilmington, North Carolina 28401 STORM DRAINAGE REPORT & CALCULATIONS 0-44. p�OfESs/O (!% , ti sEA - 1 IA( t '-4 ' s . Mix. 1 �'�..4 1NE ,, a' �fl , t *: p. BOIS -V•Y\\svAiro(00 ,,,'"' t i• • cg)kA 51-1-6 ----' tP -1A4 'it P.E.I.PROJECT#: 06130.PE •-l� V4' 4Jr DESIGNED BY: CHRIS MILLIS,EI rb 4. OA CHECKED BY: Q' ROBERT BALLAND,PE 0.-/ 16DATE: JULY 21,2006 j ``� (tw rik: r 5 9 1 1 D L E A N D E R D R € V E , SUITE 2 0 , s W € L M € N 3 T O N . N C 2 9 4 D 3 PHI € 9 1 O ) 7 9 1 - 6 7 07 FAX ; 19 1 O I 7 9 1 - 67 6 0 MYRTLE GROVE VILLAGE NEW HANOVER, NORTH CAROLINA Project#06130.PE DESIGN NARRATIVE Port City Central LTD. Partnership is proposing to redevelop the old Myrtle Grove Wal-mart shopping center located near the intersection of U.S. 421 &Piner Rd.for a Home Depot site and additional commercial/retail development. The parcel to be developed is 52.2 acres (Deed Book:4912,Page: 1420) and is located in New Hanover County's jurisdiction. The existing site consists of approximately 12 acres of fairly wooded cover on moderately sloped terrain with the remainder as predominately impervious cover as a result of the parking/buildings from the previous shopping center. The stormwater management system for the previous development was permitted by the State under permit#SW8 880518. The existing soils on the site are comprised of Leon (Le), Lynn Haven (Ly), Kureb (Kr), and Murville (Mu) according to the Soil Survey of New Hanover County; data from New Hanover County G.I.S. The project is within a drainage basin that drains to an unnamed tributary of Motts Creek (C; SW, 1.0" runoff). All stormwater will be conveyed through a storm drainage system into two wet detention ponds. Both ponds currently serve the existing shopping center and will be reconstructed to accommodate for the proposed development. To model the stormwater management system the SCS TR-55 (NRCS) method was used. The site was modeled back to its original state (before the Wal-mart shopping center) for the pre- development model. Since the majority of the property is currently developed, characteristics of the undeveloped southern portion of the parcel were used for analysis; which includes moderately sloped terrain and fairly wooded cover. The hydraulic soils group for the parcel was arrived at by delineating each soil type in CAD via information from New Hanover County G.I.S. and assigning it a correct classification per TR-55. The project has been delineated for stormwater management into three onsite and two offsite drainage areas (See sheet C4.0A). Pond #1 is the northern most pond on the property(near the proposed Home Depot site); this wet detention pond will store and treat the stormwater from DA #1 and Offsite DA #1. Within DA#1 there are three out-parcels. One out parcel is the u. %nsZl .� proposed Home Depot development; 2.67 acres of the Home Depot out parcel lies within DA ''tt �. Y { #1 with 2.16 acres consisting of impervious surfaces. In addition are two other out parcels 9 ?0 ilP (labeled Out Parcel A & B) for future development which have been accounted for in and #1 5 4-, or{ /}s 6 by assuming 90% BUA (1.24 acres of impervious). The three out parcels combined result in a total of 148,103 sf of out parcel impervious area which is accounted for in Pond#1. Pond #2, located near the southern property boundary, will store and treat the stormwater from DA #2 and Offsite DA #2. Offsite DA #2 is currently non-existent but considered for future development; 80% BUA within Offsite DA #2 has been accounted for in Pond #2 (7.82 acres of impervious). Pond #2 will also store and treat a portion of the Home Depot out parcel (7.70 acres with 6.95 acres of impervious surfaces). There is no proposed development to occur in DA#3,therefore it is not accounted for in the stormwater management system. f �' '� X� ,;_ r �?Arc 7._ z` PROPOSED IMP 1 OVEMENTS/ STORMWATER 942 Both wet detention ponds have been designed to meet the New Hanover County Storm {Wad ��3 1yr Management Ordinance and NCDENR's design requirements. Pond#1 will outlet through a riser-barrel structure in to a proposed storm drain manhole tied to an existing 66" culvert which currently serves as the existing pond outfall. The outlet structure has been designed to hold back the first inch of runoff for the required 2-5 day drawdown and discharge the 25 year storm event at a flow rate less than pre-development. The 100 year storm event will also discharge through outlet structure since there is no means for an emergency spillway,but this event is held within the pond while maintaining more than 0.5 feet of freeboard from the top of bank. Pond#2 will outlet through a riser-barrel structure to an existing stormwater drainage ditch The outlet structure has been designed to hold back the first inch of runoff for the required 2-5 day drawdown and discharge the 25 year storm event at a flow rate less than pre-development. The 100 year storm event will discharge through the principal and emergency spillways while maintaining 0.5 feet of freeboard. All design calculations can be found in the following pages of this report. NEW HANOVER COUNTY SOILS MAP TH CAROUNA -- SHEET NUMBER 25 USGS MAP STORMWATER CALCULATIONS Project Name: Village at Myrtle Grove Client: Ziff I) Project Number: 06130.PE IP\ �;1'1,.■,�yµl 6' N p 1 N C 6 q 1 N. I, '. Prepared By: CWM N . Date: 6/28/2006 Basin: DA #1 [POST] Drainage area= 6.04 acres = 0.009 mi2 Area Calculations Land Use Area (Ac.) % of Basin Pavement/ Buildings 3.08 Out Parcels (90% BUA) 1.24 Impervious (Total) = 4.32 71.5% Open Space - Good 1.72 28.5% Sum: 6.04 100% Basin: DA#2 [POST] Drainage area= 32.23 acres = 0.050 mil Area Calculations Land Use Area (Ac.) % of Basin Impervious (Total) = 24.45 75.90%0 Open Space - Good 7.78 24.1% Sum: 32.23 100% Basin: OFFSITE #1 [POST] Drainage area= 5.03 acres = 0.008 mi2 Area Calculations Land Use Area (Ac.) % of Basin Impervious (Total) = 3.60 71.6% Open Space - Good 1.43 28.4% Sum: 5.03 100% Basin: OFFSITE #2 [POST] Drainage area= 9.78 acres = 0.015 mil Area Calculations Land Use Area (Ac.) % of Basin Impervious (Total) = 7.82 80.0% Open Space - Good 1.96 20.0% Sum: 9.78 100% Basin: DA#3 [POST] Drainage area= 2.42 acres = 0.004 mil Area Calculations Land Use Area (Ac.) 0/0 of Basin Wooded - Fair 2.42 100.0% Sum: 2.42 100% Village at Myrtle Grove: Wet Detention Pond#1 Calculations NC DENR Retention Requirements Objective:design a wet detention basin with the following characteristics:a permanent water pool depth between 3-and 6-feet, a surface area that meets TSS removal requirements(values set by NC DENR and included here), a forebay that is approximately 20%of the total pond volume, a temporary water pool sized to detain the initial 1 inch of rainfall runoff, an outlet device that drains the temporary water pool within 2-5 days, and a length-to-width ratio of approximately 3:1. Step 1: Determine the surface area required for 90% TSS removal Post-Development Conditions Total Drainage Area 11.07 ACRE Value from CAD Impervious Drainage Area 7.92 ACRE Value from CAD Impervious Cover 71.5% impervious Cover--(Impervious Drainage Area)/(Total Drainage Area)*100% Elevation of Permanent Pool Surface 14.0 FT Value selected by designer Depth of Permanent Pool 7.0 FT Value selected by designer Elevation of Wet Detention Pond Bottom 7.0 FT (Bottom Elevation)=(Permanent Pool Surface Elevation)-(Depth of Permanent Pool) Approximate Pond Length 226 FT Value from CAD Approximate Pond Width 82 FT Value from CAD Length:Width Ratio 3:1 Ratio=(Length)/(Width):1 Required SA/DA Ratio for 90%TSS Removal 2.98 Value from chart. Reference: "90% TSS Removal Required Permanent Pool Surface Area 14,357 SF Required Surface Area=(Required SA/DA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area 15,694 SF Interpolated value from stage-storage calculations Step 2: Determine the 1-inch runoff elevation within the wet detention pond. Runoff Coefficient, Rv 0.694 IN/IN Rv=0.05+0.009*(%Impervious) Required 1"Runoff Volume(Volume of Temporary 27 884 CF 1"Runoff Volume=1 inch*Rv*1 foot/12 Pool) inch*(Total Drainage Area) Value from stage-storage calculations Volume Below Permanent Pool 55,013 CF (cumulative pond volume at permanent pool elevation) Total Volume to be Controlled 82,897 CF Total Volume to be Controlled=(Volume Below Permanent Pool)+(1"Runoff Volume) Storage Elevation at Required Volume 15.60 FT Value is interpolation based upon stage-storage values. See stage-storage calculations P:\Projects\zIFF Properties106130.PE Village at Myrtle Grove\Documents\Design Calculations\Hydro\Stormwater CalcslWET POND#1 Step 3: Calculate the required forebay volume(18-22%of total pond volume)and compare to the forebay volume provided. Total Pond Volume 55,013 CF Value from stage-storage calculations Required Forebay Volume 11,003 CF Forebay Volume=(Total Pond Volume)*20% Provided Forebay Volume 12,171 CF Value from stage-storage calculations Provided Forebay Volume:Total Pond Volume 22% (Provided Forebay Volume)/(Total Pond Volume)*100% Step 4: Verify that time required to drawdown the 1-inch runoff volume is within 2 to 5 days. Diameter of Proposed Low-flow Orifice 2.00 IN Value chosen by designer Elevation of Outlet Structure 14.00 FT Value chosen by designer (Total Elevation Head Above Orifice)=(Weir Total Elevation Head Above Orifice 1.60 FT Elevation)-(Elevation of Permanent Pool Surface) (Average Elevation Head Above Office)=((Storage Elevation at Required Average Elevation Head Above Orifice 0.80 FT Volume)+(Elevation of Permanent Pool Surface)J/2-(Storage Elevation at Required Volume) Cd,Coefficient of Discharge 0.60 Value chosen by designer Q, Flowrate Through Low-flow Orifice 0.09 CFS Q=Cd*(Pi)*((Diameter of Orifice)*(1 ft/12 in)J^2/412*32.2*(Avenge Head)J^1/2 Drawdown Time for 1-inch Runoff 3.44 DAYS (Drawdown Time)=(1"Runoff Volume)/Q*(1 day/86400 seconds) P:1Projects\ZIFF Properties106130.PE Village at Myrtle GrovelDocuments\Design Calculations\Hydro1Stormwater Calcs\WET POND#1 Village at Myrtle Grove Stage-Storage Calculations for Proposed Wet Detention Pond #1 determine the storage capacity and characteristics of the proposed wet detention pond. Pond side slope above Permanent Pool 3 Planted shelf 2'below Permanent Pool 6 Side Slope below planted shelf 3 incremental and cumulative storage of the wet detention pond per contour interval. Stage/Storage Above Permanent Pool (Including Forebay) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 14.0 15,694 0 I 0 I• Permanent Pool 15.0 17,776 16,735 16,735 16.0 19,588 18,682 35,417 17.0 21,455 20,522 55,939 18.0 23,380 22,418 78,356 19.0 25,361 24,371 102,727 20.0 27,399 26,380 129,107 21.0 29,493 28,446 157,553 22.0 31,644 30,569 188,121 23.0 33,851 32,748 220,869 P:\ProjectslZIFF Properties106130.PE Village at Myrtle GrovelDocumentslDesian Calculations1Hydro\Stormwater Calcs\WET POND#1 Village at Myrtle Grove Stage-Storage Calculations for Proposed Wet Detention Pond #1 Stage/Storage Total Pond (Including Forebay) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 7.0 2,964 0 0 +-Pond Bottom 8.0 3,989 3,477 3,477 9.0 5,174 4,582 8,058 10.0 6,501 5,838 13,896 11.0 7,970 7,236 21,131 12.0 9,581 8,776 29,907 13.0 12,469 11,025 40,932 14.0 15,694 14,082 55,013 -Permanent Pool 15.0 17,776 16,735 71,748 15.6 18,844 10,986 82,734 -•Outlet Ely. 16.0 19,588 7,686 90,420 17.0 21,455 20,522 110,942 18.0 23,380 22,418 133,359 19.0 25,361 24,371 157,730 20.0 27,399 26,380 184,110 21.0 29,493 28,446 212,556 22.0 31,644 30,569 243,124 23.0 33,851 32,748 275,872 Forebay Only(20% of Total Pond) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 7.0 184 0 0 8.0 475 330 330 +-Bottom Elev. 9.0 860 668 997 10.0 1,320 1,090 2,087 11.0 1,855 1,588 3,675 12.0 2,465 2,160 5,835 13.0 3,150 2,808 8,642 14.0 3,907 3,529 12,171 +-Forebay Volume P:\Projects\ZIFF Properties106130.PE Village at Myrtle Grove\Documents\Design Caicuiations\Hydro\Stormwater Calcs\WET POND#1 Pond Report Hydraflow Hydrographs by Intelisolve Wednesday,Jun 28 2006,3:16 PM Pond No. 2 - POND#1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage/Storage Table Stage(ft) Elevation(ft) Contour area(soft) Incr.Storage(cuft) Total storage(cuft) 0.00 7.00 2,964 0 0 1.00 8.00 3,989 3,477 3,477 2.00 9.00 5,174 4,582 8,058 3.00 10.00 6,501 5,838 13,896 4.00 11.00 7,990 7,246 21,141 5.00 12.00 9,581 8,786 29,927 6.00 13.00 12,469 11,025 40,952 7.00 14.00 15,694 14,082 55,033 8.00 15.00 17,776 16,735 71,768 9.00 16.00 19,588 18,682 90,450 10.00 17.00 21,455 20,522 110,972 11.00 18.00 23,380 22,418 133,389 12.00 19.00 25,361 24,371 157,760 13.00 20.00 27,399 26,380 184,140 14.00 21.00 29,493 28,446 212,586 15.00 22.00 31,644 30,569 243,154 16.00 23.00 33,851 32,748 275,902 Culvert/Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise(in) = 24.00 2.00 0.00 0.00 Crest Len(ft) = 16.00 0.00 0.00 0.00 Span(In) - 24.00 2.00 0.00 0.00 Crest El.(ft) = 15.60 0.00 0.00 0.00 No.Barrels 1 1 0 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert El.(ft) - 13.00 14.00 0.00 0.00 Weir Type = Riser -- - Length(ft) = 92.00 0.00 0.00 0.00 Multi-Stage = Yes No No No Slope(%) = 0.80 0.00 0.00 0.00 N-Value = .013 .013 .000 .000 Orif.Coeff. = 0.60 0.60 0.00 0.00 Multi-Stage = n/a No No No Exfiltration= 0.000 in/hr(Contour) Tailwater Elev. 0.00 ft Note:Culvert/Orifice outflows have been analyzed under inlet and outlet control. Weir riser checked for orifice conditions, Stage/Storage/Discharge Table Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 7.00 0.00 0.00 --- - 0.00 --- 1.00 3,477 8.00 0.00 0.00 - -- 0.00 -- -- -- 0.00 2.00 8,058 9.00 0.00 0.00 -- - 0.00 - 0.00 3.00 13,896 10.00 0.00 0.00 -- - 0.00 -- __ ___ 0.00 4.00 21,141 11.00 0.00 0.00 - -- 0.00 - __ 0.00 5.00 29,927 12.00 0.00 0.00 - --- 0.00 ___ 0.00 6.00 40,952 13.00 0.00 0.00 - -- 0.00 __ - 0.00 7.00 55,033 14.00 0.00 0.00 -- - 0.00 _ - 0.00 8.00 71,768 15.00 0.00 0.10 -- - 0.00 - - - 0.001 9.00 90,450 16.00 13.50 0.15 13.48 - - 3.62 --- -- 10.00 110,972 17.00 25.52 0.18 - - 25.51 _ - -- - 25. 9 11.00 133,389 18.00 29.95 0.21 --- --- 29.93 - - - 30.140. 4 12.00 157,760 19.00 33.73 0.23 --- - 33.70 - - 13.00 184,140 20.00 36.97 0.26 -- - 36.94 --- --- 37.20 14.00 212,586 21.00 39.93 0.28 - 39.90 - - - 37.2040.17 15.00 243,154 22.00 42.69 0.30 - --- 42.69 --- - - --" 9 16.00 275,902 23.00 45.28 0.31 - - 45.26 - - - 45. 7 -- --- 45.57 9UE N G , I N C_ 5 9 1 1 OLEANDER D RIVE , SUITE 2 0 1 W I L M I N G T O N , NC 28403 y� 9 1 0 - 7 9 1 - 6 7 0 7 ( it ) 9 1 0 - 7 9 1 - 6 7 66 0 ( IT ) LETTER OF TRANSMITTAL To: NCDENR Date 01/21/09 127 Cardinal Drive Extension Wilmington, NC 28403 Re: Myrtle Grove Village—Pond#2 NCDENR Permit Modification Attn: Linda Lewis Project No. 06130.PE IWe are sending:I ❑ Originals ❑Prints ❑Shop Drawings ® Calculations The following items: ❑ Correspondence ❑ Plans ❑ Specifications ® Other as listed below Quantity Date Dwg.No. Description 2 1/19/09 Wet Detention Basin Supplement 2 Wet Detention Pond#2 Calculations 1 1/19/09 Comment&Response Letter RECV JM� J 4 2009 Issue Status: ®For Approval ❑As Requested ❑ Construction ❑Bid ❑For Your Use ❑ For Review and Comment El Approved as Noted ❑ See Remarks 'Action Taken: ❑ No Exceptions Taken ❑ Make Corrections Noted ❑ Amend&Resubmit ❑ Rejected-See Remarks ❑ Approved as Submitted ❑ Other 'Remarks: RECEIVED IVED JAN 2 2 2009 BY: Cc: Signed: Robert P. Balland, P.E. pARPI _M_UUNT E N MEEK I N G, I NI C_ January 19,2009 JAN 2 2 2009 BY: Ms. Linda Lewis NCDENR-Division of Water Quality 127 Cardinal Drive Ext. Wilmington,NC 28403 RE: Myrtle Grove Village Phase II Stormwater Application Review(No. SW8 060740 Mod) Dear Ms. Lewis: On behalf of Port City Limited Partnership,we are submitting a response to your letter, dated January 16,2009,for further review and approval for the above referenced project. The comments from your letter are listed below with our responses in bold. 1. The contour areas listed in the"Stage/Storage Above Permanent Pool" table do not match up with the contour areas listed below it in the"Stage/Storage Total Pond" table. Please correct the areas and revise the volumes. • The contour areas have been reviewed and the calculations have been corrected. 2. The contour area reported at elevation 17 in the Stage/Storage Total Pond table is LESS than the contour area report at elevation 16.6. How is that possible? • The contour area has been reviewed and the calculations have been corrected. 3. Since no outlet has been provided at the specified 1" volume storage elevation of 17.6,the temporary pool elevation to report on the supplement must be the next available outlet above the permanent pool,or 20.35. The temporary pool volume provided to report on the supplement would then become the volume in the pond between the permanent pool elevation and elevation 20.35. Please see the attached drawing for explanation and revise the supplement accordingly. • The temporary pool volume has been revised and the volume has been updated on the supplement. 4. For projects permitted prior to July 1,2007,the average head is calculated as l the distance from the temporary pool elevation of 20.35 to the centerline of the 5 9 1 1 OLEANDER D R I V E , S T E . 2 0 1 , W I L M I N G T D N , NC 28403 PH : ( 9 1 D ) 7 9 1 - R 7 ❑ 7 F A X : ( 9 1 D) 7 4 1 - 6 7 6 D proposed 4" orifice,which results in an average head of 1.79 feet. The larger driving head will increase the flow rate and reduce the drawdown time to less than 2 days. ■ The average head was revised as stated below and the time to drawdown the 1-inch volume is 2.11 days. This was calculated using an elevation head between elevation 20.35 and elevation 16.6 or 3.75 feet. The average driving head was then calculated as H/3 or 1.25 feet. 5. Please note that a revision to one number may have a domino effect on other numbers,which may require revision of the applications,calculations, supplements,plans, details,and associated documentation. Please verify all numbers are correct to ensure consistency in the application documents. ■ The calculations and the Wet Detention Basin Supplement have been revised based on the changes noted above. Thank you for your attention to this matter. If you have any questions regarding any of this information or require additional material,please feel free to call. Sincerely, Paramounte Engineering,Inc. f31 _ Robert P. Balland,PE 5 9 1 1 OLEANDER D R I V E , 9 T E . 2 0 1 . W ) L M ) N G T O N . NC ? B 4 0 3 PH : (9 1 0) 7 9 1 - 6 7 0 7 F A X : ( 9 1 O) 79 1 - 6 7 6 0 Re: SW8 060740 Mod.Myrtle Grove Village Subject: Re: SW8 060740 Mod. Myrtle Grove Village From: Linda Lewis<linda.lewis@ncmail.net> Date: Tue, 20 Jan 2009 08:22:10 -0500 To: rballand<rballand@paramounte-eng.com> Robert: I've attached a pdf that describes this situation. What you need to do is to drawdown the 1" volume at the average driving head measured from 20.35 down to the centerline of the orifice, OR, add an outlet in the outlet structure at 17.6 and using the same method, drawdown the 1" volume at the average driving head measured from 17.6 to the centerline of the orifice. New ponds designed today will use an average head of 1/3 the distance between the storage elevation and the centerline of the orifice however, since this pond was previously permitted using 1/2 of the driving head, you have the option of using either driving head. The rules have always required only the 1" volume to drawdown in 2-5 days. It is only within the last few years that more local government regulations have required the State water quality ponds to act as flood control ponds and store additional volume, so we started seeing ponds with temporary pool volumes well in excess of the minimums calculated per the State. You have to assume that the pond will fill up completely to the specified outlet elevation (20.35 in in this case) to size the orifice. You also have the option to create an outlet at 17.6, and recalculate the orifice using the 1" volume, but under the smaller driving head. Linda rballand wrote: Linda: I have a question regarding comment #4 . If I increase the temporary pool from El. 17 . 60 to El . 20 .35, the time to drawdown the pond is 7 .52 Days. I agree that when you increase the driving head, the flow rate through the low flow orifice will increase; however, the volume from El. 17 . 60 to El. 20 .35 is greater than four times the design volume. Therefore, the drawdown time is much greater. Did the rules prior to July 1, 2007 state the time to drawdown the temporary volume or in our case the 1-inch volume, should occur between 2-5 days? If we have to add the increased volume, we will need to add another 4-inch orifice to control the volume. If I add another orifice, I then have issues meeting the 25 year pre vs. post. Also, if we add another 4-inch orifice, the low volume storm events like the first 1-inch, will release more water and not meet the intent of the first flush. Regards, Robert P. Balland, P.E. , LEED AP 1 of 2 1/20/2009 8:42 AM Re:SW8 060740 Mod.Myrtle Grove Village PARAMOUNTE ENGINEERING, INC. 5911 Oleander Drive, Suite 201 Wilmington, NC 28403 910-791-6707 (P) 910-791-6760 (F) 910-619-1186 (M) rballand@paramounte-eng.com www.paramounte-eng.com Original Message From: Linda Lewis [mailto: linda. lewis@ncmail.net] Sent: Friday, January 16, 2009 5 :21 PM To: rballand Subject: SW8 060740 Mod. Myrtle Grove Village Robert : My review comments are attached. Linda Content-Type: application/pdf Average Head & Drawdown Calculation.pdf Content-Encoding: base64 2 of 2 1/20/2009 8:42 AM o�, GoF W 4 rERP Beverly Eaves Perdue,Governor Dee Freeman,Secretary rNorth Carolina Department of Environment and Natural Resources l7 < Coleen H.Sullins,Director Division of Water Quality January 16, 2009 Timothy J. Walter, Vice President 701 East Bay, Inc. General Partner Port City Limited.Partnership 201 N. Front Street, Suite 314 Wilmington, NC 28401 Subject: Request for Additional Information Stormwater Project No. SW8 060740 Mod. Myrtle Grove Village Shopping Center New Hanover County Dear Mr. Walter: The Wilmington Regional Office received a modified State Stormwater Management Permit Application for Myrtle Grove Village Shopping Center on December 12, 2008. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. The contour areas listed in the "Stage/Storage Above Permanent Pool" table do not match up with the contour areas listed below it in the "Stage/Storage Total Pond" table. Please correct the areas and revise the volumes. 2. The contour area reported at elevation 17 in the Stage/Storage Total Pond table is LESS than the contour area reported at elevation 16.6. How is that possible? 3. Since no outlet has been provided at the specified 1" volume storage elevation of 17.6, the temporary pool elevation to report on the supplement must be the next available outlet above the permanent pool, or 20.35. The temporary pool volume provided to report on the supplement would then become the volume in the pond between the permanent pool elevation and elevation 20.35. Please see the attached drawing for explanation and revise the supplement accordingly. • 4. For projects permitted prior to July 1, 2007, the average head is calculated as % of the distance from the temporary pool elevation of 20.35 to the centerline of the proposed 4" orifice, which results in an average head of 1.79 feet. The larger driving head will increase the flowrate and reduce the drawdown time to less than 2 days. 5. Please note that a revision to one number may have a domino effect on other numbers, which may require revision of the applications, calculations, supplements, plans, details, and associated documentation. Please verify all numbers are correct to ensure consistency in the application documents. Mailing Address Phone(910)796-7215 Internet: www.ncwatereualitv.org N�n Carolina 127 Cardinal Drive Extension Fax (910)350-2004 Customer Service 1-877-623-6748 Naturally Wilmington,NC 28405 An Equal Opportunity/Affirmative Action Employer—50%Recycled/10%Post Consumer Paper Mr. Walter January 16, 2009 Stormwater Application No. SW8 060740 Mod. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to February 16, 2009, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement,action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at Linda.lewisAncmail.net. Sincerely, Linda Lewis Environmental Engineer III GDS/arl: S:\WQS\STORMWATER\ADDINFO\20091060740mod.jan09 CC: Robert Balland, P.E., Paramounte Engineering Linda Lewis Page 2 of 2 • • pr733Do ooDD D7399 o 0 0 -0 0 11 II II CNOOO 11 —ci< -. OO ..� 4 5' O , � p � i01 . $. a X co X X st ? Dm D.1. 7 !'J N (p g�g -.- to � 3 w � o 4, a0 a► 0 II 10 . no `< `< d a3 a► a) 73 o ? E 7 f�. d 3 1V to 3 N ? O O ID = ig 3 13 C• .•► 0 0 ^4 s^�•< II N • a) �D CO a) 7 a' " 5. p • . • 0 • . p • • • vn in II N %' = = a) ONO 0- O co „ter •II 11 N a (p • 00 < c n17. y:�:° \^ cm �; E } • , Oaf u) �• -.li •q v N acOD `-z6 n u ww 3 c 0 o 1- # � ~o7owwc� D 0 cn � W� a7l60 I P: a °F3 i D '. ■ 3 in w H II II S O- N c Oa" a5 s+ 7 a) , C = = 0• c Dam ooa • .� -, u 0 morn 1 y CD ca. m 01 0, 05 o au,,� ., u r' > 71• ' vv m co m co CD � � w � � I •I o0 00 n � • 1 II II CDD 0 ) 03 N Fe Fe 0 0CCO"0 ON < � II N rtc2 � . ('D W =.-...-. N i.N N CD O O O� 3 7; _91 G. :-I • • O •• .44511913221 II II © NN w C N II II X O 7 O 3 00 ' a3 !n o • Z � •-pp), N N* * N O 010as •may, 1 `a o 0 • ODtWi1 - a DODlSIaI � � C -� • O O O 27.m m � s a o � � 0 oty, 03 i 1 11 f0/1 Col in tr, II II m N CD, C O O C W r o m(17 Z 0al O 3 A70Do a ' � D D7300 c oc» r7 II II 11 < OD010r0 II 01 ..Na) Di cn N 5. ^^ x o X X "i p_ O I)) a) C 3 `�,/► CO z 'AAxi � ikO fD D 0. a .< .< 0 a) 0 m a Co0 . C71N0 II cl trioD 2mm = „�. � 0- m 0 ' ? R. NI3it3Nto S3SO 0 Iiv m 3 .8 E. a t c 70 a) R �C II jV • CD N CO <D Q '-' '. O 0 0 in cn it M DJ ro=Th p) ONO O ,-,• S II „94 Q. .+ C u II ••- au u00 < N ;�?;� CD 3 O � � y IV 0) % * 2 N p• 8" t7D ii II II � (D 3 < c 03 ram' •. , ,� '•• •• .. .� • 01 aW OON •N a) Is0 ? [Ni101\ <71 - s9. 3 f71 o I •.I . O rn a 0 a D 0 ? D +N 5 Nsn '� � un � c0 -Ncaa . I off. < Ili• • I A3 � cc 0 0cD0_ CDa63a0_ 0 � 0 0nm1 .•S • O• a1 a. a) 0) OODc�11� = '0 in• 0 CD...01 oa � � � A vi -A rD • / • w to a m •A ,� II O W a1 a Q C �: vv m g ^^ ,DO. c�i aNN � � m 0 I+ cm tl 11 (3D �� N R R 8 a 0! f�J c co< a. > I Q NN cp O Oa 03 - 3_ A) .o M �� P w n) c.71 t ' 0 0 11 i1 ; vg s o 00 [3j I II II IV N O a �•D -0) II 0 � Z � N • .• .. a * * O 0 ��vpp a k Ow tbaa. 3 tiO n "D� • 0 I 1' � � v II I1 al mc1i o a m .9 � l? O Z a1 D 71 7 , .i . 1.0 N c.i ; 0 0 it ii 0 't(ja j V� SW8 060740 Mod.Myrtle Grove Village Subject: SW8 060740 Mod. Myrtle Grove Village From: Linda Lewis<linda.lewis@ncmail.net> Date: Fri, 16 Jan 2009 17:20:53 -0500 To: Robert Balland<rballand@paramounte-eng.com> Robert: My review comments are attached. Linda Content-Type: application/msword 060740mod.jan09.doc Content-Encoding: base64 1 of 1 1/16/2009 5:27 PM PARAMOUNTE 51014° E N G I NJ E E R I N G , I NI C, 5 9 1 1 OLEANDER DRIVE , SUITE 2 0 1 W I L M I N G T O N , NC 28403 9 1. 0 - 7 9 .1 - 6 7 0 7 ( 0 ) 9 1 0 - 7 9 1 - 6 7 6 0 ( F ) LETTER OF T R A N S M I T T A L To: NCDENR Date 112/11/08 127 Cardinal Drive Extension Wilmington, NC 28403 Re: Myrtle Grove Village— Pond#2 NCDENR Permit Modification Attn: Linda Lewis Project No. 106130.PE IWe are sending:l ❑Originals i1 Prints ❑Shop Drawings ®Calculations 'The following items( ❑Correspondence ® Plans ❑ Specifications ®Other as listed below Quantity Date Dwg.No. Description 2 12/10/08 C4.0A,C8.4 Plans(Final Design-Not Released For Construction) 1 Required Items Checklist 2 12/10/08 Stormwater Management Permit Application(1 Original,1 Copy) 1 Wet Detention Basin Supplement 1 12/10/08 I Wet Detention Basin O&M Agreement 1 12/10/08 Stormwater Narrative&Calculations 1 12/9/08 Check#59658 for application fee($505.00) II—ssue Status. ®For Approval ❑As Requested q ❑Construction ❑Bid ❑Fol.Your Use ❑For Review and Comment ❑Approved as Noted ❑See Remarks (Action Taken4 ❑ No Exceptions Taken El Make Corrections Noted ❑ Amend&Resubmit ❑ Rejected-See Remarks ❑ Approved as Submitted ❑ Other !Remarks:I It-EC-EWE° DEC 172U PWQ - Cc: Signed: obert P. Balland, P.E PARAMOUNTE � k/ e\ ' E NJG I NIE E R I NIG . I N G. Off✓ 5 9 1 1 OLEANDER DRIVE , SUITE 2 0 1 LIJ W I L M I N G T O N , NC 28403 9 1 0 - 7 9 1 - 6 7 0 7 ( 0 ) 4 1 0 - 7 9 1 - 6 7 6 0 ( 1 ) LETTER OF TRANSMITTAL To: NCDENR Date 12/11/08 127 Cardinal Drive Extension Wilmington, NC 28403 Re: Myrtle Grove Village— Pond#2 NCDENR Permit Modification Attn:. Linda Lewis Project No. 06130.PE '"a are sen.'...m. ❑ Originals ®Prints ❑Shop Drawings ®Calculations The following items: ❑ Correspondence ® Plans ❑ Specifications ® Other as listed below Quantity Date Dwg.No. Description 2 12/10/08 C4.0A,C8.4 Plans(Final Design-Not Released For Construction) 1 Required Items Checklist 2 12/10/08 Stormwater Management Permit Application(1 Original,1 Copy) 1 Wet Detention Basin Supplement 1 12/10/08 Wet Detention Basin O&M Agreement 1 12/10/08 Stormwater Narrative&Calculations 1 12/9/08 Check#59658 for application fee($505.00) Issue Status: ®For Approval ❑As Requested ❑Construction ❑Bid ❑For Your Use ❑For Review and Comment ❑Approved as Noted ❑ See Remarks &ct1on Taken: ❑ No Exceptions Taken El Make Corrections Noted ❑ Amend&Resubmit ❑ Rejected-See Remarks ❑ Approved as Submitted ❑ Other [Remarks4 Cc: Signed: ,ram, obert P. Balland, P.E. Re:Myrtle Grove Village SW8 060740 Subject: Re: Myrtle Grove Village SW8 060740 From: Linda Lewis <linda.lewis@ncmail.net> Date: Tue, 02 Dec 2008 18:36:43 -0500 To: rballand<rballand@paramounte-eng.com> Robert: You'll have to come in and explain this to me or someone on staff. The drainage area map in the file is confusing- it appears to show only 2 outparcels, A & B, as being within the drainage area of either pond. I can't tell from the DA map that either of the labeled "offsite" areas is draining to either of the ponds. As long as you can demonstrate how the drainage from the offsite area will be intercepted and routed around the pond, then you may submit this as a minor modification. I assume that you will be removing the offsite drainage area from the application as well as the offsite BUA allocated to it? The rules indicate that only increases in BUA or increases in the size of the stormwater control may be subject to review under the new design criteria. You don't appear to be proposing either, but the drainage area reduction and elevation changes will require new pond design calculations to demonstrate that sufficient surface area and volume are available and that the orifice draws the pond down in 2-5 days. Minor modifications should be submitted on the new forms. You simply need to cross out what isn't applicable. Please remember that this is a modification and as such, all of the previously permitting and unchanged information for Pond 1 will need to be included on the application as well as the revised information for Pond 2. You'll need 2 copies of the revised DA map, showing the unchanged DA for Pond 1 and the reduced DA for Pond 2, 2 copies of the revised detail sheet showing the new elevations for Pond 2, and 2 copies of the revised grading plan. Linda rballand wrote: Linda: I need to modify the subject stormwater permit for the following reasons : * Remove future impervious area, off-site #2 from this permit. This will *reduce* the impervious area by 7 . 82 acres or 340, 639sf. * Modify the permanent pool elevation from elev. 15. 0 to 16. 6 and all other elevations accordingly. Since this pond was designed for the 1-inch storm, will this modification change that requirement? Also, if the 1-inch storm is adequate, can we use the existing form for the modification? What is the fee for standard review? 1 of 2 12/3/2008 5:35 PM Re:Myrtle Grove Village SW8 060740 p Regards, Robert P. Balland, P.E. , LEED AP **PARAMOUNTE ENGINEERING, INC. ** 5911 Oleander Drive, Suite 201 Wilmington, NC 28403 910-791-6707 (P) 910-791-6760 (F) 910-619-1186 (M) rballand@paramounte-eng.com <mailto:rballand@paramounte-eng.c"- - www.paramounte-eng.com <http: //www.paramounte-eng.com> 2 of 2 12/3/2008 5:35 PM Myrtle Grove Village SW8 060740 Subject: Myrtle Grove Village SW8 060740 From: "rballand" <rballand@paramounte-eng.com> Date: Mon, 1 Dec 2008 15:48:20 -0500 To: "Linda Lewis" <linda.lewis@ncmail.net> Linda: I need to modify the subject stormwater permit for the following reasons: • Remove future impervious area, off-site#2 from this permit. This will reduce the impervious area by 7.82 acres or 340,639sf. • Modify the permanent pool elevation from elev. 15.0 to 16.6 and all other elevations accordingly. Since this pond was designed for the 1-inch storm, will this modification change that requirement? Also, if the 1-inch storm is adequate_ can we use the existing form for the modification? What is the fee for standard review? Regards, Robert P. Balland, P.E., LEED AP PARAMOUNTE ENGINEERING, INC. 5911 Oleander Drive, Suite 201 Wilmington, NC 28403 910-791-6707(P) 910-791-6760 (F) 910-619-1186 (M) rballandaparamounte-enq.com www.paramounte-enq.com 1 of 1 12/2/2008 6:09 PM pritvRAM_,..) k_.) C121k 'P6 E N G 1 N E E R 1 N G , 1 N C. aP 5 9 1 1 OLEANDER DRIVE , SUITE 2 0 1 042I�WILMINGTON , NC 28403 9 1 0 - 7 9 1 - 6 7 0 7 ( 0 ) 9 1 0 - 7 9 1 - 6 7 6 0 ( F ) LETTER OF TRANSMITTAL To: NCDENR Date 10/20/08 127 Cardinal Drive Extension Wilmington, NC 28403 Re: Myrtle Grove Village Final Storm Water Certification SW8 060740MOD Attn: Chris Baker Project No. 06130.PE We are sending: El Originals El Prints El Shop Drawings ❑Calculations The following items: ❑ Correspondence ❑ Plans ❑ Specifications ® Other as listed below Quantity Date Dwg.No. Description 1 9/22/08 Final Storm Water Certification(SW8 060740MOD) Issue Status: 0 For Approval El As Requested El Construction ❑Bid ❑For Your Use ❑For Review and Comment ❑Approved as Noted El See Remarks [Action Taken: El No Exceptions Taken El Make Corrections Noted El Amend&Resubmit ❑ Rejected-See Remarks El Approved as Submitted El Other 7- iRemarks / al.I2 goo 8 cc Signed: C a-L.—L. .. - Gretchen Merix, E.I.