Facility Number: 9-41 County: Bladen
Facility Name: Jordan Carter - C4 Farms LLC
Certified Operator Name: Jordan Carter Operator # 1010366
Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID): _1
Spillway (Yes or No): —No--No--
Level (inches): _ 1.1 _ I ( _
2. Checkk all applicable items
V Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day l i
Plan of Action is attached. Agronomic balance is within acceptable range. -- CO4wa& 811
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 9 IA4
1 hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
Phone: 910-874-4901
Date: F3 N a q
PoA Cover Page 2121/00
C
IL TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS
-- - FOR ALL WASTE STRUCTURES FOR FACILITY
1. structure ID: 1
line 1=
26135 gallons
2. structure ID: 2
line I =
26234 gallons
3. structure ID:
line 1=
gallons
4. structure ID:
line 1=
gallons
5. structure ID:
line I =
gallons
6. structure ID:
line I =
gallons
n. lines 1+2+3+4+5+6=
o. line n 127154 =
52369 gallons
1.93 acre -inches
III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD"'
'While this section deals with hydraulic loading capacities, applications cannot exceed
agronomic rate for receiving crop according to its certified waste plan.
2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are
not considered available to receive waste.
p. tract #
q. field #
r. soil type
s. Crop
t. acres
u. remaining
IRR-2PAN
balance
(Ib/acre)
V. maximum
application rate
(inthr)
W. maximum
application amount
(inches)
T877
I
Centenary
bermuda rass
1.00
125
0.75
1
T877
1B
Centenary
bermuda rass
1.80
125
0.75
1
T877
2A
Centenary
Bermuda rass
3.00
125
0.75
1
T877
2B
Centenary
bermuda rass
3.401
125
0.75
1
T877
3A
Centenary
bermuda rass
3.801
125
0.75
1
T877
3B
Centenary
bermuda rass
3.50
125
0.75
1
T877
4A
Torhunta
bermuda rass
2.20
125
0.45
1
T877
4B
Torhunta
bermuda rass
1.65
125
0.45
1
T877
5A
Torhunta
bermuda rass
3.40
125
0.45
1
T877
513
Torhunta
bermuda rass
0.76
125
0.45
1
T877
6
Torhunta
bermuda rass
3.40
125
0.45
1
T877
7
Torhunta
bermuda rass
1.70
125
0.45
1
x. total acres available during 5 day draw down (sum of column t) = 29.61 acres
IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE
PoA (5 Day) 2/21/00
Y. line o = 0.07 inches per acre to be applied within 5 days
line x
If unable to land apply hydraulic load listed in line y, list course of action here including pump
and -haul, depopulation, herd -reduction; etc -.--For pump & haul -and -herd -reduction options,— — ----------- -
1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation
still wet but some pulls will dryoutsoonerand will use those to pump
2. Date and amount of last rainfall event?
DATE: 08/08/24
last week
AMOUNT: inches
4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in
assuming we don'tget more rain from the tropical storm.
- include daily schedule; proposed application rates and amounts
per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to
consio
as soon as fields are dry will pump using normal means and rates.
PoA (5 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
5 DAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/ldentifier(ID):
Jordan Carted
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 11.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 8.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 25625 ftZ
e. line c/12 x line d x 7.48 gallons/ft3 127783 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 26023 ft3
h. current herd # 3552 certified herd # 3552
actual waste produced = current herd # x line g = 26023 ft3
certified herd #
i. volume of wash water according to structural design ft3
j. excess rainfall over evaporation according to design 15925 ft3
k. (lines h + i +j) x 7.48 x 5 days/line f= 8716 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/24/24 0,82 Ibs/1000 gal.
m. ((lines e + k)/1000) x line I = 111.9 lbs. PAN
5 Total volume of waste to be land applied during 5 day draw down
1. total volume to be land applied line e + line k = 26135 gallons
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
5 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier(ID): I Jordan Carter
2. Current liquid volume in 25 yr./24 hr. stone storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
g. volume of waste produced according to structural design
11.0 Inches
19.0 inches
8.0 inches
34121 It
170150 gallons
180 days
26086 ft3
h. current herd # F 3552 certified herd #F 3552
actual waste produced = current herd # x line g = 26086 ft3
certified herd #
I. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + 1 +j) x 7.48 x 5 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/24/24
m. ((lines e + k)/1000) x line I =
5 Total volume of waste to be land applied during 5 day draw down
��fta
21247 ft3
9835 gallons
0.82 Ibs/1000 gal.
147.6 Ibs. PAN
I. total volume to be land applied line e + line k : 26234 gallons