HomeMy WebLinkAbout780095_POA for high freeboard_20240808PLAN OF_ACTION _(PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 78-95 County: Robeson
Facility Name: Jackie T
Certified Operator Name: Dean McLean Operator # AWA 24137
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID): 1
Spillway (Yes or No): no.
Level (inches): 15
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality Prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: August 9, 2024
I hereby certify that 1 have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
Dean McLean Phone: 910-734-0214
Facility Owner/Manager (print)
'4S6le Date: 8/8/2024
Facility Owner/Manager (signature)
PoA Cover Page 2121100
1I. TOTAL POUNDS -OF -PAN -STORED -WITHIN STRUCTURAL -FREEBOARD -AND/OR 25-YRa24- -
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: 78-95 Jackie T
2. Structure ID:
3.
Structure ID:
4.
Structure ID:
5.
Structure ID:
-- - 6.-Structure
ID:
n. lines1 +2+3+4+5+6=
line m = 107.6 lb PAN
line m = lb PAN
line m = lb PAN
line m = lb PAN
line m = lb PAN
line m --- - lb PAN ---
107.6 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIFn DURING THIS 3n DAY PFRI
o. tract #
p. field #
q. crop
r. acres
s. remaining
IRR-2PAN
balance
(lb/wre)
t.TOTAL PAN
BALANCE FOR
FIELD (lbs.)
eolumnrxs
a applicafim
window'
Field 4 and 5
bermuda rass
6.76
143.60
970.7
April -Sept
pulls 15
State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 970.7 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 107.6 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 970.7 lb. PAN
y. Overall PAN balance (w - x) = 763 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including
pump and haul, depopulation, herd reduction, etc. Forpump & haul and herd reduction options,
recalculate new PAN based on new information. If newfields are to be included as an option for lowering
lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If
animal waste is to be hauled to another permitted facility, provide information regarding the herd
population and lagoon freeboard levels at the receiving facility.
NARRATIVE:
Will pump assoon as field conditions allow.
'oA (30 Day) 2/2
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
78-95 Jackie T
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 15.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 4.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 27846fe
e. line c/12 x line d x 7.48 gallons/ft3 69429 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design . 26022 ft3
h. current herd # 3552 certified herd # 3552
actual waste produced = current herd # x line g = 26022 ft3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/22/24
m. ((lines e + k)l1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
ft3
17500 ft3
54257 gallons
0.87 Ibs/1000 gal.
107.6 Ibs. PAN
PoA (30 Day) 2121 /00