Loading...
HomeMy WebLinkAbout090097_POA for high freeboard_20240808PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES ______Facility Number: - ..__._..County: Facility Name; onyte P6 f o vvo Certified Operator Name: I { p J Operator # Current liquid levels) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): Spillway (Yes or No): Level (inches): 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to Pumped and hauled is reflected in section III tables. Included within this plan is a list of the Proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior t_ o tr_�nsfe� of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: a fq) al I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. I Iurl f 1IDr1Vor_ Facility Owner/Manager (print) (signature) Phone: Date: A S I a4 PoA Cover Page 2121/00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Hilton Monroe 1 line m = 215.1 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: 4. Structure ID: 5. Structure ID: n. lines 1 + 2 + 3 + 4 + 5 + 6 = line In = lb PAN line m = lb PAN line In = lb PAN 215.1 lb PAN Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT I. IST FIFI n-q Tn WNIrN PAW rA1JWnT Dc ADDr Wn rororran TLRa n MAv DDeinn O, tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (Iblwre) L TOTAL PAN BALANCE FOR FIELD u. application windav' 4628 1AC bermuda 4.30 150.00 645.0 Mar -Sept 4628 1 B bermuda 3.20 150.00 480.0 Mar -Sept 4628 2 bermuda 1.70 150.00 255.0 Mar -Sept 4628 3 bermuda 0.75 150.00 112.5 Mar -Se t State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1492.5 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (linen from section II) = 215.1 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 1492.5 lb. PAN y. Overall PAN balance (w -x) = -1277 lb. PAN Line y must showas a deficit. If line y does not showasa deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. Forpump 8 haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate theoverall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: will begin pumping as soon as field conditions permit. FDA (30 Day) 2121 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD — - -- . -TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Hilton Monroe 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 1.0 1 inches d. top of dike surface area according to design urea at below structural freeboard elevation) 49875 ftZ e. line c/12 x line d x 7.48 gallons/ft3 31089 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 58023 ft3 h. current herd # 1760 certified herd # 1760 actual waste produced = current herd # x line g = 58023 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 5/28/24 m. ((lines e + kyl000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 ft3 29093.8 ft3 108606 gallons 1.54 Ibs/1000 gal. 215.1 Ibs. PAN PoA (30 Day) 2/21100