Loading...
HomeMy WebLinkAbout090169_POA High Freeboard_20240808AN OF ACTION (P®A) FOP, HIGH FREEBOARD AT ANIMA, FACILITIES -- Nity-Number. --- -- m - LO n� -- -- hacilityPlame: &1'FGL'ch'1S Certified Operator Name: Ckc'-Y�er' Operator# «0280 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): Spillway (Yes or No): Level (inches): I 0 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. w' &,'r f e s pr,e Facility Owner/Manager (print) Phone: !l16- d76•-Z202- Cha,-� bJ, . d&� �- Date: g Facility Owner/Manager (signature) PoA Cover Page 2121100 _- —fl TOTAt1/OLUME OFWASTESTORED WITHINSTRUCTURALFREEBOARD-E-LEVATIONS-- — FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: Gillespie line I = 125988 gallons 2, structure ID: line I = gallons 3. structure ID: line I = gallons 4. structure ID: line I = gallons 5. structure ID: line I = gallons -6. structure ID: _ _ line [=- -gallons n. lines1+2+3+4+5+6= o. line n / 27154 = 125988 gallons 4.64 acre -inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD''2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type s. crop t. acres u. remaining IRR-2 PAN balance (Ib/acre) v. maximum application rate (inmr) w. maximu m applicati 1754 12 Dr bermuda 1.6 100 0.4 1 1754 14 GrB bermuda 2.1 100 0.5 1 1754 15 Dr bermuda 9.2 100 0.4 1 1754 6 GrB bermuda 4 1001 0.5 1 1754 8 Dr bermuda 1.6 100 0.4 1 1754 15 Dr bermuda 9.2 100 0.4 1 x. total acres available during 5 day draw down (sum of column Q = 27.70 acres PoA (5 Day) 2/21/00 — IV:fACILiTY'S PoA OVERALL HYDRAULIC -LOAD -TO -BE -LAND APPLIED -PER -ACRE -- ---- y. line o = 0.17 inches per acre to be applied within 5 days line x If unable to land apply hydraulic load listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, Plan to 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation equipment mar down in field; "trafficability" across soils will soils absorb application without runoff, etc.) Irrigation will take place as soon as weatherand land conditions permit. 2. Date and amount of last rainfall event? DATE: F 08/08/24 week AMOUNT: -7 lus inches 4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in Pumping assoil/fieldsdryout. 5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to Imgateasweather and land conditions permit. Will pump short times, ondryerfields. PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD 1. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I Gillespie 2. Current liquid volume in structural freeboard a. current liquid level according to marker 10.0 inches b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 2666 certified herd # 3200 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h+ i +j) x 7.48 x 5 days/line f= 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = 12.0 inches 2.0 inches 78408 ft2 97749 gallons 180 days 105497 ft3 87892 ft3 Oft3 48020 ft3 28240 gallons 125988 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HP, STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: GillesRie line m 1142.6 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6= 1142.6 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD_ o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (Iblacre) t. TOTAL PAN BALANCEFOR FIELD (Ibs.) column r x s u. application window' 1754 12 bermuda rass 1.60 100.00 160.0 March -Sept 1754 14 bermuda rass 1.60 100.00 160.0 March -Sept 1754 15 bermuda rass 9.20 100.00 920.0 March -Sept 1754 6 bermuda rass 4.00 100.00 400.0 MarchSe t 1754 8 bermuda rass 1.60 100.00 160.0 March -Sept **guestimate on PAN left 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1800.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = 1142.6 lb. PAN x. Crop's remaining PAN balance (line v from section 111) = 1800.0 lb. PAN y. Overall PAN balance (w - x) = -657 lb. PAN NARRATIVE Will begin pumping assoon asfield conditions permit. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Gilles ie 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line U12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design 10.0 inches 19.0 inches 9.0 inches 78408 W 439869 gallons 180 days 105497 ft3 h. current herd # 3200 certified herd # 3200 actual waste produced = current herd # x line g = 105497 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I, current waste analysis dated F 6126/24 m. ((lines e + ky1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) �ft3 48020 ft3 191385 gallons 1.81 Ibs/1000 gal. 1142.6 lbs. PAN PoA (30 Day) 2/21 /00