HomeMy WebLinkAbout820655_Routine Insprction_20240730Date of Visit: 3 p Arrival Time: QQ Departure Time: U ounty: S=: i , 21
Farm Name: se4r ' Owner Email:
Owner Name: �Q Phone:
Mailing Address:
Physical Address:
Facility Contact: d 4D� Title:
Onsite Representative:
Certified Operator: ,,i (`�' /
v-_d 6
Back-up Operator:
Location of Farm:
Latitude:
Phone:
Region: Y w
Integrator:���
Certification Number: �C3QGj) �J
Certification Number:
Longitude:
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes ED No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
❑ Yes
❑ No
❑ NA
❑ NE
❑ Yes
❑ No
❑ NA
❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑' No ❑ NA ❑ NE
❑ Yes, No ❑ NA ❑ NE
Page I of 3 511212020 Continued
Facili Number: - 67 37—Date of Inspection: 2gt
di
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes ,❑'No
❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes ❑ No
❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Structure 5 Structure
6
Identifier: f
Spillway?:
Designed Freeboard (in): J c/
Observed Freeboard (in): J-17
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes ❑Ko
❑ NA ❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes �o
❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health
or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes Ej`Ro
❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes ❑'No
❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes _O'No
[j NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes E]'No
❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes 1:14Io
❑ NA ❑ NE
❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals
(Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 101bs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into
Bare Soil
❑ Outside of Acceptable Crop Window Evidence of Wind Drift ❑, Outside of Approved Area
E❑ •Application
12. Crop TYpe(s): L
a
13. Soil Type(s): (j ti 4
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes . fNo
❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement?
[—]Yes Q o
❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes No
ja
❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes ,[ffNo
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
[:]Yes EJ'No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes —ENo
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes f-Ro
❑ NA
❑ NE
the appropriate box.
❑WUP ❑Checklists ❑Design ❑ Maps [:]Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes �o ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ET5o ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑' V�o ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facility Number: Date of Ias ection: t) a
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes _e No
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes J:�No
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge?
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
34. Does the facility require a follow-up visit by the same agency?
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
n e A�/'/;is(yrJ
❑NA ❑NE
❑NA ❑NE
❑ Yes_,allo ❑ NA ❑ NE
❑ Yes allo ❑ NA ❑ NE
❑ Yes �No ❑ NA ❑ NE
❑ Yes L2,1�o ❑ NA ❑ NE
❑ Yes O No ❑ NA ❑ NE
❑ Yes 13-No ❑ NA ❑ NE
❑ Yes
EJ/No
❑ NA
❑ NE
❑ Yes
e'No
❑ NA
❑ NE
❑ Yes
M�No
❑ NA
❑ NE
Phone: 116 S?35 qWS�
Date: ; 60 /P y
511212020
racurty NO, O1-�S S Time In
Farm Name L11Time Out
�
r% w.
Owner lmegra
Operator —
Site Re
Sack -up No.
No.
UOC Circle: General
or NPDES
FREE3OA.,.. Ueaign
Observed
Crop Yield
Rain Gauge
Soil Test �3 Wettable Acres
Weekly Freeboard 1/ Daily Rainfall i
Spray/Freeboar Drop
Weather Codes 120 min Inspections
Waste Analysis:
Date Nitrogen (N)
0
Date
Sludge Survey J7
Calibration/GPM _ rb/!(1
Waste Transfers
Rain Breaker
PLAT
1-in Inspections —
Date Nitrogen (N)
/2 �3
�l12 j)